会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Early evaluation by fall-off testing
    • 通过脱落测试进行早期评估
    • US5555945A
    • 1996-09-17
    • US290653
    • 1994-08-15
    • Roger L. SchultzH. Kent BeckPaul D. RinggenbergRonald L. Hinkie
    • Roger L. SchultzH. Kent BeckPaul D. RinggenbergRonald L. Hinkie
    • E21B33/124E21B47/06E21B49/00E21B49/08
    • E21B49/088E21B33/1243E21B47/06E21B49/008
    • Early evaluation testing of a subsurface formation is provided by monitoring pressure fall-off in the formation. This is accomplished by providing a column of fluid in the well having an overbalanced, hydrostatic pressure at the subsurface formation greater than a natural formation pressure of the subsurface formation. A testing string is run into the well, and the testing string includes a packer, a pressure monitor and a closure tool arranged to close a bore of the testing string. The formation is shut in by setting the packer and closing the bore of the testing string with the closure tool and thereby initially trapping the overbalanced hydrostatic pressure of the column of fluid in the well below the packer. Then the pressure in the well below the packer is monitored as it falls off toward the natural formation pressure. This data can be extrapolated to estimate the natural formation pressure based upon a relatively short actual test interval on the order of ten to fifteen minutes.
    • 通过监测地层中的压力下降来提供地下地层的早期评估试验。 这通过在井中提供一列流体在地下地层处具有超过地下地层的天然地层压力的过平衡静水压力来实现。 测试字符串运行到​​井中,测试串包括封隔器,压力监视器和用于封闭测试串的孔的闭合工具。 通过设置封隔器并用封闭工具封闭测试柱的孔,从而最初将流体柱的流体静压力初始地捕获在封隔器下面的井中,从而关闭地层。 然后在封隔器下面的井中的压力随着朝向天然地层压力的下降而被监测。 该数据可以外推,以基于十到十五分钟的相对短的实际测试间隔来估计天然地层压力。
    • 2. 发明授权
    • Integrated well drilling and evaluation
    • 综合钻井和评估
    • US06236620B1
    • 2001-05-22
    • US08757150
    • 1996-11-27
    • Roger L. SchultzH. Kent BeckPaul D. RinggenbergJ. Allan ClarkKevin R. Manke
    • Roger L. SchultzH. Kent BeckPaul D. RinggenbergJ. Allan ClarkKevin R. Manke
    • G01V140
    • E21B49/088E21B33/1272E21B33/1275E21B47/00E21B47/06E21B49/00E21B49/081
    • Integrated drilling and evaluation systems and methods for drilling, logging and testing wells are provided. The drilling and evaluation systems are basically comprised of a drill string, a drill bit carried on a lower end of the drill string for drilling a well bore, logging while drilling means included in the drill string for identifying subsurface zones or formations of interest, packer means carried on the drill string above the drill bit for sealing a zone or formation of interest below the packer means, and a fluid testing means included in the drill string for controlling the flow of well fluid from the zone or formation of interest into the drill string. The drilling and evaluation systems and methods for using the systems allow one or more subsurface zones or formations of interest in a well to be drilled, logged and tested without the necessity of removing the drill string from the well.
    • 提供了钻井,测井和测井综合钻井和评估系统和方法。 钻井和评估系统基本上包括钻柱,用于钻井的钻柱的下端承载的钻头,包括在钻柱中的钻孔装置的记录,用于识别感兴趣的地下区域或地层,封隔器 在钻头上方的钻柱承载的装置,用于密封封隔器装置下方的区域或形成层,以及包括在钻柱中的流体测试装置,用于控制井流体从所述区域或形成物流入钻头 串。 用于使用系统的钻井和评估系统和方法允许钻井,记录和测试中的一个或多个感兴趣的地下区域或地层,而不需要从井中移除钻柱。
    • 3. 发明授权
    • Early evaluation system
    • 早期评估体系
    • US5540280A
    • 1996-07-30
    • US292131
    • 1994-08-15
    • Roger H. SchultzH. Kent BeckPaul D. Ringgenberg
    • Roger H. SchultzH. Kent BeckPaul D. Ringgenberg
    • E21B23/00E21B27/02E21B33/12E21B33/124E21B49/08E21B47/00
    • E21B23/006E21B27/02E21B33/12E21B33/1246E21B49/082
    • A number of improvements are provided in early evaluation systems which can be utilized to test and/or treat a subsurface formation intersected by an open uncased borehole. An outer tubing string is run into the well and has a packer which is set in the open, uncased borehole above the subsurface formation of interest. An inflation passage is provided and preferably has an inflation valve associated therewith which is operated by manipulation of the tubing string. A communication passage communicates the interior of the outer tubing string with the borehole below the packer. An inner well tool is run into the outer tubing string and engaged therewith, whereupon it is placed in fluid communication with the subsurface formation to either sample the formation or treat the formation. Preferably, a circulating valve is provided above the packer to allow fluid circulation in the well annulus during the testing procedure to prevent differential sticking of the outer tubing string. The inner well tool may include an inner tubing string, preferably coiled tubing, which may include annulus pressure responsive tester valves therein.
    • 早期评估系统中提供了许多改进措施,可用于测试和/或处理由开放的未钻井钻孔相交的地下地层。 外部管柱进入井,并具有一个封隔器,该封隔器设置在感兴趣的地下地层上方的开放的,未钻井的井眼中。 提供充气通道并且优选地具有与其相关联的充气阀,其通过操纵管柱来操作。 连通通道将外管柱的内部与封隔器下方的钻孔连通。 内井工具进入外管柱并与其接合,于是它被置于与地下地层流体连通以对地层进行采样或处理。 优选地,循环阀设置在封隔器上方,以允许在测试过程期间在井环中流体循环,以防止外管柱的不均匀粘附。 内部井具可以包括内部管柱,优选地是连续油管,其可以包括其中的环形压力响应测试阀。