会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • FIELD ASSEMBLY DEVICE FOR TANK BOTTOM PLATE REINFORCEMENT
    • JPH0949344A
    • 1997-02-18
    • JP20363295
    • 1995-08-09
    • KAJIMA CORP
    • MATSUI NOBUYUKIMAEKAWA YUKIMASAOGAWA TOMOYUKIYOKOYAMA MITSURUFUJIMURA TADASHIOWAKI MASASHI
    • E04H7/18
    • PROBLEM TO BE SOLVED: To perform necessary bar arrangement by turning girders extended between a center post and an outside traveling rail, and making laterally traveling carriages laterally travel. SOLUTION: An outside traveling rail 1 is laid on an annular step part B protrusively arranged on an inner wall of a cylindrical underground continuous wall W, and a center post 2 is erected in a central part of an underground continuous wall A. Two turning girders 3A and 3B are extended between this center post 2 and the outside traveling rail 1, and are respectively turned by an outside traveling device 4a and an inside traveling device 4b. Four laterally traveling carriages 5 are arranged on the under side of a turning girder 3, and the upper end of an extensible-contractible arm 6 is pivotally fixed here, and the lower end of the extensible-contractible arm 6 is pivotally fixed to a turning device 7, and a pair of reinforcement holding devices 10 are arranged on an under surface of this turning device 7. Radial reinforcements 52 are arranged from a cartridge C temporarily places on circumferential reinforcements S1 by the laterally traveling girder 3A, and the circumferential reinforcements S1 temporarily placed on a reinforcement stand F are arranged by the laterally traveling girder 3B.
    • 2. 发明专利
    • Closing of underground pipe
    • 关闭地下管
    • JPS59173413A
    • 1984-10-01
    • JP4555383
    • 1983-03-18
    • Kajima Corp
    • MAEKAWA YUKIMASAMORIMITSU YASUOSHIRAI KENICHI
    • E02D1/00E02D29/00
    • E02D1/00
    • PURPOSE:To completely and simply close observatory wells, etc., by packing hydro-concrete into the underground pipe of the observatory well. CONSTITUTION:A container 3 is set to the upper end of an underground pipe 1 through a valve 2, and a hydro-concrete 4 or a mixture of hydro-concrete 4 and waters 5 and 6 is packed into the container 3. The inside of the container 3 is practically isolated from the atmospheric air, the valve 2 is opened, and the hydro-concrete 4 is dropped into the pipe 1 and hardened. The underground pipe 1 can thus be completely closed with the concrete without forming any water channel, and thereby the inflow of groundwater into the pipe 1 can be prevented.
    • 目的:通过将水泥混合物包裹在天文台井的地下管道中,完全简单地关闭观测井等。 构成:将容器3通过阀2设置在地下管1的上端,并将水泥混凝土4或水泥混凝土4与水5和6的混合物装入容器3内。 容器3几乎与大气隔离,阀2打开,水凝胶4落入管1中并硬化。 因此,地下管1可以用混凝土完全封闭,而不形成任何水通道,从而可以防止地下水进入管1中。
    • 6. 发明专利
    • CLEANING OF JOINTS OF UNDERGROUND CONTINUOUS WALL
    • JPS6033926A
    • 1985-02-21
    • JP14352883
    • 1983-08-05
    • KAJIMA CORP
    • NAKANO MASAYUKIMAEKAWA YUKIMASAMORIMITSU YASUOSENDA TETSUOKOMURO ATSUSHI
    • E02D5/18
    • PURPOSE:To prevent the adherence of clay cakes to a partition plate by a method in which a temporary bonding plate is closely contacted with the following panel side of the partition plate for a reinforcing bar basket, and before placing concrete for the following panels, the temporary bonding plate is removed out. CONSTITUTION:A temporary bonding plate 6, e.g, thin steel sheet, etc., is beforehand closely attached to the face on the following panel side (b) of a partition plate 1 for a reinforcing bar basket. In constructing preceding panels, the reinforcing bar basket is inserted into an excavated hole, and concrete 9 is placed. In this case, bentonite mud water is usually put in the preceding excavated hole 10, and the cake of clay particles is adhered to the surface of the temporary bonding plate 6 mainly. After a trench for following panels is completed, a reinforcing bar basket for following panels is inserted into the trench, the temporary bonding plate 6 is removed from the plate 1 and pulled up to the ground's surface, and concrete is palced. The adherence of the cake of clay particles to the partition plate 1 can thus be prevented.
    • 7. 发明专利
    • Concrete placement work by stabilizer liquid method
    • 混凝土浇筑工艺采用稳定剂液体法
    • JPS59154216A
    • 1984-09-03
    • JP2719283
    • 1983-02-21
    • Kajima Corp
    • YAMAMOTO HIROYUKIMAEKAWA YUKIMASANAKANO MASAYUKIMATSUI NOBUYUKIFUJISAKI KUNIYAIMADATE FUMIO
    • E02D5/18
    • E02D5/18
    • PURPOSE:To improve the bonding between a steel part and concrete by a method in which current is flowed between an anode inserted into a stabilizer liquid and a custom-made steel part as a cathode immediately before the placement of concrete and clay particles adhered to the steel part are removed. CONSTITUTION:An iron bar cage 5 is set in an excavated trench 1, and then an electrode 7 is inserted into the cage 5 immediately before the placement of concrete. The electrode 7 is connected to the plus side of an external DC power source device 8 and a partition iron plate 3 and cross bars 4 are connected to the minus side of the power source device 8. Current of 5A/m or more is then flowed between both the electrodes so that clay particles adhered to the iron plate 3 and the cross bars 4 are separated due to the formation of the film of water as a diaphragm between iron bars 3 and the cross bars 4. Afterwards, concrete is placed and hardened.
    • 目的:通过在将混凝土和粘土颗粒粘附到其上之前将电极在插入稳定剂液体的阳极和作为阴极的定制钢部件之间的电流流动的方法来改善钢部件和混凝土之间的接合 钢部件被拆除。 构成:在挖掘的沟槽1中设置铁杆笼5,然后在放置混凝土之前将电极7插入到笼5中。 电极7与外部直流电源装置8的正面连接,分隔铁板3和横杆4与电源装置8的负侧连接。5A / m 2以上的电流 然后在两个电极之间流动,使得粘附到铁板3和横杆4上的粘土颗粒由于在铁棒3和横杆4之间形成隔膜而形成水分膜。之后,混凝土是 放置和硬化。