    • 3. 发明专利
    • Level bracing device
    • 水平保护装置
    • JP2006016101A
    • 2006-01-19
    • JP2004193079
    • 2004-06-30
    • Ohbayashi Corp株式会社大林組
    • ONO HIDEOIWAMI YOSHIAKI
    • B66C15/00B66C23/28
    • PROBLEM TO BE SOLVED: To provide a level bracing device capable of exerting a sufficient tremor isolating function by suppressing the change in the load applied to a tremor isolating device irrespective of the direction of the external force applied.
      SOLUTION: The level bracing device 1 is installed between a building 10 and the post 22 of a tower crane 20 used in constructing the building 10 for supporting the tower crane 20 in the horizontal direction, and is equipped with a frame 40 arranged in such a way as surrounding the post 22, a stay 60 to connect the frame 40 with the building 10, and a friction damper 50 interposed between the frame 40 and the post 22. The friction damper 50 connects the post 22 with each corner 40A of the frame 40 having approximately a square shape, wherein the angle θ of the damper sliding direction to one side member of the frame 40 is approximately 45°.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种能够通过抑制施加到震动隔离装置的负载的变化而能够施加足够的震动隔离功能的液位支撑装置,而与所施加的外力的方向无关。 解决方案:水平支撑装置1安装在建筑物10和用于构造用于在水平方向上支撑塔式起重机20的建筑物10的塔式起重机20的柱22之间,并且配备有框架40,该框架40布置 以围绕柱22的方式,将框架40与建筑物10连接的撑杆60以及插入在框架40和柱22之间的摩擦阻尼器50.摩擦阻尼器50将柱22与每个角部40A连接 框架40具有大致正方形形状,其中阻尼器滑动方向与框架40的一个侧构件的角度θ大约为45°。 版权所有(C)2006,JPO&NCIPI
    • 4. 发明专利
    • Sheath material mounting device and sheath material mounting method
    • SHEATH材料安装装置和护套材料安装方法
    • JP2006009407A
    • 2006-01-12
    • JP2004187833
    • 2004-06-25
    • Ohbayashi Corp株式会社大林組
    • TAGAMI HIROMASAYAGI MASAKITAMURA ETSUNORIKITANO TADASHIMATSUI MASAHIROONO HIDEO
    • E04G21/16E04G3/28
    • PROBLEM TO BE SOLVED: To shorten an occupied time for a crane when a sheath material is mounted on the outer surface of a building skeleton.
      SOLUTION: This mounting device comprises a pair of lifting beams 3 formed by integrating a pair of lifting pieces 4 connected to a sling W to the upper part thereof, connection columns 5 suspended from the tip lower part of the lifting beams 3 and connected to brackets 26 fitted to the outer surface side upper floor surface of the skeleton 25 beforehand, leg parts 6 positioned at the rear of the connection columns, suspended to the lower part of the lifting beams 3, and installed on upper floor surface support materials, a trolley 7 using the lifting beams 3 as guides and supported to be longitudinally moved along the guides, a chain block 8 suspended from the trolley 7 and liftably suspending the sheath material 23, and a gondola-like working frame 9 connected to the trolley 7 and horizontally moving together with the movement of the trolley 7.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:当护套材料安装在建筑骨架的外表面上时,缩短起重机的占用时间。 解决方案:该安装装置包括一对提升梁3,其通过将连接到吊索W的一对提升件4与其上部相结合而形成,连接柱5悬挂在提升梁3的末端下部和 预先安装在骨架25的外表面侧上部地板表面上的支架26,位于连接柱后部的悬挂在起重梁3的下部的脚部6,并安装在上部地板支撑材料 ,使用起重梁3作为导向并被支撑以沿着导向件纵向运动的手推车7,从手推车7悬挂并可升降地悬挂护套材料23的链条8和连接到手推车的缆车式工作框架9 7,并与手推车7的运动一起水平移动。版权所有(C)2006年,JPO&NCIPI
    • 7. 发明专利
    • PLATFORM FOR BUILDING CONSTRUCTION
    • JPH06158732A
    • 1994-06-07
    • JP31514192
    • 1992-11-25
    • OHBAYASHI CORP
    • ONO HIDEO
    • E04B1/35E04G3/00E04G3/16
    • PURPOSE:To promote work efficiency by supporting a platform in a liftable manner, mounting a lift equipped with a holding device holding a steel column to a main column and, at the same time, providing a welding device to the platform. CONSTITUTION:A new steel pipe column 4c added to a main column 4b is inserted in the upper part 12a of an upper holding device 12 in a non-holding state, and it is held with the upper part 12a. After that, the steel pipe column 4c is welded to a joint with the main column 4b by a column welding robot 14 mounted on a roof floor 7A. Then, in the case the main column 4b is further raised, a hydraulic cylinder is extended with a lower holding device as a supporting point, the upper holding device 12 is raised together with a platform 7 and, at the same time, the robot is raised. In addition, after a new steel pipe column is held and is installed on the steel pipe column 4c, they are welded by the robot 14.
