    • 4. 发明专利
    • Method for reinforcing existing foundation for structure
    • 用于加固现有结构基础的方法
    • JP2012031679A
    • 2012-02-16
    • JP2010173493
    • 2010-08-02
    • Ohbayashi CorpRailway Technical Research Institute公益財団法人鉄道総合技術研究所株式会社大林組
    • KANDA MASAYUKINISHIOKA HIDETOSHIYOKOYAMA TOMOAKIHIRAO JUNICHIYAMAMOTO TADAHISA
    • E02D27/30E02D5/04E02D27/12E02D27/28
    • PROBLEM TO BE SOLVED: To provide a method for reinforcing an existing foundation for a structure, capable of rationally, economically and firmly reinforcing the existing foundation for the structure equipped with an existing footing constructed on a pile.SOLUTION: In a method for reinforcing an existing foundation for a structure equipped with an existing footing 4 constructed on a pile 3, a steel sheet pile wall 5 constituted by coupling a plurality of U-shaped steel sheet piles to one another in a corrugated shape in a plan view is constructed on the periphery of the existing footing 4. A steel pipe pile 7 is driven into the ground in the inside valley section of the steel sheet pile wall 5 so that the steel sheet pile wall 5 and the steel pipe pile 7 can be integrated together by coupling means. Concrete is placed between the steel sheet pile wall 5 and the existing footing 4 to construct a newly-constructed footing 9. The steel sheet pile wall 5 and the steel pipe pile 7 are integrated with the existing footing 4 by integration means.
    • 要解决的问题:提供一种加强结构现有基础的方法,能够合理,经济,牢固地加强现有的建筑物基础,这种结构在桩上构造有现有的基础。 解决方案:在一种用于加固现有基础的方法中,该结构配备有在桩3上构造的现有基脚4,钢板桩壁5通过将多个U形钢板桩彼此连接而形成 在现有的基脚4的周围构成平面图形的波纹形状。钢管桩7被驱动到钢板桩壁5的内侧谷部的地面上,钢板桩壁5和 钢管桩7可以通过联接装置集成在一起。 混凝土被放置在钢板桩壁5和现有的基脚4之间,以构造新的基础9.钢板桩壁5和钢管桩7通过集成装置与现有的基座4一体化。 版权所有(C)2012,JPO&INPIT
    • 5. 发明专利
    • Foundation for structure and method for constructing the same
    • 结构基础及其构造方法
    • JP2012031678A
    • 2012-02-16
    • JP2010173492
    • 2010-08-02
    • Ohbayashi CorpRailway Technical Research Institute公益財団法人鉄道総合技術研究所株式会社大林組
    • KANDA MASAYUKINISHIOKA HIDETOSHIYOKOYAMA TOMOAKIHIRAO JUNICHIYAMAMOTO TADAHISA
    • E02D27/30E02D5/04E02D27/12E02D27/28E02D27/32
    • PROBLEM TO BE SOLVED: To provide a foundation for a structure, which comprises a footing for being constructed on a steel pipe pile and a steel sheet pile wall for being constructed in the ground in such a manner as to surround the footing and which can be rationally and economically constructed, and a method for constructing the foundation.SOLUTION: A foundation for a structure includes a steel pipe pile 3 for being driven into the ground 2, a reinforced concrete footing 4 for being constructed on the steel pipe pile 3, and a steel sheet pile wall 5 for being constructed in the ground 2 in such a manner as to surround the footing 4. The steel sheet pile wall 5 is constituted by coupling a plurality of U-shaped steel sheet piles 5a to one another in a corrugated shape in a plan view. The steel pipe pile 3 is driven into the ground 2 of the inside valley section of the steel sheet pile wall 5. A head of the steel pipe pile 3 and the steel sheet pile wall 5 are coupled to each other via coupling means composed of a reinforcement 9.
    • 要解决的问题:提供一种结构的基础,该结构包括用于构造在钢管桩上的基脚和用于围绕基脚的方式构造在地面中的钢板桩壁,以及 可以合理,经济地构建,构建基础的方法。 解决方案:结构基础包括用于被驱动到地面2中的钢管桩3,用于在钢管桩3上构造的钢筋混凝土基脚4和用于构造在钢管桩3中的钢板桩壁5 地面2以包围基脚4的方式形成。钢板桩壁5通过平面图将多个U形钢板桩5a彼此结合成波纹状而构成。 钢管桩3被驱动到钢板桩壁5的内部谷部的地面2中。钢管桩3的头部和钢板桩壁5通过由 加强9.版权所有(C)2012,JPO&INPIT
    • 8. 发明专利
    • Open channel type displacement gauge
    • 打开通道类型位移计
    • JP2014178122A
    • 2014-09-25
    • JP2013050368
    • 2013-03-13
    • Ohbayashi Corp株式会社大林組Sogo Keisoku Kk綜合計測株式会社
    • TONO MITSUOYAMAMOTO TADAHISAFUKUDA TOMOYUKIHACHISUGA YOSHIBUMI
    • G01C5/04
    • PROBLEM TO BE SOLVED: To provide an open channel type displacement gauge enabling accurate vertical displacement measurement in a short time.SOLUTION: An open channel type displacement gauge 100 connects water tanks 11 arranged at a plurality of measurement points 10 to a water channel 20, detects vertical displacement generated at the measurement point 10 on the basis of relative variation between the water tank 11 and a water surface position before and after generation of the vertical displacement at the measurement point 10, and has free water surface. In the open channel type displacement gauge, at least one of the water tank 11 at least one measurement point 10 and the water channel 20 includes an auxiliary channel 30 other than the water channel 20 connecting between the water tanks 11.
    • 要解决的问题:提供一种能够在短时间内进行精确的垂直位移测量的开放通道型位移计。解决方案:开放通道型位移计100将布置在多个测量点10处的水箱11连接到水通道20, 基于在测量点10处的垂直位移产生之前和之后的水箱11和水面位置之间的相对变化,检测在测量点10产生的垂直位移,并具有自由水面。 在开放通道型位移计中,至少一个水箱11至少一个测量点10和水通道20包括除了连接在水箱11之间的水道20之外的辅助通道30。