热词
    • 1. 发明专利
    • Humidity-adjustment method of raw material coal for coke
    • 用于焦化的原料煤的湿度调节方法
    • JP2007269877A
    • 2007-10-18
    • JP2006094585
    • 2006-03-30
    • Jfe Steel KkJfeスチール株式会社
    • OGAWA MITSUGITAKAHASHI HIROKAZU
    • C10B57/10
    • PROBLEM TO BE SOLVED: To provide a humidity-adjustment method accomplishing enhancement of an efficiency and enhancement of accuracy of humidity-adjustment and enhancing yield of a raw material coal for coke when the humidity-adjustment of the raw material coal for coke is performed.
      SOLUTION: Prior to charging of the raw material coal for the coke to a coal humidity-adjustment facility, the coal is distributed to the raw material coal for humidity-adjustment charged in the coal humidity-adjustment facility and a non-humidity-adjustment coal not charged in the coal humidity-adjustment facility using a distribution apparatus installed at an entrance side of the coal humidity-adjustment facility, the raw material coal for humidity-adjustment is humidity-adjusted at the coal humidity-adjustment facility to create the humidity-adjusted coal, and the humidity-adjusted coal and the non-humidity-adjusted coal are mixed.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:当焦炭原料的湿度调节时,提供一种实现提高效率并提高调湿精度的湿度调节方法,提高原料煤焦炭的产率 被执行。

      解决方案:在将焦炭原料煤装入煤调湿设备之前,将煤分配到原煤煤进行湿度调节,并在煤调湿设备中进行湿度调节,并将非湿度 - 在煤调湿设备的入口侧使用分配装置在煤调湿设施中未调节的调煤,在煤调湿设备处进行湿度调节的原料煤湿度调整, 调湿煤,调湿煤和无调湿煤混合。 版权所有(C)2008,JPO&INPIT

    • 2. 发明专利
    • Raw material delivering method for loader
    • 用于装载机的原材料递送方法
    • JP2005231819A
    • 2005-09-02
    • JP2004043740
    • 2004-02-20
    • Jfe Steel KkJfeスチール株式会社
    • OGAWA MITSUGISUGIMOTO MASAHARUOKAMOTO SHIGEHARUYAMASHITA TATSUOMISHIMA TAKAYUKI
    • B65G43/08B65G63/00B65G65/16
    • PROBLEM TO BE SOLVED: To provide a raw material delivering method for a loader for delivering a raw material from stack of the raw material by swivel operation of a boom by providing a rotating bucket wheel at a tip of the boom, capable of continuing automatic operation of the loader.
      SOLUTION: Since an inversion angle of the boom at an end of stack is stored in an inversion angle storage process, raw material delivering automatic operation of the loader at the step of object is continued. Since inversion angle at each step other than the step of object is calculated and stored using the inversion angle stored in the preceding inversion angle storage process in an each step inversion angle calculation process, automatic operation of the loader at step other than the step of object is continued.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种用于装载机的原料输送方法,该装载机通过在悬臂的尖端处设置旋转的铲斗轮,通过使悬臂的旋转操作来从原料的堆叠输送原料,能够 继续自动操作装载机。 解决方案:由于在反转角存储过程中存储了堆叠端部的起重臂的倒角,因此在物体的步骤中继续进行装载机的自动运行的原料。 由于在每个阶梯反转角计算处理中,使用存储在前一倒置角度存储处理中的反转角来计算并存储除了物体的步骤之外的每个步骤的倒角,因此在步骤之外的步骤中的装载机的自动操作 继续 版权所有(C)2005,JPO&NCIPI
    • 3. 发明专利
    • Method for removing deposition in sintering machine raw material charging device and method for producing sintered ore
    • 烧结机原料充电装置中移除沉积物的方法及其制备方法
    • JP2006206996A
    • 2006-08-10
    • JP2005023404
    • 2005-01-31
    • Jfe Steel KkJfeスチール株式会社
    • OGAWA MITSUGIKIMURA YOSHITAKA
    • C22B1/20
    • PROBLEM TO BE SOLVED: To provide a method for removing depositions in a sintering machine raw material charging device where sintering raw materials deposited on gate parts in a raw material charging device of a sintering machine can be removed using a simple apparatus at a low cost, and to provide a method for producing sintered ore using the method.