    • 8. 发明专利
    • Elevator, and method for installing elevator
    • 电梯和安装电梯的方法
    • JP2012206856A
    • 2012-10-25
    • JP2011075984
    • 2011-03-30
    • Ohbayashi Corp株式会社大林組
    • MIURA YOSHIZOSHIINA SHOICHIONO HIDEOTAKIZAWA HEIICHIROYADA KAZUYA
    • B66B7/00
    • PROBLEM TO BE SOLVED: To save labor and time needed for installing an enclosure of an elevator at a building construction site.SOLUTION: The elevator 10 includes: a carrier 20; a rail 30 that guides the ascent and descent of the carrier 20; a frame 40 to which the rail 30 is connected and which is a framework configured so as to enclose a hoistway of the carrier 20; and a protective panel 50 attached to the frame which constitutes the enclosure of the hoistway. In a method for installing the elevator 10, the elevator 10 in a state that the carrier 20, the rail 30, the frame 40 and the protective member 50 are assembled beforehand is lifted above a high-rise building 1, and lowered through an opening 7 provided in the high-rise building 1 so as to be installed in the high-rise section of the high-rise building 1.
    • 要解决的问题:节省在建筑施工现场安装电梯外壳所需的人力和时间。 解决方案:电梯10包括:行星架20; 引导载体20的上升和下降的轨道30; 轨道30连接到的框架40,其是构造成围绕载体20的井道的框架; 以及附接到构成井道的外壳的框架的保护面板50。 在电梯10的安装方法中,预先组装有托架20,轨道30,框架40和保护构件50的状态下的升降机10被提升到高层建筑物1的上方,并且通过开口 7,在高层建筑1中设置,以安装在高层建筑1的高层段。版权所有(C)2013,JPO&INPIT
    • 9. 发明专利
    • Tower crane frame, tower crane supporting method, and tower crane frame mounting structure
    • 塔式起重机架,塔式起重机支撑方式和塔式起重机架安装结构
    • JP2010208859A
    • 2010-09-24
    • JP2010137193
    • 2010-06-16
    • Ohbayashi Corp株式会社大林組
    • ONO HIDEOEMURA MASARUFURUYA NORIYUKISOMEYA SATOSHINAKAJIMA YASUOKURITA KOHEI
    • B66C23/32E04G21/14
    • PROBLEM TO BE SOLVED: To provide a tower crane frame which can utilize beam materials constituting a building body without changing the sizes of or reinforcing them, and to provide a tower crane supporting method and a tower crane frame mounting structure.
      SOLUTION: The frame 22 includes a frame body 30 for supporting a mast 10, leg parts 40 protruded sideways from the frame body 30, hinges 50 for turnably connecting the leg parts 40 to the frame body 30, and mounted members 60 to be mounted on columns 101 of the building body 100 for supporting the leg parts 40, respectively. The mounted members 60 each include a supporting part 70 arranged on one side face of the column 101 for supporting the leg part 40, an auxiliary part 80 arranged on the other side face on the opposite side to one side face, and a fastening part 90 for fastening the supporting part 70 and the auxiliary part 80 to each other across the column 101.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种能够利用构成建筑物体的梁材料而不改变其尺寸或增强其的塔式起重机架,并提供塔式起重机支撑方法和塔式起重机机架安装结构。 框架22包括用于支撑桅杆10的框体30,从框架主体30侧向突出的脚部40,用于将腿部40可转动地连接到框体30的铰链50,以及安装构件60 分别安装在建筑物体100的支柱101上。 安装构件60各自包括布置在用于支撑腿部40的柱101的一个侧面上的支撑部70,配置在与一个侧面相反侧的另一侧面上的辅助部80和紧固部90 用于将支撑部分70和辅助部件80彼此跨越柱101紧固。版权所有:(C)2010,JPO&INPIT