    • 3. 发明专利
    • Main column member of steel pipe tower filled with concrete, and construction method for steel pipe tower
    • 钢管塔顶部填充混凝土主柱,钢管塔结构方法
    • JP2003321947A
    • 2003-11-14
    • JP2002129426
    • 2002-04-30
    • Chubu Electric Power Co IncShimizu Corp中部電力株式会社清水建設株式会社
    • URANO SHINJINOMURA TOMOHIRONAGURA KENJITAKAZAWA YUJIYAMAMOTO ICHIROSAITO SATORUYAMAMOTO TETSUHIROKITAZAWA SATOSHI
    • E04H12/14E04C3/34
    • PROBLEM TO BE SOLVED: To provide main column members of a steel pipe tower filled with concrete having a high workability at a low cost, and a construction method for steel pipe tower filled with concrete.
      SOLUTION: Hollow steel pipes are connected together in up-down direction, and a connected body 3 of the hollow steel pipes is assembled. A filler 5 is placed under pressure at a low speed from a filler inlet 7 to near a bottom end portion of a preliminary mortar filler inlet 8 where the top of filled mortar is located. Placing of the filler 5 is interrupted, and a predetermined amount of preliminary mortar 6 first is poured above the top position of the filler 5 from the mortar filler inlet 8. A top hoper 16 is installed to the highest portion of the connected body 3 of the hollow steel piles, and the filler 5 is poured again under pressure until the top end portion reaches near an intermediate portion of the top hoper 16. Upon completion of pouring the filler 5 under pressure, surplus filler 5 remaining in the top hopper 16 is discarded when sedimentation is completed before the hardening of the filler 5, then the top hopper 16 is removed and the top surface of the connected body 3 of the hollow steel pipes is leveled.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:以低成本提供填充有高加工性的混凝土的钢管塔的主柱构件,以及填充有混凝土的钢管塔的施工方法。

      解决方案:空心钢管沿上下方向连接在一起,组装中空钢管的连接体3。 将填料5从填料入口7以低速压力放置在填充砂浆顶部所在的预备砂浆填料入口8的底端附近。 填料5的放置被中断,并且首先将预定量的预备砂浆6从砂浆填料入口8注入到填料5的顶部位置之上。顶部搅拌器16安装到连接体3的最高部分 中空的钢桩和填料5在压力下再次注入,直到顶端部分到达顶部浇料16的中间部分附近。在填充物5在压力下完成时,留在顶部料斗16中的剩余的填料5是 在填料5硬化之前完成沉淀时丢弃,然后卸下顶部料斗16,并且中空钢管的连接体3的上表面平整。 版权所有(C)2004,JPO