      SOLUTION: Regarding the sintering machine using a raw material charging device in which the quantity of the sintering raw materials to be charged is controlled by the opening and closing of gates 5, 6, the method for removing depositions in the raw material charging device of the sintering machine where the sintering raw materials deposited on the gates are removed by performing the opening and closing of the gates at a prescribed period is used. The gates are composed of the main gate 5 continued to the width direction of the sintering machine and a plurality of divided gates 6 installed at the lower part of the main gate and divided to the width direction of the sintering machine. The opening and closing of the gates are preferably controlled in such a manner that the divided gates lie in a closed state at the time when the main gate lies in an opened state, and the divided gates lie in an opened state at the time when the main gate lies in a closed state.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种在烧结机原料充电装置中去除沉积物的方法,其中可以使用简单的装置在烧结机的原料充电装置中沉积在栅极部分上的烧结原料, 并且提供使用该方法制造烧结矿的方法。 < P>解决方案:关于使用原料充电装置的烧结机,其中通过门5,6的打开和关闭来控制待充电的烧结原料的量,用于去除原料充电中的沉积物的方法 使用通过在规定时间内进行闸门打开和关闭来去除沉积在浇口上的烧结原料的烧结机的装置。 闸门由连续沿烧结机的宽度方向的主闸5和安装在主闸门下部并与烧结机的宽度方向分开的多个分隔门6组成。 门的打开和关闭优选地以这样的方式被控制,使得当主门处于打开状态时,分开的门处于关闭状态,并且当门分开门处于打开状态时 主闸门处于关闭状态。 版权所有(C)2006,JPO&NCIPI
    • 5. 发明专利
    • Method for controlling combustion of coke oven
    • 用于控制焦炉燃烧的方法
    • JP2008088289A
    • 2008-04-17
    • JP2006270558
    • 2006-10-02
    • Jfe Steel KkJfeスチール株式会社
    • ETO KAZUNOBUOGAWA MITSUGIKUNIYOSHI YASUHIDE
    • C10B21/10
    • PROBLEM TO BE SOLVED: To practice stabilized combustion control in adequate dry distillation consumption calorie by accurately carrying out control of gas calorie by using minimum number of gas calorie-measuring apparatuses.
      SOLUTION: In the coke oven-controlling method for controlling calorie of a mixed gas (M gas) of a blast furnace gas (B gas) used in ordinary combustion state with a coke oven gas (C gas) in a target value, calorie values of two gases including the M gas are measured and calorie value of residual one gas is obtained by calculation to carry out flow rate control.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:通过使用最少数量的气体卡路里测量装置,通过精确地进行气体卡路里的控制来实现足够的干馏消耗卡路里的稳定燃烧控制。 解决方案:在焦炉控制方法中,将用于普通燃烧状态的高炉煤气(B气)的混合气体(M气体)的热量与焦炉煤气(C气)的目标值进行控制 测量包含M气体的两种气体的卡路里值,并通过计算获得残留的一种气体的卡路里值,以进行流量控制。 版权所有(C)2008,JPO&INPIT
    • 7. 发明专利
    • Apparatus for making coke oven operational schedule
    • 制作烤炉操作计划的装置
    • JP2008297442A
    • 2008-12-11
    • JP2007145253
    • 2007-05-31
    • Jfe Steel KkJfeスチール株式会社
    • KUNIYOSHI YASUHIDEOGAWA MITSUGIOYAMA SATOSHIETO KAZUNOBUKATO HAJIME
    • C10B45/00C10B23/00C10B57/02
    • PROBLEM TO BE SOLVED: To easily rearrange an operational schedule without requiring manhours so as not to cause a drop in the coke oven operating efficiency in stopping an oven battery in order to inspect and repair a coke oven.
