热词
    • 3. 发明专利
    • Equipment capacity determination method and equipment in pneumatic caisson method
    • 设备能力确定方法和设备在气动CAISSON方法
    • JP2012067456A
    • 2012-04-05
    • JP2010210870
    • 2010-09-21
    • Kajima Corp鹿島建設株式会社
    • NISHIYAMA TAKUROKIDA HIROMITSU
    • E02D23/04
    • PROBLEM TO BE SOLVED: To shorten a construction period by optimizing cycle time in a pneumatic caisson method.SOLUTION: In equipment 1 including a caisson shovel 3 installed on a ceiling surface of a drilling operation chamber α, a material shaft 4, a man shaft 5 and a tower crane 6 erected on a caisson 2, a skater crane 7 and a soil hopper 8 erected on the ground, and an earth bucket 9 suspended so as to be elevated and lowered and make a traverse motion by the skater crane 7, the capacity of the earth bucket 9 is turned to a size smaller than the rated load of the skater crane 7 and such a size that the loading cycle time T1 of drilling soil by the caisson shovel 3 and loading it to the earth bucket 9 is equal to or longer than the conveying cycle time T2 of conveying the earth bucket 9 by the skater crane 7 in order to discharge the soil loaded in the earth bucket 9.
    • 要解决的问题:通过优化气动沉箱方法中的循环时间来缩短施工周期。 解决方案:在包括安装在钻井操作室α的天花板表面上的沉箱铲3的设备1中,竖立在沉箱2上的材料轴4,人力轴5和塔式起重机6,溜冰者起重机7和 竖立在地面上的泥土料斗8和悬挂以便升降的泥土斗9,并通过溜冰者起重机7进行横动运动,土铲9的容量变为小于额定载荷的尺寸 的尺寸使得由沉箱铲3将钻井土壤的装载周期时间T1加载到土方铲斗9的尺寸等于或大于输送土方铲斗9的输送周期时间T2 溜冰者起重机7,以便排放装载在地球桶9中的土壤。版权所有(C)2012,JPO&INPIT
    • 4. 发明专利
    • Tide wall construction method
    • TIDE WALL施工方法
    • JP2013002049A
    • 2013-01-07
    • JP2011131259
    • 2011-06-13
    • Kajima Corp鹿島建設株式会社
    • IKETANI TAKESHINAGASHIMA SATOSHIAKIYAMA YOSHINOBUUEMATSU SHINICHIROKIDA HIROMITSUFUKUDA MASARUNISHIKAWA TAKESHISHOJI SHIGERU
    • E02B3/06
    • PROBLEM TO BE SOLVED: To provide a tide wall construction method, which enables a short-period construction even when a ground is uneven, and can prevent scouring.SOLUTION: Scouring-prevention bodies 1 are piled up on a ground 9 which faces the sea 13. The scouring-prevention body 1 is a component consisting of a holding body 3 packed with a fill material 5 with a mouth at the top being closed. The inside of the holding body 3 is filled with the fill material 5, which can be, for example, crashed stones, preferably with large specific gravity. Part of the piled scouring-prevention bodies is pasted with unwoven fabric 15. The unwoven fabric 15 is pasted at least on the entire surface area of the part facing the sea 13. The entire area of the surface side of the unwoven fabric is sprayed with an impervious material 21 by a spray device 19. The impervious material 21 preferably has a designated strength after hardening, while having elasticity at the same time.
    • 要解决的问题:提供一种潮汐壁施工方法,其即使在地面不均匀的情况下也能够实现短期施工,并且可以防止冲刷。 防水体1堆积在面向大海13的地面9上。防擦洗体1是由保持体3构成的部件,该保持体3填充有在顶部具有口部的填充材料5 被关闭 保持体3的内部填充有填充材料5,填充材料5可以是例如优选地具有大比重的碎石。 一部分堆积的防擦洗体用无纺布15粘贴。至少在面向海13的部分的整个表面区域上粘贴无纺织物15.无纺织物的表面侧的整个区域被喷涂 通过喷射装置19是不透水材料21.不透水材料21优选在硬化后具有指定强度,同时具有弹性。 版权所有(C)2013,JPO&INPIT
    • 5. 发明专利
    • Soil carry-away device and soil carry-away method
    • 土壤携带装置和土壤携带方法
    • JP2012067457A
    • 2012-04-05
    • JP2010210875
    • 2010-09-21
    • Kajima Corp鹿島建設株式会社
    • NISHIYAMA TAKUROKIDA HIROMITSUEMORI MICHIOINOMATA KATSUMIKATO MAKOTOTAGUCHI HIROSHI
    • E21D1/00E02D23/06
    • PROBLEM TO BE SOLVED: To provide a soil carry-away device and a soil carry-away method for efficiently carrying away soil with excellent maintainability.SOLUTION: The soil carry-away device includes: a carry-away bucket 4 which is suspended from a skater crane and elevated and lowered inside a material shaft 3; a hoist 5 mounted so as to move traversely on a traveling rail 9 disposed at the lower end part of the material shaft 3; and a temporary loading bucket 6 which is suspended from the hoist 5 and elevated and lowered at a position shifted in the horizontal direction from the elevating and lowering position of the carry-away bucket 4. Then, the hoist 5 elevates, lowers, traversely moves and brings down the temporary loading bucket 6 guided by a guide rail 13 to temporarily load the soil drilled in a drilling operation chamber A to the temporary loading bucket 6 and reload the soil from the temporary loading bucket 6 to the carry-away bucket 4.
