热词
    • 1. 发明专利
    • TUNNEL EXCAVATOR
    • JPH09195684A
    • 1997-07-29
    • JP680996
    • 1996-01-18
    • OKUMURA CORPKOMATSU MFG CO LTD
    • NAKAYAMA TAKAYOSHICHIHARA HIDEKIOKADA AKIRATANAKA MASAHIKOIWAMOTO HIROAKITERADA SHINICHIYAMAZAKI TOSHIHIRO
    • E21D9/02E21D9/10
    • PROBLEM TO BE SOLVED: To protect workers found between a tunnel excavator and a succeeding truck or inside the succeeding truck from a falling substance by providing a falling substance blocking plate attached with a door between the excavator and the truck. SOLUTION: Regarding a tunnel excavator 1, which has a succeeding truck connected to its rear and excavates an inclined shaft with a stooping-down roof, falling substance blocking plates 22, 23 of two steps are provided above respective traction beams 20 one in front and one in rear. The respective falling substance blocking plates 22, 23 are arranged so that they may be horizontal while the inclined shaft is excavated and may cover almost the whole horizontal plane in the space above the traction beam 20. The falling substance blocking plate 22, which is made in a shape of cutting one of its elliptical plate end in a straight line and having this end (front end) pivoted to the traction beam 20, has an opening in almost a rectangular shape formed on the center of its front end and the rear end, and the opening on the rear end is provided with a double-leafed hinged door so as to cover the opening. The workers normally work behind (below) the falling substance blocking plates 22, 23.
    • 3. 发明专利
    • Tunnel lining concrete placing method and end form device
    • 隧道衬砌混凝土浇筑方法和端面装置
    • JP2007138592A
    • 2007-06-07
    • JP2005334837
    • 2005-11-18
    • Okumura Corp株式会社奥村組
    • MIZUHARA KENZOCHIHARA HIDEKIOKADA AKIRA
    • E21D11/10
    • PROBLEM TO BE SOLVED: To provide a tunnel lining concrete placing method for placing lining concrete while compacting the supplied concrete sufficiently without requiring many workers and a lot of time and labor. SOLUTION: In this lining concrete placing method for forming the lining concrete 11 by the use of a form 10 for tunnel lining, an end form 16 having such a shape that agrees with the lining cross sectional shape of a tunnel is slidably arranged in the axial direction X on the outer peripheral face 10a of the form 10 for tunnel lining by letting it oppose the end face 15a of existing lining concrete 15, and a concrete supply port 18a and a plurality of vibration compacting devices 19 are arranged in the peripheral direction in a lining space 17 between the end form 16 and the end face 15a of existing lining concrete 15 from the end form 16. Concrete is supplied into the lining space 17 through the concrete supply port 18a and compacted by each vibration compacting device 19 to place the lining concrete 11 while moving the end form 16 forward in the axial direction X by sliding. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种用于放置衬里混凝土的隧道衬砌混凝土浇筑方法,同时在不需要很多工人和大量的时间和劳动的情况下,足够压实供应的混凝土。 解决方案:在通过使用用于隧道衬砌的形式10形成衬砌混凝土11的这种衬里混凝土浇筑方法中,具有与隧道的衬砌横截面形状一致的形状的端部16可滑动地布置 通过使其与现有的衬里混凝土15的端面15a相对的用于隧道衬里的形式10的外周面10a上的轴向方向X,以及混凝土供应口18a和多个振动压实装置19布置在 在端部形式16和现有的衬里混凝土15的端面15a之间的衬里空间17中的周向方向从端部16将混凝土通过混凝土供应口18a供应到衬里空间17中,并由每个振动压实装置19压实 通过滑动在轴向方向X上向前移动端部形状16而放置衬里混凝土11。 版权所有(C)2007,JPO&INPIT
    • 5. 发明专利
    • TUNNEL EXCAVATOR
    • JPH09125890A
    • 1997-05-13
    • JP28564795
    • 1995-11-02
    • OKUMURA CORPKAWASAKI HEAVY IND LTD
    • SHIBUKAWA YUJIROCHIHARA HIDEKIYAMANAKA KAZUNORIHIRAYAMA SHINJI
    • E21D11/40
    • PROBLEM TO BE SOLVED: To form an opening having a size enough to allow formation of a work passage in a machine extending from the opening to the central part of an excavator, a tunnel excavator with a small bore. SOLUTION: A guide member in a given angular circle the lower part of which is notched at a given angle is formed at a drum flange 1 and an erector device E is revolvably arranged within the angle range of the guide member 2. An opening part 5 forming an arrangement passage for a feed and discharge sludge pipe is formed in the notch position of the guide member 2 and a passage for a work is formed throughout a range of from the opening part to the central part of an excavator. Further, the erector device E is provided with an articulated arm A comprising an expandable first arm 7 having a base end rotatably coupled to an erector body 3, a second arm 8 having a base end rotatably to the tip of the first arm 7, and a grasping member 9 rotatably coupled to the tip of the second arm 8. This constitution facilitates conveyance and assembly of a segment for the whole periphery of a tunnel excavator by the articulated arm A.
