会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明专利
    • SEGMENT
    • JPH06264692A
    • 1994-09-20
    • JP5226393
    • 1993-03-12
    • TODA CONSTRUCTIONKAWASAKI STEEL CO
    • SHISEKI AKIOTADA KOJITANIGUCHI TORUNAKAGAWA MASAHIROTACHIKAWA YUJIUKEKAWA MAKOTOFUKUWAKA MASAKAZUHIRAMOTO TAKASHIKOBAYASHI HIDEYUKIHASHIMOTO OSAMI
    • E21D9/04E21D9/06E21D11/04E21D11/14
    • PURPOSE:To provide a steel sheet pile between shield tunnels to facilitate work by providing a slide groove for sliding a steel sheet pile in an axial direction of a tunnel on a steel sheet pile mount member and inserting the steel sheet pile into the groove. CONSTITUTION:Segments 1, wherein a slide groove for sliding a steel sheet pile is formed on a steel sheet pile mount member, are applied continuously only onto the opposed surfaces of a tunnel in a long side direction thereof, while ordinary segments are applied onto the remainder of the surface of the tunnel. Next, after shield tunnels are constructed, a steel sheet pile is inserted into a slide groove 2c of a corner steel sheet pile mount member 2 from the side of a shaft. At that time, the steel sheet pile is slid, while a cover 3 is being broken by pushing forces of the steel sheet pipe, so that the pile is disposed between the shield tunnels, following which the ground is excavated from the side of one of the vertical shaft toward the other shaft and the soil of the ground is improved, if necessary, to seal water, thereby ensuring safety of construction. And the steel sheet piles are connected by means of steel plate hinges and both ends are inserted into the slide groove 2c of the member 2 to form a three- hinge construction. As a result, the shield tunnels are offset vertically and horizontally, so that they can be easily adjusted even during the construction.
    • 10. 发明专利
    • CONNECTION ENGINEERING OF TUNNEL AND SEGMENT FOR TUNNEL CONNECTION
    • JPH07259476A
    • 1995-10-09
    • JP7950694
    • 1994-03-25
    • TODA CONSTRUCTION
    • TADA KOJITANIGUCHI TORUNAKAGAWA MASAHIROTACHIKAWA YUJIUKEKAWA MAKOTO
    • E02D3/12E02D17/04E21D9/00E21D9/01E21D9/06E21D11/04E21D11/14
    • PURPOSE:To carry out digging of a natural ground between tunnels while performing an earth pressure countermeasure and a water stop countermeasure by restraining machinery weight and segment weight, easily adapting to a contruction environment in a big city such as acquisition of a site for vertical shafts, etc., minimizing earth covering, easily coping with setting of facilities such as expansion, contraction, branching, confluence, etc., of tunnel sections and setting of an emergency parking belt, etc., for each constant interval and without making a shielding machine excessively large against a tunnel of about hundreds meters. CONSTITUTION:Tunnels are connected to each other by digging a natural ground between the tunnels dug adjacent to each other with an interval. Land slide protection is carried out by covering the natural ground between the tunnels by way of press fitting land slide protection plates 14 in the natural ground from a segment main body 12 constituting at least one of the tunnels. A timbering material 32 is inserted into another segment main body 12 from one of the segment main bodies 12 on the inside of the land slide protection plate 14 and fixed. The tunnels are widened by digging the natural ground is surrounded by the land slide protection plates 14. The land slide protection plates 14 are supported by setting connection members 36 between the timbering material 32 and the land slide protection plates 14.