会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • CONCRETE SHEET PILE STRUCTURE
    • JP2001032267A
    • 2001-02-06
    • JP20614499
    • 1999-07-21
    • NISHITETSU KENKI KKTOMEC CORP
    • SUZAKI SHINICHIROYASUDA HARUKI
    • E02D5/10
    • PROBLEM TO BE SOLVED: To protect a sheet pile main body lower end part and a nozzle so as to efficiently build a sheet pile by arranging a water guiding tube on one side face of the sheet pile main body, installing a drilling body shaped in an inverted triangle in lateral cross section in the lower end, and housing a high pressure water jetting nozzle inside. SOLUTION: A concrete sheet pile A is formed by disposing a water guiding tube 2 comprising a water guiding tube main body 10, a cutting body 11, and a nozzle connecting body 12 on one side face of a reinforced concrete steel sheet pile main body 1 extended in the vertical direction and formed into a wavy shape in the bottom view. In the lower end of the sheet pile main body 1, a drilling body 3 provided with a high pressure water jetting port and shaped into an inverted triangle in the cross section is fitted and installed by means of a bolt, while a nozzle 4 is housed in a nozzle supporting and protecting piece so as to be connected to the nozzle connecting body 12. While jetting high-pressure water from the high-pressure water jetting port for excavating the ground, the sheet pile main body 1 is built in the ground. Because the lower end part of the sheet pile main body 1 and the nozzle 4 are protected by the drilling body 3 so as not to be broken, excavation can be carried out efficiently. In addition, the structure is simplified and a production cost is lowered.
    • 7. 发明专利
    • CONCRETE SHEET PILE
    • JPH02120410A
    • 1990-05-08
    • JP27173888
    • 1988-10-26
    • NISHI NIPPON RAILROAD CO LTDFUJI PS CONCRETETOOMEN KENKI KK
    • KITAGAKI KUJIYUKIMIZUTA KENSAKUYASUDA HARUKI
    • E02D5/10E02D7/24
    • PURPOSE:To secure the safety of the ground by providing high pressure water supply lines and compressed air supply lines lengthwise to the insides of concrete sheet pile bodies and pouring respectively high pressure water and compressed air from openings of their upper ends to make it possible to spout them from openings of their lower ends. CONSTITUTION:A prestressed concrete (PC) sheet pile A is manufactured as stretcher shaped sheet pile bodies 1 having a U-shaped section and overall length of about 20m of the PC. High pressure water supply lines 2, 2 and compressed air supply lines 2', 2' are provided to the insides of right and left sides of the sheet pile bodies 1 respectively lengthwise extending from the upper ends to the lower ends, and the high pressure water and compressed air are poured from openings 3, 3' of the upper ends of each supply lines 2, 2' to make it possible to spout openings 4, 4' of the lower ends. Cutting pieces are pushed down along a side wall by the compressed air while cutting the ground of the lower ends of the sheet pile bodies 1 by high pressure water force, and they are pushed deeply into the ground. According to the constitution, they can be inserted with a low noise, high efficiency and high ability.