      SOLUTION: In a memory section 602, the data on the order of ovens in 5 groups of oven batteries A to D defined in a manner that the ovens arranged in the oven batteries A to D are divided into the 5 groups for 5 oven pitches in each of the oven batteries A to D, and furthermore the oven number sequentially given to the ovens in all oven batteries is successively arranged every 5 pitches in each of the 5 groups are stored. By a schedule-making processing section 604, an operational crew selection picture is displayed in a display section 608 and here, on operating selection of an operational crew, an oven order pattern setting picture for inputting to set the oven order data of the 5 groups defined in each of a plurality of oven batteries for each this operational crew in a group unit (unit such as A1) is displayed and here, the set contents are displayed in accordance with this input setting operation of the oven order data, and the set contents are finalized as the operational schedule in accordance with this finalizing operation of the set contents.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了容易地重新排列操作进度,而不需要工作时间,以便在停止烤箱电池时不引起焦炉操作效率的下降,以便检查和修理焦炉。 解决方案:在存储器部分602中,按照将排列在烘箱电池A至D中的烤箱分成5组的5组烘箱电池A至D中的烤箱数量的数据分为5组 每个烤箱电池A至D中的烤箱间距,并且在所有烘箱电池中依次给予烤箱的烤箱数量依次排列在每组5组中每隔5个间隔。 通过计划制作处理部分604,在显示部分608中显示操作人员选择画面,并且在操作人员的操作选择上,输入用于设置5组的烤箱命令数据的烤箱命令模式设置画面 显示在组单位(例如A1单元)中的每个这个操作人员的多个烤箱电池中的每一个中限定的,并且这里根据烤箱订单数据的该输入设置操作来显示设置内容,并且该组 内容根据设定内容的最终确定操作确定为操作进度。 版权所有(C)2009,JPO&INPIT
    • 8. 发明专利
    • Interlocking method for conveyance equipment
    • 输送设备的互锁方法
    • JP2013107728A
    • 2013-06-06
    • JP2011253162
    • 2011-11-18
    • Jfe Steel CorpJfeスチール株式会社
    • OGAWA MITSUGITANAKA MASACHIKA
    • B65G47/68B65G43/08
    • PROBLEM TO BE SOLVED: To enable appropriate on-road switching even when a failure occurs.SOLUTION: When failure occurs in at least one of a damper DA1, a damper DA2, a belt conveyor BC3 and a belt conveyor BC4, among a belt conveyor BC1 and a belt conveyor BC2, the belt conveyor located upstream from the part where the failure occurs is recognized, and then, the belt conveyor is suspended. Besides, when the failure occurs on the way of switching the conveyance path of one of the damper DA1 and the damper DA2, it is recognized that the conveyance path is connected to both of the belt conveyor BC3 and the belt conveyor BC4 during the switching of the conveyance path of the damper DA, then, the belt conveyor BC located upstream from the part where the failure occurs is suspended.
    • 要解决的问题:即使发生故障,也能够进行适当的道路交换。 解决方案:在带式输送机BC1和带式输送机BC2中的阻尼器DA1,阻尼器DA2,带式输送机BC3和带式输送机BC4中的至少一个中发生故障时,位于上部的带式输送机 识别出故障,然后,皮带输送机被悬挂。 此外,当在改变阻尼器DA1和阻尼器DA2之一的输送路径的过程中发生故障时,认识到在切换期间输送路径连接到带式输送机BC3和带式输送机BC4两者 阻尼器DA的输送路径,然后位于发生故障的部分上游的带式输送机BC被暂停。 版权所有(C)2013,JPO&INPIT
    • 9. 发明专利
    • Method for quenching red heat coke
    • 焚烧红热焦的方法
    • JP2011079928A
    • 2011-04-21
    • JP2009232403
    • 2009-10-06
    • Jfe Steel CorpJfeスチール株式会社
    • OGAWA MITSUGI
    • C10B39/08C10B41/00
    • PROBLEM TO BE SOLVED: To provide a method for quenching red heat coke, with which all red heat coke mounted on a coke quenching car is surely quenched, even when a range of mounting of the red heat coke on the quenching car is wider than a range of sprinkling of quenching water with a coke quenching tower.