    • 6. 发明专利
    • Cutter plate for tunnel boring machine
    • 隧道镗床切割板
    • JP2007169947A
    • 2007-07-05
    • JP2005366209
    • 2005-12-20
    • Okumura Corp株式会社奥村組
    • CHIHARA HIDEKITAKUBO ATSUSHIHATAYAMA EIICHISATO HIROMI
    • E21D9/087E21D9/06
    • PROBLEM TO BE SOLVED: To provide a cutter plate for a tunnel boring machine recovered after the construction of a tunnel, attaining smooth excavation while positively receiving jacking reaction during tunnel excavation and smoothly carrying out recovery after tunnel excavation. SOLUTION: The cutter plate 1 is formed by providing the outer peripheral surface of a center cutter plate part 2 detachably with the inner peripheral surface of an outer peripheral cutter plate part 3 of annular shape. The outer peripheral surface of the center cutter plate part 2 and the inner peripheral surface of the outer peripheral cutter plate part 3 joined to the outer peripheral surface are formed in tapered surfaces inclining in a diameter enlarging direction backward from the front, and the jacking reaction applied to the front face of the outer peripheral cutter plate part 3 is positively received by the center cutter plate part 2 through the tapered faces during excavation. When recovering a boring machine body 10, the outer peripheral surface of the center cutter plate part 2 is smoothly detached from the inner peripheral surface of the outer peripheral cutter plate part 3. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为隧道施工后回收的隧道掘进机提供切割板,在隧道掘进过程中积极接受顶升反应,顺利开挖,隧道开挖后顺利进行恢复。 解决方案:切割板1通过以与环状外周切割板部3的内周面可拆卸地设置中心切割板部2的外周面而形成。 中心切割板部2的外周面和与外周面接合的外周切割板部3的内周面形成为从前方向后方延伸的直径扩大方向的倾斜面,顶起反应 施加到外周切割板部3的前表面的中间切割板部2在挖掘期间通过锥形面被积极地接收。 当回收镗床主体10时,中心切割板部2的外周面从外周切割板部3的内周面平滑地脱离。(C)2007,JPO&INPIT
    • 7. 发明专利
    • Tunnel lining concrete placing method and end form device
    • 隧道衬砌混凝土浇筑方法和端面装置
    • JP2007138591A
    • 2007-06-07
    • JP2005334836
    • 2005-11-18
    • Okumura Corp株式会社奥村組
    • MIZUHARA KENZOCHIHARA HIDEKIOKADA AKIRA
    • E21D11/10
    • PROBLEM TO BE SOLVED: To provide a tunnel lining concrete placing method for placing concrete while compacting the concrete supplied into a tunnel crown by the use of a plurality of vibration compacting devices. SOLUTION: In this lining concrete placing method for forming lining concrete 11 by the use of a form 10 for tunnel lining, an end form 16 having such a shape that agrees with the lining cross section of the tunnel crown 13 is slidably arranged on the outer peripheral face 10a of the form 10 for tunnel lining by placing the lining concrete 11 in both sides 11b up to a part below the tunnel crown 13 and then letting it oppose the end face 15a of existing lining concrete 15, and a concrete supply port 18a and the vibration compacting devices 19 are arranged from the end form 16 into a crown space 17. While concrete is supplied into a crown space 17 and compacted by the vibration compacting devices 19, the end form 16 is moved by sliding to a side where it leaves the existing lining concrete 15 to place the lining concrete 11 in the crown 13. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种隧道衬砌混凝土浇筑方法,用于在通过使用多个振动压实装置压实供给到隧道顶部的混凝土的同时,对混凝土进行压实。 解决方案:在通过使用用于隧道衬砌的形式10来形成衬里混凝土11的该衬里混凝土浇筑方法中,具有与隧道拱顶13的衬里横截面一致的形状的端部16可滑动地布置 在隧道衬里的形式10的外周面10a上,通过将衬里混凝土11放置在两侧11b中直到隧道顶部13下方的一部分,然后将其与现有的衬里混凝土15的端面15a相对,并且混凝土 供给口18a和振动压实装置19从端部16布置成冠部空间17.当将混凝土供应到冠部空间17中并且被振动压实装置19压实时,端部形式16通过滑动而移动到 在那里它离开现有的衬里混凝土15将衬里混凝土11放置在冠13中。版权所有(C)2007,JPO&INPIT
