    • 4. 发明专利
    • MANUFACTURE OF NET REINFORCEMENT OF LATTICE-SHAPED WALL BODY AND DEVICE THEREFOR
    • JPH1190571A
    • 1999-04-06
    • JP25674297
    • 1997-09-22
    • KAJIMA CORP
    • MATSUI NOBUYUKIYOSHIDA YASUHISA
    • B21F27/08E04C5/04
    • PROBLEM TO BE SOLVED: To provide a method and device for manufacturing the net reinforcement of a lattice-shaped wall body capable of manufacturing reinforcement net by binding longitudinal reinforcements and traverse reinforcements in the horizontal arrangement thereof orthogonal to each other without requiring a heavy physical work such as lifting reinforcements. SOLUTION: A network reinforcement manufacturing device comprises a lower fixed net reinforcement receiving frame 2 and a lower traverse net reinforcement receiving frame 3 which are mounted on a base frame 1 in an approximately horizontal position, an upper fixed net reinforcement receiving frame 7 and an upper traverse net reinforcement receiving frame 8 which are mounted on the lower fixed net reinforcement receiving frame 2 and the lower traverse net reinforcement receiving frame 3 in an approximately horizontal position, a traverse means 6 to traverse the lower and upper traverse net reinforcement receiving frames to the side of the lower and upper fixed net reinforcement receiving frames side, and an erecting means 10 to set the lower and upper fixed net reinforcement receiving frames orthogonal to the lower and upper traverse net reinforcement receiving frames.
    • 7. 发明专利
    • Anchoring method of pile in rock with rock anchor
    • 具有岩锚的岩石桩的锚固方法
    • JPS6114321A
    • 1986-01-22
    • JP13084284
    • 1984-06-27
    • Kajima Corp
    • NAITOU SHIZUOIWATA MICHIKATSUTAKAHASHI YUUJISHIBATA MAMORUNISHIDA MITSUYUKITADA SHIGERUYOSHIDA YASUHISA
    • E02D5/80
    • E02D5/808
    • PURPOSE:To carry out an economical and speedy work, by a method wherein a steel pipe pile is provided to be driven into a specified position and a slot of small diameter for a rock anchor is bored through and the rock anchor steel unit is set to be inserted into the slot and stressed after grout material is provided there. CONSTITUTION:A steel pipe 11 which is provided with a pile end stiffener 12 is driven aslant into a specified position, and after the pile end is cleaned, a guide pipe 16 is used to bore a slot 19 of small diameter for a rock anchor through. Then, a rock anchor steel unit 20 is inserted into the slot 19 through the head of the pile 11 and is set at a specified position, and the slot is grouted with mortar 27 also just under the anchor unit 20. And after the mortar is cured, the rock anchor steel unit 20 is stressed at the head of the pile and prestress is introduced into the anchor unit. As the result, wherever the place, the work can be carried out, and the proof stress of the anchor can be checked when it is stressed.
    • 目的:为了进行经济和快速的工作,通过将钢管桩设置为被驱动到指定位置并且用于岩石锚杆的小直径的狭槽钻孔的方法,并且将岩石锚固钢单元设置为 插入槽中并在水泥浆材料之后施加应力。 构成:设置有桩端加强件12的钢管11被倾斜地驱动到指定位置,并且在桩端被清洁之后,使用导管16来将小直径的槽19用于岩石锚通过 。 然后,岩石锚固钢单元20通过桩11的头部插入槽19中,并且被设置在特定位置,并且槽也在刚好在锚固单元20下方的砂浆27上灌浆。在砂浆是 固化后,岩石锚固钢单元20在桩的头部受到应力,并且将预应力引入锚固单元中。 结果,无论在何处,可以进行工作,并且在施加压力时可以检查锚的证明应力。
    • 9. 发明专利
    • Pile driving work using platform and temporary pier
    • 使用平台和临时踩踏器进行皮带驱动工作
    • JPS58222211A
    • 1983-12-23
    • JP10390282
    • 1982-06-18
    • Kajima Corp
    • FUJIMORI SHIGETOKIKUCHI KENJIHIKITA MINORUYOSHIDA YASUHISASHIMAI MORIYUKI
    • E02D7/00E02D7/16
    • E02D7/16
    • PURPOSE:To permit the driving of large-size piles in a wide range even by small-sized temporary platform by a method in which a girder is mounted on the platform a temporary pier and the platform are combined, and loads on a casing pipe are supported by the temporary pier and the platform. CONSTITUTION:A temporary pier 17 is set on the seabed in close proximity to a small-sized platform 1 set on the seabed where pile is to be driven, a movable girder 7 is mount on the platform 1, and a turning stand 10 supporting a movable pile-driving tower 13 is provided to the upside of the girder 7. The girder 7 is projected on the side of the platform 1, the leg of a girder receiving jack 9 attached to the girder 7 is extended and fixed to the temporary pier 17, and the turning stand 10 is also extened. Then, loads on the casing pipe are supported by the platform 1 and the temproary pier 17, and the casing pipe is erected.
