会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Cofferdam construction method and cofferdam structure
    • COFFERDAM建筑方法和咖啡结构
    • JP2011231524A
    • 2011-11-17
    • JP2010102929
    • 2010-04-28
    • Kajima Corp鹿島建設株式会社
    • IWAMURA HIDEYOMURAI KENJITAKADA ETSUHISAKAGAMI YOSHIHIROIKETANI TAKESHIFUKUYAMA TAKAKOTAKEUCHI SATOSHITAGUCHI KATSUNORI
    • E02B7/00
    • PROBLEM TO BE SOLVED: To provide a cofferdam construction method etc. which allows an easy cofferdam construction for a water area.SOLUTION: A joint surface consisted of a side wall part 2 and a bottom part 4 opens a cofferdam structure 1 with an internal part at least partitioned into floating parts 100, 400, an inflowing part 200 and a pouring part 300. In a state where the side wall part 2 is made to float on water surface laterally, water is poured into the pouring part 300 and flows into the inflowing part 200 to set the bottom part 4 to down into the water, thus, putting the side wall part 2 to a state of longitudinally floating on the water. The side surface 3a of a dam body 3 of the cofferdam structure 1 is then positioned alongside the end face of joint surface formed from the bottom part 4 and side wall part 2. Thereafter, the space surrounded by the cofferdam structure 1 and the side face 3a of the dam body 3 is drained of water.
    • 要解决的问题:提供一种能够为水域容易围堰施工的围堰施工方法等。 解决方案:由侧壁部分2和底部部分4组成的接合表面打开隔离墙结构1,其中内部部分至少分成浮动部分100,400,流入部分200和倾倒部分300。 使侧壁部2横向在水面上浮动的状态,将水倒入倾倒部300中并流入流入部200,将底部4向下设置到水中,由此将侧壁 第2部分是纵向漂浮在水面上的状态。 然后,围堰结构体1的坝体3的侧面3a位于从底部4和侧壁部2形成的接合面的端面旁边。之后,由围堰结构1和侧面 坝体3的3a被排出水。 版权所有(C)2012,JPO&INPIT
    • 4. 发明专利
    • UNDERGROUND TANK
    • JPH07229322A
    • 1995-08-29
    • JP4648394
    • 1994-02-21
    • KAJIMA CORP
    • ISOIWA KAZUOKUBOTA MUNETAKAUEDA MASAAKIYASUNAGA MASAMICHITAGUCHI KATSUNORIOWAKI MASASHITOKUYAMA SEIJI
    • E04H7/18
    • PURPOSE:To restrain the occurrence of eccentric bending moment in the side wall of an underground tank by forming a part of the joining surface of the base plate and the side wall so as to be oblique to the horizon. CONSTITUTION:A cylindrical underground continuous wall 3 is provided inside the ground, and the ground inside the continuous wall 3 is excavated up to a prescribed depth, and then a baseplate 7 and a side wall 9 are provided, and the underpart of the baseplate 7 and the side wall 9 is worked so that the joining surface 13 of the baseplate 7 and the side wall 9 is oblique to the horizon. When the underground water level inside the continuous wall 3 is equalized to that of the outside ground at the time of high water-level operation or empty liquid, buoyancy is applied to the body and a force F1 is added to the side wall 9 from the baseplate 7, however, since the force F1 acts obliquely, the bending moment M1 of the side wall 9 is hardly caused. While, when the underground water level 17b is lowered by pumping the underground water inside the continuous wall 3 by means of pumping equipment, a force F2 is added to the side wall 9 from the baseplate 7 by the load of LNG 15 or the like, however, since the force F2 acts obliquely, the bending moment M2 of the side wall 9 is hardly caused.
    • 5. 发明专利
    • SINKING/UTILIZING/INSTALLATION METHOD FOR LARGE CAISSON
    • JPH0328421A
    • 1991-02-06
    • JP16240989
    • 1989-06-23
    • KAJIMA CORP
    • NAKAGAWA MIKIOIWAMURA HIDEYOKAWAMOTO KATSUMASATAGUCHI KATSUNORI
    • E02D23/08E02D23/02
    • PURPOSE:To shorten construction period by making a double-wall structure of the outer circumferential part of a caisson, and excavating and sinking this part by the conventional compression-air type caisson method, and then excavating the remaining central part by utilizing the double-wall part. CONSTITUTION:A part of the lower part of the caisson in the outer circumferential double-wall part is constructed and installed in the ground 5 at an installation place, and necessary machines are fitted to the body part 2 of the double- wall caisson, and the caisson is sunk to a prescribed depth while constructing the body in the upper part of the caisson, and then concrete is filled in the inside of the compression air chamber. Thereafter, while utilizing the double-wall part as a retaining wall and water stopping wall, the excavation of the central part 3 is carried out, and the bottom base 8 is constructed with concrete. If necessary, the ground is improved so as to reduce the quantity of water permeating into the inside of the caisson as low as possible. Thus, the amount of excavation can be decreased, and the cost necessary for the installation of the caisson can be reduced, and also the construction period can be shortened.