会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Climbing method of top sheave unit and top sheave unit used for the same method in elevator for construction
    • 用于施工电梯的同一方法的顶部单元和顶部切割单元的爬行方法
    • JP2006213489A
    • 2006-08-17
    • JP2005029800
    • 2005-02-04
    • Ohbayashi CorpSansei Kenki Kk三成研機株式会社株式会社大林組
    • NODA ISAOYAGI MASAKITAKAMURA TAKESHIOKAZAKI TOMONOBUONO HIDEOTAKEKIYO TAKAHIROYAMASHITA ISAO
    • B66B9/187B66B7/00
    • PROBLEM TO BE SOLVED: To move a top sheave unit upward without being interfered with an obstacle while the top sheave unit is mounted to a guide rail, save the attaching/detaching of the top sheave unit and the accompanied work, and smoothly perform the climbing operation. SOLUTION: A fixing means of the top sheave unit 20 mounted to the top part of the existing guide rail 11 is removed, the guide rail 11 of the next step is added to the climbing height and the top sheave 21 is moved to a retreated position where the top sheave 21 is not interfered with a related member such as a wall connecting bracket provided on the guide rail 11. The top sheave unit 20 is raised to the top part of the added guide rail 11, and the top sheave 21 is returned from the retreated position to the original position, and the top sheave unit 20 is mounted to the top part of the added guide rail 11 with the fixing means. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了在顶部滑轮单元安装到导轨上的同时向上移动顶部滑轮单元,而不会妨碍障碍物,从而节省了顶部滑轮单元和伴随的作业的安装/拆卸,并且顺利地 执行攀爬作业。 解决方案:卸下安装在现有导轨11顶部的顶部滑轮单元20的固定装置,将下一步骤的导轨11添加到爬升高度,并将顶部滑轮21移动到 退出位置,其中顶部滑轮21不会与设置在导轨11上的壁连接支架等相关构件相干扰。顶部滑轮单元20被升高到添加的导轨11的顶部,并且顶部滑轮 21从退避位置返回到原来位置,并且顶部滑轮单元20通过固定装置安装到添加的导轨11的顶部。 版权所有(C)2006,JPO&NCIPI
    • 2. 发明专利
    • Elevating path protecting device of elevator for construction
    • 电梯施工路面保护装置
    • JP2005206350A
    • 2005-08-04
    • JP2004016216
    • 2004-01-23
    • Ohbayashi CorpSansei Kenki Kk三成研機株式会社株式会社大林組
    • NODA ISAOYAGI MASAKIKANZAKI YOSHIHIROASANO TAMIOYASUMORI TADAOSATO EIZOYAMASHITA ISAOTAKEKIYO TAKAHIRO
    • B66B9/187B66B7/00
    • PROBLEM TO BE SOLVED: To provide an elevating path protecting device of an elevator for construction shrinkable according to an interval between a floor and a ceiling under construction after the elevator is installed. SOLUTION: This elevating path protecting device surrounds an elevating path of an elevator for construction installed through each of floors of a multi-story building for securing safety. The device has an opening 16 provided on a floor 14 as an elevating path, and a strut 21 is installed around the opening 16. An enclosure 22 surrounding the elevating path using the strut 21 is provided, and an opening/closing part 23 for riding on and off a conveyer 17 is installed to a part of the enclosure 22. Also, a shrinking part shrinkable according to variation of an interval between the floor 14 and the ceiling 15 under construction after installation of the elevator is installed to the strut 21. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种用于在电梯安装之后根据建筑物之间的间隔收缩的用于建筑物的电梯的升降路径保护装置。 解决方案:该升降路径保护装置围绕安装在多层建筑物的每个楼层的安装用电梯的升降路径,以确保安全。 设备具有设置在作为升降路径的地板14上的开口16,并且在开口16周围安装有支柱21.设置有使用支柱21围绕升降路径的外壳22,以及用于骑行的开闭部23 传送带17安装在外壳22的一部分上。而且,在电梯安装之后,根据地板14与正在施工的天花板15之间的间隔的变化可收缩的收缩部分被安装到支柱21上。 版权所有(C)2005,JPO&NCIPI