热词
    • 2. 发明专利
    • Block joint and block frame
    • 块联合框架
    • JP2012172419A
    • 2012-09-10
    • JP2011036079
    • 2011-02-22
    • Shimizu CorpUnytite Co Ltdユニタイト株式会社清水建設株式会社
    • YOMO HIROAKIINOUE KEIMEIKANEMARU KIYOTOASO TOSHIMITSUINOUE TOMIHISAMIYATA KATSUHARU
    • E21D11/04
    • PROBLEM TO BE SOLVED: To provide an effective and appropriate block joint capable of connecting various block frames such as segments with each other by a single operation; and a block frame to be connected by the block joint.SOLUTION: Block joints 2(2A,2B) with a fitting part installed in both joint end surfaces of a pair of block frames (segment 1A,1B) and for sliding the mutual joint end surfaces in a single direction so as to fit and join them mutually comprises the fitting part and a fixing part. The fitting part is extended in a sliding direction of the block frame while the fitting part has the same cross section in the sliding direction, and a fitting part shaft in an extended direction of the fitting part is disposed in a tilting state so as to approach the side of the other block frame as the block frame moves toward the sliding direction relative to the other block frame. The fitting part is the fitting part of a linear steel sheet pile and the fixing part is a plate part of the linear steel sheet pile. The intermediate part of the fixing part is shaped in a folding form.
    • 要解决的问题:提供一种能够通过单次操作来连接诸如段之间的各个框架的有效和适当的块接头; 以及通过块接头连接的块框架。 解决方案:具有安装在一对框架(段1A,1B)的两个接合端面中的配合部分的块接头2(2A,2B),并且用于沿单个方向滑动相互接合的端面,以便 相互配合并相互连接,包括装配部分和固定部分。 嵌合部在滑动方向上具有相同的横截面,并且嵌合部的延伸方向的嵌合部轴以倾斜状态配置为接近,从而在嵌合框架的滑动方向上延伸 当框架框架相对于另一块框架朝向滑动方向移动时,另一块框架的侧面。 装配部分是线性钢板桩的装配部分,固定部分是线性钢板桩的板部分。 固定部分的中间部分成形为折叠形状。 版权所有(C)2012,JPO&INPIT
    • 3. 发明专利
    • Screw cutter mechanism and excavating equipment using the same
    • 螺丝切割机构和使用相同的设备
    • JP2010037912A
    • 2010-02-18
    • JP2008205724
    • 2008-08-08
    • Kayaba System Machinery KkShimizu Corpカヤバ システム マシナリー株式会社清水建設株式会社
    • ASO TOSHIMITSUINOUE KEIMEIKUHARA TAKASHIWATABE TSUTOMUUEHARA YOSHIFUMIODAKA HIROYUKIKONDO YASUNARI
    • E21D9/087
    • PROBLEM TO BE SOLVED: To enable an improvement in agitation performance and the adjustment of a transfer performance; and to suppress the occurrence of ground surface settlement by changing the transfer capacity of cut sediment in the direction of a rotating shaft so as to maintain constant pressure corresponding to the earth pressure of the ground. SOLUTION: In a screw cutter 20, a set of spiral blade 22 is provided around the shaft portion 21, and a cutting bit 23 is attached to an outer peripheral portion of the spiral blade 22. The ground is cut with the cutting bit 23 by the axial rotation of a spiral blade 22, and the cut sediment is transferred to the side of earth removal. A plurality of openings 24, 24, etc. are formed along a spiral winding direction on the shaft portion 21 side of the spiral blade 22; an opening ratio of the openings 24 becomes smaller toward the side of the earth removal; and the spacing between the arranged openings becomes wider toward the side of the earth removal. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:为了改善搅拌性能和调节转印性能; 并且通过改变切屑沉积物在旋转轴的方向上的转移能力来抑制地面沉降的发生,以保持对应于地面土压力的恒定压力。 解决方案:在螺旋切割器20中,围绕轴部21设置有一组螺旋形叶片22,并且切割钻头23附接到螺旋叶片22的外周部分。切割地面用切割 钻头23通过螺旋叶片22的轴向旋转,并且切割的沉积物被转移到除尘侧。 在螺旋叶片22的轴部21侧沿着螺旋卷绕方向形成多个开口部24,24等; 开口24的开口率朝向地面移除侧变小; 并且布置的开口之间的间距朝向地面移除侧面变宽。 版权所有(C)2010,JPO&INPIT
    • 5. 发明专利
    • High-performance perforated steel plate dowel
    • 高性能执行钢板瓦
    • JP2014118723A
    • 2014-06-30
    • JP2012273890
    • 2012-12-14
    • Shimizu Corp清水建設株式会社
    • KOSHIISHI MASAMINAKAYAMA KENJIINOUE KEIMEIYOSHITAKE KENJI
    • E01D19/12E01D2/00E04B1/16E04B1/21E04B1/30
    • PROBLEM TO BE SOLVED: To provide a high-performance perforated steel plate dowel capable of exerting required performance even under the simultaneous action of an axial force, bending moment and a shear force.SOLUTION: A high-performance perforated steel plate dowel 10, which is protrusively provided on a member 12, has a perforated steel plate 16 that is embedded in concrete 14 and used to connect the member 12 and the concrete 14 together. The high-performance perforated steel plate dowel comprises a flange plate 20 that is welded to the side 16b opposite to the side 16a of making the perforated steel plate 16 fixed to the member 12, and a hoop reinforcement 22 that is arranged around the perforated steel plate 16.