    • 目的:即使使用小型临时平台,也可以通过将平台安装在平台上的方法将临时墩和平台组合起来,允许大范围的桩体在大范围内进行驱动,并且在套管上的载荷 由临时码头和平台支持。 构成:临时墩17设置在靠近要被驱动桩的海床上的小型平台1上的海床上,可移动的大梁7安装在平台1上,并且转动支架10支撑 可移动的打桩塔13设置在梁7的上侧。梁7突出在平台1的侧面上,连接到梁7的梁接收吊杆9的腿部延伸固定到临时码头 如图17所示,转台10也被延长。 然后,套管上的负载由平台1和假期墩17支撑,并竖立套管。
    • 10. 发明专利
    • Slipping device for driving pile
    • 用于驱动桩的滑动装置
    • JPS58218517A
    • 1983-12-19
    • JP10078282
    • 1982-06-14
    • Kajima Corp
    • SHIMAI MORIYUKIYOSHIDA YASUHISAMATSUMOTO MASARUSHINOHARA NOZOMITOKIWA JIYUNICHI
    • E02D13/04
    • E02D13/04
    • PURPOSE:To perform the receiving, driving and guiding operations of a pile by only one device by a method in which a pile receiver is provided at the upper part of a slipping device fixed to a leader and also a slip beam is provided at the lower part of the device in a freely movable manner toward the direction of the pile axis. CONSTITUTION:An oil-pressure cylinder 9 for a pile receiver 7 is operated, a pile-receiving bracket 8 is extended, a pile P hung down by a crane is slowly lowered, the projected piece K1 of the pile P is contacted with the bracket 8, and the pile P is supported. Also, the pile P is supported by the wire of a winch provided to set, the bracket is housed, and then the projected piece K1 is cut off. Also, a pad 14 is attached to a slip beam at the lower part of the pile receiver 7, the cylinder 11 is operated to extend the pad 14, and the pile is slipped to the seabed under the guidance of the pad 14 and then driven to the rockbed by means of a driver set to the leader R. The pad 14 is removed, a clamping metal 13 is attached, a drill pipe is clamped, the rockbed inside the pile P is excavated, and the pile P is again driven.
    • 目的:仅通过一个装置来执行桩的接收,驱动和引导操作,其方法是在固定到引导件的滑动装置的上部设置桩接收器,并且在下部设置滑动梁 该装置的一部分以可自由移动的方式朝向绒头轴线的方向。 构成:运行用于堆垛机7的油压缸9,使桩接收支架8伸长,由起重机悬吊的桩P缓慢下降,桩P的突出片K1与支架接触 8,桩P被支撑。 此外,桩P由设置的绞盘的线支撑,托架被容纳,然后突出的片K1被切断。 此外,垫14在桩接收器7的下部附接到滑动梁,操作缸11以延伸垫14,并且在垫14的引导下将桩滑到海床上,然后驱动 通过设置在引导件R上的驱动器移动到岩石板上。移除焊盘14,安装夹紧金属13,夹紧钻杆,挖掘桩P内的岩石,再次驱动桩P.