      SOLUTION: When a position where a center part of the red heat coke 12 mounted on the coke quenching car 13 coincides with a center part of the range W2 of sprinkling of quenching water of the coke quenching tower 14 is denoted as the first stopped position P1 of the quenching car, a position at which an end part of the red heat coke 12 of the coke oven side coincides with an end part of the range W2 of sprinkling of quenching water of the coke oven side is denoted as the second stopped position P2 of the quenching car, and a position at which an end part opposite to the end part of the coke oven side of the red heat coke 12 coincides with an end part opposite to the end part of the coke oven side of the range W2 of sprinkling of quenching water is denoted as the third stopped position P3 of the quenching car, the quenching water is sprinkled on the coke quenching car 13 by sequentially stopping the coke quenching car 13 at the second stopped position P2 of the quenching car, at the first stopped position P1 of the quenching car, and at the third stopped position P3 of the quenching car.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了提供一种淬火红焦炭的方法,即使在淬火车上安装红色热焦炭的范围为 比用焦炭淬火塔喷洒淬火水的范围宽。 解决方案:当安装在焦炭淬火车13上的红色焦炭12的中心部分与焦炭淬火塔14的骤冷水喷射范围W2的中心部分重合的位置被表示为第一 熄焦车的停止位置P1,焦炉侧的红色焦炭12的端部与焦炉侧的骤冷水的范围W2的端部一致的位置被表示为第二 淬火车的停止位置P2,与红色焦炭12的焦炉侧端部相对的端部与与该范围的焦炉侧的端部相反的端部重合的位置 淬火水喷出的W2表示为淬火车的第三停止位置P3,通过在淬火车的第二停止位置P2处依次停止焦炭淬火车13,将骤冷水喷洒在焦炭熄火车13上 该 淬火车的第一停止位置P1和淬火车的第三停止位置P3。 版权所有(C)2011,JPO&INPIT
    • 10. 发明专利
    • Automatic removal method of furnace lid for coke oven and furnace lid removing apparatus
    • 炉烤炉和炉除油器的自动清除方法
    • JP2009179660A
    • 2009-08-13
    • JP2008017916
    • 2008-01-29
    • Jfe Steel CorpJfeスチール株式会社
    • OGAWA MITSUGI
    • C10B25/14
    • PROBLEM TO BE SOLVED: To cancel adhesion of coal tar intervening between an outer edge of a furnace lid and a peripheral edge of an aperture of a furnace hole to smoothly perform removal of the furnace lid when the furnace lid is removed after a carbonization step.
      SOLUTION: Contraction operation of a horizontal movement cylinder 14a is performed for 2 sec to impart extraction force in a separated direction from the furnace hole 2a to the furnace lid 8. After the extraction force imparted to the furnace lid 8 is suspended for 1 sec, extension operation of the horizontal movement cylinder 14a is performed for 1 sec to impart pressing force in a direction toward the furnace hole 2a to the furnace lid 8. Second contraction operation of the horizontal movement cylinder 14a is then performed for 2 sec to impart extraction force in a direction separated from the furnace hole 2a to the furnace lid 8. After the extraction force imparted to the furnace lid 8 is suspended for 1 sec, removal control of the furnace lid 8 is performed.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了消除在炉盖的外边缘与炉孔的孔周边之间介入的煤焦油的粘附,以便在炉盖被去除之后平滑地执行炉盖的移除 碳化步骤 解决方案:水平移动缸14a的收缩操作进行2秒,以将分离方向的提取力从炉孔2a到炉盖8提供。在施加到炉盖8的抽吸力被暂停之后 1秒钟,水平移动缸14a的延伸操作进行1秒,以向朝向炉盖8的炉孔2a的方向施加压力。然后,水平移动缸14a的二次收缩操作进行2秒至 在从炉孔2a分离到炉盖8的方向施加提取力。在施加到炉盖8的萃取力悬浮1秒之后,进行炉盖8的去除控制。 版权所有(C)2009,JPO&INPIT