    • 要解决的问题:提供即使在轴向力,弯矩和剪切力的同时作用下也能施加所需性能的高性能穿孔钢板榫。解决方案:一种高性能穿孔钢板榫10,其中 突出地设置在构件12上,具有嵌入混凝土14中并用于将构件12和混凝土14连接在一起的穿孔钢板16。 高性能多孔钢板榫钉包括一个凸缘板20,该凸缘板20焊接到与制造穿孔钢板16固定在构件12上的侧面16a相对的侧面16b上,以及围绕加强钢板 板16。
    • 6. 发明专利
    • Structure for joining steel segment and rc member together
    • 钢结构和RC会员协会的结构
    • JP2012246660A
    • 2012-12-13
    • JP2011118236
    • 2011-05-26
    • Shimizu Corp清水建設株式会社
    • OGAWA AKIRAINOUE KEIMEINAKAYAMA KENJIYOSHIMURA YURI
    • E21D11/10E21D11/14
    • PROBLEM TO BE SOLVED: To provide a structure for joining a steel segment and an RC member together, which can reliably and simply join the steel segment and the RC member together.SOLUTION: A structure for joining a steel segment and an RC member together is used to join the steel segment 2 as a steel shell of a shield tunnel and the RC member provided on the outer peripheral surface side of the steel segment. In the structure, perforated steel plates 24 formed with hole parts 25 are joined to main girders 21 and 21 of the steel segment 2 in such a manner as to protrude from the outer peripheral surface of the steel segment 2, and embedded in the concrete of the RC member.
    • 要解决的问题:提供一种用于将钢部分和RC部件接合在一起的结构,其可以可靠且简单地将钢部分和RC部件连接在一起。 解决方案:将用于将钢段和RC构件接合在一起的结构用于将作为屏蔽通道的钢壳的钢段2和设置在钢段的外周面侧的RC构件接合。 在该结构中,形成有孔部25的穿孔钢板24以从钢段2的外周面突出的方式接合到钢段2的主梁21和21,并且嵌入在钢构件2的混凝土中 RC成员。 版权所有(C)2013,JPO&INPIT
    • 8. 发明专利
    • Inter-tunnel excavation method and inter-tunnel excavator
    • 隧道掘进方法和隧道掘进机
    • JP2010018969A
    • 2010-01-28
    • JP2008178533
    • 2008-07-09
    • Hitachi Zosen CorpShimizu Corp日立造船株式会社清水建設株式会社
    • UEHARA YOSHIFUMIASO TOSHIMITSUINOUE KEIMEISUZUKI MASANORIHANAOKA TAIJIONISHI AKIYUKI
    • E21D9/06
    • PROBLEM TO BE SOLVED: To excavate the natural ground between two tunnels over a wide range efficiently.
      SOLUTION: When the natural ground between two tunnels T formed at the predetermined interval therebetween is excavated to connect both of tunnels T mutually, a jacking frame 11 supported by upper and lower rail members Ru, Rd and a supporting column member P in both of tunnels T by main and auxiliary gripper devices 13, 14 is arranged in an advance space E formed between both of tunnels T to support excavation reaction force by the upper and lower rail members Ru, Rd and the supporting column member P and excavate the natural ground between both of tunnels T by the excavator 12 installed in the jacking frame 11 to form an excavation space. The supporting column member P supports jacking reaction force and the jacking frame 11 is made to advance along the excavation space by a jacking device 15 provided in the jacking frame 11.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:有效地在广泛的范围内挖掘两条隧道之间的自然地面。 解决方案:当在两个隧道T之间形成的两个隧道T之间的自然地面被挖掘以相互连接两个隧道T时,由上下轨道构件Ru,Rd和支撑柱构件P支撑的起重框架11 通过主和辅助夹持装置13,14的两个隧道T布置在形成在两个隧道T之间的前进空间E中,以支撑上下轨道构件Ru,Rd和支撑柱构件P的挖掘反作用力,并挖掘 通过安装在起落架11中的挖掘机12在两个隧道T之间的自然地面,以形成挖掘空间。 支撑柱构件P支撑顶升反作用力,顶升框架11通过设置在起落架11中的顶升装置15沿着挖掘空间前进。(C)2010年,JPO和INPIT