会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Technique for transmitting supporting reaction of additional wall
    • 用于发送附加壁支持反应的技术
    • JP2007063853A
    • 2007-03-15
    • JP2005251523
    • 2005-08-31
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YOKOMIZO KATSUYUKIKANO MAMORUHIRAO KENICHIODAJIMA ATSUSHI
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide a countermeasure technique for safely and reliably transmitting supporting reaction to upper structures during work for the base isolation of a structure when installing a temporarily supporting jack or a base isolation device on a position of bias from a column to support the vertical load of the upper structures.
      SOLUTION: In the supporting reaction transmitting technique, the temporarily supporting jack 4 is installed on the position of bias from the column, and when shifting the vertical load of the upper structures 6B, 7B if the upper structures 6A, 7A right over the temporarily supporting jack cannot support the axial force of the temporarily supporting jack, an additional wall is provided on an upstairs body right over the jack to transmit the supporting reaction of the temporarily supporting jack to the upper structures and the column with the assistance of the additional wall.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种对策技术,用于在工作期间安全可靠地将支撑反应传递到结构的基部隔离,当将临时支撑的千斤顶或基座隔离装置安置在偏置的位置时 柱支撑上部结构的垂直载荷。 解决方案:在支撑反应传输技术中,临时支撑千斤顶4安装在从塔的偏压位置,并且当上部结构6A,7A正好移动时移动上部结构6B,7B的垂直载荷 临时支撑千斤顶不能支撑临时支撑千斤顶的轴向力,附近的壁设置在位于千斤顶上方的楼上的身体上,以将临时支撑的千斤顶的支撑反作用于上述结构和塔的支撑反作用力 额外的墙。 版权所有(C)2007,JPO&INPIT
    • 3. 发明专利
    • FOUNDATION CONSTRUCTION FOR ULTRA-HIGH TOWER AND CONSTRUCTION METHOD THEREFOR
    • JP2001164582A
    • 2001-06-19
    • JP37634799
    • 1999-12-06
    • TAKENAKA KOMUTEN CO
    • MURATA KOJIYOSHIDA KEIKISAWAMURA MAKIHITOITO TAKESHIYOKOMIZO KATSUYUKIMATSUO KOJI
    • E02D27/32
    • PROBLEM TO BE SOLVED: To provide a foundation construction or the like for an ultra-high tower (for example, higher than 300 m) with a towering ratio of more than 5 capable of suppressing the site area to a small value. SOLUTION: In a surrounding portion of a lower portion of an ultra-high tower 30 on the ground 10, an outer peripheral diaphragm wall pile 21 with a closed cross section penetrating a supporting ground layer 11 is constructed, and at the inner side of this wall pile 21, an inner continuous underground wall pile 22 with a closed cross section penetrating the bearing ground layer 11 by lowering the upper end from the ground surface at least by the thickness of the mat slab or a number of inner cast-in- place concrete piles are constructed and a mat slab 25 of reinforced concrete is constructed in one united body with these at the upper side of the concrete pile or the wall pile 22 at the inner side of the upper portion of the concrete pile or at the inner side of the upper portion of the concrete pile, and an ultra-high tower having the towering ratio of 5 or larger is constructed by coupling its bottom portion to the foundation 21, 25, therefore, the vertical rigidity and rotation rigidity of the foundation can be improved, and the safety of the ultra-high tower against a long-term large load, overturning against wind, and against overturning during earthquake can be secured.
    • 8. 发明专利
    • Technique for reforming and constructing underfloor portion of hanging body of existing structure
    • 改造和建造现有结构体系的下放部分的技术
    • JP2007063903A
    • 2007-03-15
    • JP2005253353
    • 2005-09-01
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YOKOMIZO KATSUYUKIKANO MAMORUHIRAO KENICHISAITO YUICHIARAI MITSUNORIKOSAKA NORIONISHIMURA TAKUYATAYA YUJIODAJIMA ATSUSHI
    • E04G23/06E04G23/02
    • PROBLEM TO BE SOLVED: To provide a technique for excavating an underfloor portion of a hanging body of an existing structure having the hanging body under a ground in a structurally stable condition and reforming and constructing a new underground body without leaving the site. SOLUTION: The technique comprises a step of constructing a bordering wall 2 on the outer periphery of the hanging body 1 of the existing structure 10 and primarily excavating a ground between the bordering wall 2 and the hanging body 1 to the extent that a foundation 4 of the hanging body 1 is exposed, a step of installing a pile body 5 in an excavation site to support the foundation 4 of the hanging body 1, constructing a concrete retaining wall 6 to integrate the hanging body 1, the pile body 5 and the bordering wall 2 together, and shifting the support of the hanging body 1 to that of the pile body 5 and the bordering wall 2, and a step of secondarily excavating the ground up to a requires depth thereafter and reforming and constructing the new underground structure in the excavation site. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种技术,用于在结构稳定的条件下,将具有悬挂体的现有结构的悬挂体的底部底部挖掘并重新构建新的地下体而不离开现场。 解决方案:该技术包括在现有结构10的悬挂体1的外周上构造边界壁2的步骤,并且主要在边界壁2和悬挂体1之间挖掘地面, 悬挂体1的基座4露出,将桩体5安装在挖掘部位的步骤,以支撑悬挂体1的基座4,构成将悬挂体1,桩体5 并且接合壁2在一起,并且将悬挂体1的支撑件移动到桩体5和边界壁2的支撑件,并且此后将地面二次挖掘到需要深度的步骤,并重新构建新的地下 挖掘现场的结构。 版权所有(C)2007,JPO&INPIT
    • 9. 发明专利
    • METHOD FOR CONSTRUCTION OF ULTRA HIGH-RISE TOWER
    • JP2001349096A
    • 2001-12-21
    • JP2000205904
    • 2000-06-02
    • TAKENAKA KOMUTEN CO
    • MURATA KOJIYOSHIDA KEIKISAWAMURA MAKIHITOITO TAKESHIYOKOMIZO KATSUYUKIMATSUO KOJI
    • E04B1/18E04B1/30E04B1/35E04G11/22E04G21/14E04H12/00
    • PROBLEM TO BE SOLVED: To provide a method for construction of high-rise tower with a towering ratio of 5 or more, capable of assuring a safety during the operation at an ultra high position, protecting the peripheral environment which may be deteriorated by the loading and unloading of a large volume of materials, strictly observing a construction period by safely performing the operation irrespective of whether the weather is fine or rainy, and improving cost effectiveness. SOLUTION: An intermediate structural body 20 for observation room is constructed on a base Ft, and a lower structural body 10 is constructed in the working space formed inside the intermediate structural body 20 in order from the lower side to the upper side thereof. As rising the upper portion of the constructed lower structural body the intermediate structural body is successively raised by the reaction of the constructed portion, and the tower-like upper structural body 30 is constructed in the working space formed inside the intermediate structural body in order from the upper side to the lower side thereof to raise the constructed portion in order. The upper part of the completed lower structural body is connected to the intermediate structural body, and the lower part of the completed upper structural body is connected to the intermediate structural body. By the utilization of the intermediated for the observation room structural body, a temporary installation cost can be reduced remarkably.