会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明授权
    • Proactive conformance for oil or gas wells
    • 石油或天然气井的主动一致性
    • US06283210B1
    • 2001-09-04
    • US09387476
    • 1999-09-01
    • Mohamed Yousef SolimanPrentice G. CreelSteve ResterMichael H. JohnsonLoyd E. East, Jr.Don M. Everett
    • Mohamed Yousef SolimanPrentice G. CreelSteve ResterMichael H. JohnsonLoyd E. East, Jr.Don M. Everett
    • E21B33138
    • E21B49/00E21B33/138E21B43/32
    • A proactive conformance method for a well includes selecting a well either in a completion phase or early in a production phase of the well and performing a conformance treatment on the well in the completion phase or early in the production phase. The conformance treatment preferably is performed before the well is completed (i.e., sometime during the completion phase between the well having been drilled and the well being placed in production), such as after running open hole logging or before setting casing. Another preferred aspect is the use of magnetic resonance imaging, such as using magnetic resonance imaging to analyze the well to determine where unwanted mobile fluid is in a reservoir intersected by the well. Such a well is completed in response to using the magnetic resonance imaging, including treating the well to confine at least part of the unwanted mobile fluid determined to be in the reservoir.
    • 井的主动一致性方法包括在完井阶段或在井的生产阶段早期选择井,并在完井阶段或生产阶段的早期对井进行一致性处理。 一次性处理优选在井完成之前(即,在钻井和井被投入生产之间的完井阶段期间的某个时间)进行,例如在开孔测井之后或在安装壳体之前。 另一个优选的方面是使用磁共振成像,例如使用磁共振成像来分析井,以确定在与井相交的储层中的不期望的移动流体的位置。 响应于使用磁共振成像而完成这样的井,包括处理井以限制确定为在储层中的不需要的流动流体的至少一部分。