会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Method for charging ore raw material and solvent to refining furnace
    • 用于对原材料进行充填的方法和用于精炼炉的方法
    • JP2011074432A
    • 2011-04-14
    • JP2009225701
    • 2009-09-30
    • Pan Pacific Copper Co Ltdパンパシフィック・カッパー株式会社
    • SOMA YUKIHOSHI MITSUMASATAKAHASHI MASAHARU
    • C22B15/00F27B3/18F27D3/18
    • PROBLEM TO BE SOLVED: To provide a method for charging an ore raw material and a solvent to a refining furnace, by which an increase in the variation of the grade of SiO
      2 in slag which has been a problem in the conventional method is suppressed as far as possible, and which can achieve stabilization of slag components.
      SOLUTION: In the method for charging the ore raw material and the solvent to the refining furnace, a pulverized and dried solvent 10 mainly composed of silicic acid ore is conveyed to directly before a refining furnace by a first conveyance system, on the other hand, a pulverized and dried ore raw material 20 is conveyed to directly before the refining furnace by a second conveying system, and the solvent 10 and the ore raw material 20 are mixed directly before their charge to the refining furnace and are then charged to the refining furnace. In the method, the solvent 10 is charged within a chamber 31 into an air flow where the ore raw material 20 is conveyed by an air current by a pneumatic tube 21, then they are uniformly mixed, and thereafter, the mixture is charged to the refining furnace.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种将矿石原料和溶剂装载到精炼炉中的方法,通过该方法,炉渣中SiO 2 的等级变化增加, 常规方法的问题尽可能地被抑制,并且可以实现炉渣组分的稳定化。 解决方案:在将矿石原料和溶剂装入精炼炉的方法中,主要由硅酸矿石组成的粉碎和干燥的溶剂10通过第一输送系统直接输送到精炼炉之前, 另一方面,粉碎和干燥的矿石原料20通过第二输送系统直接输送到精炼炉前,溶剂10和矿石原料20在进料到精炼炉之前直接混合,然后加入 精炼炉。 在该方法中,将溶剂10在室31内装入通过气动管21通过气流输送矿石原料20的空气流中,然后将其均匀混合,之后将混合物装入 精炼炉。 版权所有(C)2011,JPO&INPIT
    • 3. 发明专利
    • Structure of lance inserting hole part
    • 插入孔结构部分
    • JP2012067372A
    • 2012-04-05
    • JP2010215129
    • 2010-09-27
    • Pan Pacific Copper Co Ltdパンパシフィック・カッパー株式会社
    • TODA KATSUYAHOSHI MITSUMASAOKAMURA HIROHARU
    • C22B15/00C22B5/10F27B3/16
    • PROBLEM TO BE SOLVED: To provide a structure of a lance inserting hole part with which a long service life of the structure of a lance inserting hole part and near the lance inserting hole part, is planned, and the deterioration of gas-leakage and waste-acid developing ratio can be restrained for a long term.SOLUTION: In the structure 20 for a lance inserting hole part, forming the lance inserting hole part 112 for inserting a lance 2 which injects reducing agent toward fused material stuck to the inner wall of a self-fluxing furnace for smelting a copper, on the furnace roof part of the uptake-part in the self-fluxing furnace; this structure for lance inserting hole part is provided with a water-jacket part 28 having a cylindrical circumferential wall, which forms the lance inserting hole part having the size enabling to insert the lance and cooling tube ways 42a, 42b arranged in the circumferential wall of the water-jacket part and enabling to flow cooling medium.
    • 要解决的问题:为了提供一种喷枪插入孔部分的结构,其中计划了喷枪插入孔部分的结构和喷枪插入孔部分附近的使用寿命长, 泄漏和废酸发生率可以长期受到限制。 解决方案:在用于喷枪插入孔部分的结构20中,形成用于插入喷射还原剂的喷枪2的喷枪插入孔部分112,所述喷枪2朝向熔融材料粘附到熔化铜的内壁上的熔融材料熔化铜 ,在自熔炉中的吸收部分的炉顶部分上; 这种用于喷枪插孔部分的结构设置有具有圆柱形周壁的水套部分28,其形成具有能够插入布置在其周壁中的喷枪和冷却管路42a,42b的尺寸的喷枪插入孔部分 水套部件,能够流动冷却介质。 版权所有(C)2012,JPO&INPIT
    • 6. 发明专利
    • Method for smelting copper
    • 铜冶炼方法
    • JP2009293054A
    • 2009-12-17
    • JP2008144706
    • 2008-06-02
    • Pan Pacific Copper Co Ltdパンパシフィック・カッパー株式会社
    • MOTOMURA TATSUYASUZUKI YOSHIAKITAKAHASHI MASAHARUHOSHI MITSUMASA
    • C22B15/00
    • C22B15/0047C22B5/04C22B15/0052C22B15/0054
    • PROBLEM TO BE SOLVED: To provide a method for smelting copper, in which the generation of Fe
      3 O
      4 is restrained while restraining a producing cost.
      SOLUTION: The method for smelting the copper includes a process for supplying oxygen-enriched air and copper concentrate without supplying coke, into a furnace, and a process for supplying pig iron into slag generated in the furnace. Another method for smelting the copper includes a process for supplying the copper concentrate wherein the weight ratio of sulfur/copper is 0.85-1.15 and the oxygen-enriched air into the furnace, and a process for supplying the pig iron into the slag generated in the furnace. Further, the alternative method includes a process for supplying the oxygen-enriched air and the copper-concentrate, a process for supplying the pig iron into the slag generated in the furnace and a process for adjusting the copper grade in a mat generated in the furnace to 64-69 wt.%.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 待解决的问题:为了提供一种在抑制生产成本的同时抑制Fe的生成的方法。 解决方案:熔融铜的方法包括将不含供应焦炭的富氧空气和铜精矿供给到炉中的方法,以及向炉中产生的炉渣供给生铁的方法。 另一种熔融铜的方法包括供应铜精矿的方法,其中硫/铜的重量比为0.85-1.15,富氧空气进入炉中,以及将生铁供应到炉渣中产生的炉渣的方法 炉。 此外,替代方法包括供应富氧空气和铜精矿的方法,将生铁供应到炉中产生的炉渣中的方法以及调节炉中产生的铜的等级的方法 至64-69重量%。 版权所有(C)2010,JPO&INPIT