    • 8. 发明专利
    • Chipping equipment for bottom of tunnel
    • 隧道底部的运输设备
    • JP2005036464A
    • 2005-02-10
    • JP2003199040
    • 2003-07-18
    • Okumura Corp株式会社奥村組
    • SHIMOMURA YUKIOCHIHARA HIDEKISUDA HIROYUKI
    • E21D11/10E04G23/08E21F17/00
    • PROBLEM TO BE SOLVED: To accurately and efficiently chip the whole bottom surface of an aging tunnel by a predetermined thickness through the use of simple equipment in the repair of a bottom of the aged tunnel.
      SOLUTION: Horizontal rails 2 and 2 are fixed to both side wall surfaces of the tunnel T; both side ends of a horizontal pedestal 1 are supported on the horizontal rails 2 and 2 in such a manner as to be made movable by a roller 1a; a base 3 is supported in a suspended state below the horizontal pedestal 1 via jacks 4a and 4a which are mounted on both sides of the horizontal pedestal 1; a guide rail 3a parallel to the width direction of the bottom surface of the tunnel is provided on the undersurface of the base 3; a chipping hammer 6 is mounted on the guide rail 3a in such a manner as to freely reciprocate in the width direction of the tunnel; and the bottom of the tunnel is chipped by a certain thickness in the width and length directions in a state wherein a bit of the chipping hammer 6 abuts on the bottom surface of the tunnel.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:通过使用简单的设备来修复老化隧道的底部,准确有效地将老化隧道的整个底面切割预定厚度。

      解决方案:水平导轨2和2固定在隧道T的两个侧壁表面; 水平支架1的两侧端部以能够通过辊1a移动的方式支撑在水平导轨2和2上; 基座3通过安装在水平台座1的两侧的插座4a和4a以水平台座1下方的悬挂状态支撑; 在基座3的下表面上设有平行于隧道底面的宽度方向的导轨3a; 切屑锤6以沿隧道的宽度方向自由往复运动的方式安装在导轨3a上; 并且在切屑锤6的一个位置与隧道的底面邻接的状态下,隧道的底部在宽度方向和长度方向上被切削成一定厚度。 版权所有(C)2005,JPO&NCIPI

    • 9. 发明专利
    • EXCAVATED STUFF DISCHARGE CHUTE, AND USING METHOD THEREOF
    • JPH10299391A
    • 1998-11-10
    • JP11090897
    • 1997-04-28
    • OKUMURA CORPKANAZAWA SEISAKUSHO KK
    • CHIHARA HIDEKIKANAZAWA MITSUO
    • E21D9/02E21D9/12
    • PROBLEM TO BE SOLVED: To reduce the wear by at least holding the earth on an inner surface of a chute to guide the excavated stuff to the downstream side. SOLUTION: A wire net 7 is arranged on an inner surface of a bottom wall part 6 of a chute 4. The wire net 7 is inserted into a plurality of support pieces 8 projected from the bottom wall 6 from an upper part in an attachable/ detachable manner, and slightly raised above the inner surface of the bottom wall part 6. The excavated stuff 9 such as earth and sand to be kept on the inner surface of the bottom wall part 6 is evenly kept making use of the mesh of the wire net 7. When the excavated stuff 10 produced during the excavation is charged into the chute 4, and carried out on the downstream side, the excavated stuff 10 slides down over the excavated stuff 9. A plurality of baffle plates are provided on the inner surface of the bottom wall part 6 in a crossing manner in place of the wire net, or a plurality of baffle plates are alternately projected from each side wall part 5 of the chute with the prescribed intervals in the discharging direction. The wear of the inner surface of the chute bottom wall part can be easily reduced thereby.