会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Installing structure of fireproof partition wall
    • 安装FIREPROOF分隔墙的结构
    • JP2010047931A
    • 2010-03-04
    • JP2008211706
    • 2008-08-20
    • Kajima Corp鹿島建設株式会社
    • SAKANO KOICHISATO MASARUUEHARA HITOSHIOUCHI TOMIOKOGA TAKASHI
    • E04B1/94
    • PROBLEM TO BE SOLVED: To obtain an installing structure of a fireproof partition wall which does not require any work for plumbing penetration processing and which is excellent in workability even not in the case where a partition wall used for forming a fireproof section is installed directly below a beam, which makes possible a change of the installation position of the partition wall to a certain degree even after completion, and which can flexibly correspond to the demands of a resident. SOLUTION: In the installing structure of the fireproof partition wall which is installed on the steel-framed beam 2 on the floor above which is made of H-shape steel or the like, a horizontal surface-like member 4 is installed below the lower flange 2a of the beam 2 on the floor above, and the partition wall 1 rising from above the floor is connected to the horizontal surface-like member 4. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:为了获得不需要任何工作用于管道穿透处理的防火隔壁的安装结构,即使在用于形成防火部分的隔壁是 安装在梁的正下方,这使得即使在完成之后也可以将分隔壁的安装位置改变到一定程度,并且可以灵活地对应于居民的需求。

      解决方案:在安装在由H型钢等制成的地板上的钢框架梁2上的防火隔墙的安装结构中,水平表面状构件4安装在 上方地板上的梁2的下凸缘2a和从地板上方升起的分隔壁1连接到水平表面状构件4.版权所有(C)2010,JPO&INPIT

    • 2. 发明专利
    • Stone pitching method for interior wall
    • 用于室内墙的石材抛光方法
    • JP2009002037A
    • 2009-01-08
    • JP2007163615
    • 2007-06-21
    • Kajima Corp鹿島建設株式会社
    • OTSUKA SHIGEMITSUUEHARA HITOSHI
    • E04F13/14E04F13/21
    • PROBLEM TO BE SOLVED: To provide a stone pitching method for interior wall, capable of surely preventing falling of stone material in use of a thin stone material as interior wall material, and constructing, in stone finishing by stacking method, the upper stone material without waiting for emergence of adhesion strength of the lower stone material to improve the workability.
      SOLUTION: In the stone pitching method for vertically and horizontally pitching stone materials 1 as a thin inner wall, T-shaped sectional connection hardware 3 is disposed at a horizontal joint part between vertically located stone materials 1, the T-shaped connection hardware 3 having a vertical part 3a at the top and a horizontal part 3b at the bottom, and the lower part of the upper stone material 1 is supported by the horizontal part 3b while allowing the surface of the stone material 1 to abut on the vertical part 3a.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了提供一种用于内壁的石材俯仰方法,能够确保防止石材在使用薄壁石材时作为内壁材料的落下,并且通过堆叠方法在石材精加工中构造上部 石材无需等待下层石材的粘合强度的出现,提高加工性。

      解决方案:在用于垂直和水平投影石材1作为薄内壁的石材俯仰方法中,T形截面连接硬件3设置在垂直定位的石材1之间的水平接合部分处,T形连接 硬件3具有在顶部的垂直部分3a和底部的水平部分3b,并且上部石材材料1的下部由水平部分3b支撑,同时允许石材1的表面邻接在垂直方向上 第3a部分。 版权所有(C)2009,JPO&INPIT

    • 3. 发明专利
    • Demolition method and demolition auxiliary device
    • 拆分方法和拆卸辅助装置
    • JP2014001561A
    • 2014-01-09
    • JP2012137670
    • 2012-06-19
    • Kajima Corp鹿島建設株式会社
    • MIZUTANI AKIRAMIYAZAKI YASUNOBUNAHATA FUMIHIROISHII YASUSHIOGIWARA YUKIMASAUEHARA HITOSHIASAOKA SHIGERUYOSHIGAI SHIGERU
    • E04G23/08
    • PROBLEM TO BE SOLVED: To provide a demolition method which can be applied in demolition of many structures with a simple structure and which can reduce time and spatial limitations of demolition work.SOLUTION: Firstly, a demolition auxiliary device 10 in which a lift 12 and an outrigger 13 are attached to a body frame 11 is constructed in a structure 1. Implements and materials for demolition are arranged in the demolition auxiliary device 10 and the demolition auxiliary device 10 is lifted to the top part of the structure 1 while a slab 5 and others above the demolition auxiliary device 10 are demolished. Thereafter, the structure 1 is demolished from its upper part to its lower part in sequence while the demolition auxiliary device 10 is dropped. The lift 12 of the demolition auxiliary device 10 is used for carrying-in of new implements and materials, transfer of implements and materials, and carrying-out of demolished materials.
    • 要解决的问题:提供拆除方法,可以应用于拆除许多结构,结构简单,可以减少拆卸工作的时间和空间限制。解决方案:首先,拆除辅助装置10,其中升降机12和 将外框支架13安装在主体框架11上,构造为结构1.在拆除辅助装置10中设置有用于拆除的材料和拆除材料,并且拆除辅助装置10被提升到结构1的顶部,而平板5 被拆除辅助装置10以上的其他部件被拆除。 此后,当拆卸辅助装置10掉落时,结构1依次从其上部拆卸到其下部。 拆除辅助装置10的升降机12用于装载新的工具和材料,转移工具和材料,以及拆除被拆除的材料。
    • 5. 发明专利
    • 吊り天井の耐震補強構造
    • 悬吊式地震抗震加固结构
    • JP2014231680A
    • 2014-12-11
    • JP2013111911
    • 2013-05-28
    • 鹿島建設株式会社Kajima Corp
    • IWAKI HIDEOKUROKAWA YASUTSUGUUEHARA HITOSHITAGAMI ATSUSHIHIKITA MAKIKO
    • E04B9/18
    • 【課題】躯体から懸垂した吊り材の下端部に野縁受けが支持され、野縁受けに天井材を支持する野縁が接続された吊り天井において、野縁受けが天井材から水平力を受けることによる座屈と捩り変形を防止し、野縁と天井材との接合部等の損傷を防止する。【解決手段】野縁受け5の全長の内、吊り材2の下端部と少なくとも吊り材2の片側に配置され、躯体1と野縁受けと5の間に架設されるブレース8の下端部間の区間に、野縁受け5の軸方向に交差する方向に軸方向を向けて付加野縁9を配置し、野縁受け5に接続する。付加野縁9を野縁受け5の下面側に配置し、天井材7に接続する。【選択図】図1
    • 要解决的问题:为了防止天花板托梁和天花板材料之间的接合部件的损坏,通过防止弯曲和扭转变形,当天花板托梁接收器从天花板材料接收水平力时,在天花板托梁 用于支撑天花板材料的天花板托梁接收器通过由悬挂在骨架上的悬挂材料的下端部支撑天花板托梁接收器。解决方案:另外的天花板托梁9沿着轴向方向布置在 在天花板托梁接收器5的总长度的悬架材料2的下端部分与布置在至少一侧的支架8的下端部分之间的截面中与天花板托梁接收器5的轴向交叉 并且安装在骨架1和天花板托梁接收器5之间,并且连接到天花板托梁接收器5.额外的天花板j Oist 9布置在天花板托梁接收器5的下表面侧,并连接到天花板材料7。