    • 要解决的问题:提供土壤携带装置和土壤携带方法,以有效地带走具有良好可维护性的土壤。 土壤移除装置包括:从溜冰者起重机悬挂并在材料轴3内升降的携带式铲斗4; 安装成在设置在材料轴3的下端部的行进轨道9上横向移动的起重机5; 以及临时装载铲斗6,其从起重机5悬吊,并且在离开搬运铲斗4的升降位置的水平方向上移位的位置升降。然后,起重机5升降,横移移动 并将导轨13引导的临时装载铲斗6卸下,将临时装载铲斗6临时装载钻孔操作室A中的土壤,并将土壤从临时装载铲斗6重新装载到搬运铲斗4。 版权所有(C)2012,JPO&INPIT
    • 8. 发明专利
    • Shield tunnel joining method
    • SHIELD隧道加工方法
    • JP2005273212A
    • 2005-10-06
    • JP2004085329
    • 2004-03-23
    • Kajima CorpKomatsu Ltd株式会社小松製作所鹿島建設株式会社
    • SASAKI YUKINOBUKIDA HIROMITSUEMORI MICHIOSHINTAKU AKIJI
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a shield tunnel joining method superior in water cut-off performance, by putting the stability of the natural ground in a high state by a shield excavator having a simple constitution, when joining two shield tunnels.
      SOLUTION: A first tunnel is excavated up to a first tunnel excavating position by a first shield machine 1, and a second tunnel is excavated up to a second tunnel excavating position by a second shield machine 2. At this time, a shield machine arriving first of all is set as the first shield machine 1. Then, a first cutter device 11 of the first shield machine 1 is retreated up to the inside of a first outer cylinder part 10. Then, the second shield machine 2 is advanced, to excavate sediment between the first tunnel and the second tunnel. Afterwards, a second cutter device 21 is diametrally contracted, and the second shield machine 2 is further advanced. Then, after the first outer cylinder part 10 is opposed to a second outer cylinder 20, a second cutter device 21A and a movable inner cylinder 21E are advanced inside the first outer cylinder part 10.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供一种在截水性能优异的屏蔽隧道接合方法中,通过具有简单结构的盾构式挖掘机将天然地面的稳定性提高到高状态时,当连接两个盾构通道时。 解决方案:通过第一屏蔽机1将第一隧道挖掘到第一隧道挖掘位置,并且通过第二屏蔽机2将第二隧道挖掘到第二隧道挖掘位置。此时,屏蔽 首先到达的机器被设置为第一屏蔽机1.然后,第一屏蔽机1的第一切割装置11退回到第一外筒部10的内部。然后,第二屏蔽机2前进 挖掘第一隧道与第二隧道之间的沉积物。 之后,第二切割装置21径向收缩,第二屏蔽机2进一步前进。 然后,在第一外筒部10与第二外筒20相对后,第二切割装置21A和可动内筒21E在第一外筒部10的内部前进。版权所有(C)2006,JPO&NCIPI
    • 9. 发明专利
    • Rectangular cross section shield tunnel
    • 矩形横截面屏蔽隧道
    • JP2005023738A
    • 2005-01-27
    • JP2003270400
    • 2003-07-02
    • Kajima Corp鹿島建設株式会社
    • HAYAKAWA YASUYUKITAKIMOTO KUNIHIKOAKASAKA NAOTOKIDA HIROMITSU
    • E21D11/04E21D11/08
    • PROBLEM TO BE SOLVED: To provide a tunnel structure having excellent economy and capable of realizing the structure in which axial force in the peripheral direction is effective by reducing bending among cross sectional force while utilizing an advantage of a rectangular cross section shield tunnel to reduce average thickness of a member as the whole cross section.
      SOLUTION: An outer peripheral face side of the rectangular cross section shield tunnel 1 has an arc shape for reducing stress concentration in only a corner part 6, and the parts other than it are straight. An inner peripheral face side is constituted by combination of a plurality of arc-shaped curves having different radius of curvature except a join part 7 of an intermediate column or an intermediate wall 5 part. Thickness of a member in the corner part 6 is large, and thickness of a member in a central part of left and right side walls 4 and an intermediate part between a top board 2 and a bottom board 3 (a central part of the left and right side walls 4 and the intermediate column or the intermediate wall 5) is small.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供一种具有优良经济性的隧道结构,并且能够实现通过减小横截面力之间的弯曲而在周向方向上的轴向力有效的结构,同时利用矩形横截面屏蔽隧道的优点 以减小作为整个横截面的构件的平均厚度。 解决方案:矩形横截面屏蔽通道1的外周面侧具有用于仅减少角部6中的应力集中的弧形,并且除此之外的部分是直的。 内周面由除了中间柱或中间壁5部分的接合部分7之外具有不同曲率半径的多个弧形曲线的组合构成。 角部6中的部件的厚度大,左右侧壁4的中央部分的部件厚度和顶板2与底板3之间的中间部分(左侧的中央部分 右侧壁4和中间柱或中间壁5)很小。 版权所有(C)2005,JPO&NCIPI