    • 2. 发明申请
    • MINE MANAGEMENT SYSTEM
    • 矿管理系统
    • US20160232622A1
    • 2016-08-11
    • US15025318
    • 2014-09-30
    • KOMATSU LTD.THE UNIVERSITY OF TOKYO
    • Yuichi KodamaMasaaki UetakeKazunari KawaiShinichi TeradaRui Fukui
    • G06Q50/02G06Q10/06E21F13/00
    • G06Q50/02E21C41/16E21F13/00E21F13/025E21F13/063E21F17/18G06Q10/04G06Q10/063G06Q10/06313
    • A mine management system (1) is used to mine ore from a vein in a mine including mining areas provided at the downside of the vein, a first mine shaft provided at the downside of the vein, and second mine shafts connecting the mining areas to the first mine shaft and includes: a transporting machine which loads the ore mined in the mining area and transports the ore to a soil discharge area while traveling in the first mine shaft; a loading machine which stays in the second mine shaft while a space used for the transporting machine to travel therein is left inside the first mine shaft, excavates the ore in the mining area, conveys the mined ore from the mining area in the opposite direction, and loads the ore on the transporting machine; and a management device which determines the mining area toward which the transporting machine is directed so that the operability of the loading machine becomes maximal or the operability of the transporting machine becomes maximal.
    • 矿山管理系统(1)用于从包括矿脉位于矿脉下方的矿场的静脉矿脉中开采矿石,第一矿井位于静脉下侧,第二矿井连接矿区 第一矿井,包括:运送机器,在矿区开采矿石,并在第一矿井行驶时将矿石运送到排污区; 在用于运送机器的空间中留在第二矿井内的装载机器留在第一矿井内,在采矿区挖掘矿石,将采矿区域的开采矿石沿相反方向输送, 并将矿石装载在运送机上; 以及管理装置,其确定运送机械所引导的采矿区域,使得装载机的可操作性变得最大或运送机器的可操作性变得最大。
    • 5. 发明申请
    • MINE MANAGEMENT SYSTEM
    • 矿管理系统
    • US20160217535A1
    • 2016-07-28
    • US15025380
    • 2014-09-30
    • KOMATSU LTD.THE UNIVERSITY OF TOKYO
    • Yuichi KodamaMasaaki UetakeKazunari KawaiShinichi TeradaRui Fukui
    • G06Q50/02G06Q10/06E21F13/00
    • G06Q50/02E21C41/00E21F13/00G06Q10/06315Y02P90/86
    • A mine management system to mine ore in a mine including a mining area, a first mine shaft, and a second mine shaft connecting the mining area and the first mine shaft, the mine management system includes: a transporting machine loading the ore mined in the mining area and transporting the ore to a soil discharge area while traveling in the first mine shaft; a loading machine staying in the second mine shaft while a space for the transporting machine to travel therein is left inside the first mine shaft, excavating the ore in the mining area, conveying the mined ore from the mining area in an opposite direction, and loading the mined ore on the transporting machine; and a management device determining a mining area in which the loading machine is disposed based on a difference between a production plan and an actual production amount of the mine.
    • 矿山管理系统包括:矿山矿区,矿井第一矿井和连接矿区和第一矿井的第二矿井,矿井管理系统包括:运输机装载矿石 在第一矿井内行驶时将矿石运送到排污区; 停留在第二矿井中的装载机器,而运送机器行进的空间留在第一矿井内,在采矿区挖掘矿石,沿相反方向将采矿区域的矿石输送, 运输机上的开采矿石; 以及基于生产计划与矿山的实际生产量之间的差异来确定装载机器所在的采矿区域的管理装置。