会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Method for controlling furnace heat in blast furnace
    • 用于控制烤炉中的炉热的方法
    • JP2014118599A
    • 2014-06-30
    • JP2012274293
    • 2012-12-17
    • Jfe Steel CorpJfeスチール株式会社
    • TATARA REOWAKAI TSUKURU
    • C21B5/00C21B7/24
    • PROBLEM TO BE SOLVED: To provide a method for performing effective furnace heat control in a blast furnace by performing decision in which the long term transition and short term transition of furnace heat are combined while using relatively few sensor data.SOLUTION: Provided is a method for controlling furnace heat in a blast furnace in which a furnace heat level is decided from the temperature of a hot pig iron tapped from a blast furnace, based on sensor data obtained from a sensor fitted to the blast furnace or the time change amount of a furnace heat index obtained from the sensor data, a furnace heat transition level is decided, and next, an operation action in accordance with the furnace heat level and the furnace heat transition level is performed.
    • 要解决的问题:提供一种通过在使用相对较少的传感器数据的情况下组合炉热的长期转变和短期转换的决定来提高在高炉中进行有效炉热控制的方法。解决方案:提供了一种方法 用于根据从安装在高炉上的传感器获得的传感器数据或从安装在高炉的传感器获得的传感器数据,根据从高炉抽出的热生铁的温度来确定炉热量的高炉中的炉热控制 从传感器数据获得的炉热指数,确定炉热转换水平,接下来,进行与炉热量和炉热转换水平相应的操作动作。
    • 2. 发明专利
    • Method for blowing pulverized coal in blast furnace and device for detecting blowing abnormality of combustion-supporting gas
    • 用于吹制泡沫中的粉煤的方法和用于检测燃烧支持气体的吹扫异常的装置
    • JP2013237879A
    • 2013-11-28
    • JP2012110036
    • 2012-05-11
    • Jfe Steel CorpJfeスチール株式会社
    • FURUKAWA YASUMITSUWATANABE TAKASHITATARA REOKIYAMA TAKUYA
    • C21B5/00B65G53/66C21B7/00F27D21/00
    • PROBLEM TO BE SOLVED: To highly accurately determine blowing abnormality of combustion-supporting gas without using furnace pressure.SOLUTION: Pulverized coal together with combustion-supporting gas is blown into a blast furnace 1 from a tuyere 3 via a blast tube 2 using the blast tube 2 connected to the tuyere 3 of the blast furnace 1 and a double-tube lance 4. When a blast pressure to the blast tube 2 is denoted as Pb, a pressure to a combustion-supporting gas flow path 4B is denoted as Px, a flow velocity to the blast tube 2 is denoted as Vb, a flow velocity to the combustion-supporting gas flow path 4B is denoted as Vx, and a deviation between a pressure loss difference (ΔPb-ΔPx), which is a difference between a pressure loss ΔPb in the blast tube 2 obtained from the flow velocity Vb and a pressure loss ΔPx in the combustion-supporting gas flow path 4B obtained from the flow velocity Vx, and a pressure difference (Pb-Px), which is a difference between the blast pressure Pb and the combustion-supporting gas pressure Px, is greater than a predetermined allowable pressure ΔV, it is determined that blowing abnormality of the combustion-supporting gas occurs.
    • 要解决的问题:高精度地确定不使用炉内压力的助燃气体的吹出异常。解决方案:将粉煤与燃烧气体一起从风口3通过鼓风管2通过鼓风吹入鼓风炉1 连接到高炉1的风口3的管2和双管喷枪4.当对鼓风管2的鼓风压力表示为Pb时,对燃烧载气流路4B的压力表示为Px, 向鼓风管2的流速表示为Vb,向燃烧载气流路4B的流速表示为Vx,压力损失差(&Dgr; Pb-&Dgr; Px)之间的偏差为 从流速Vb获得的鼓风管2中的压力损失与Dgr; Pb之间的差异以及从流速Vx获得的燃烧载气流路4B中的压力损失&Dgr; Px和压差(Pb- Px),这是blast pres的区别 确定Pb和助燃气体压力Px大于预定容许压力Dgr; V时,判定为燃烧气体气体发生异常。
    • 3. 发明专利
    • Blast furnace operation method
    • BLAST FURNACE操作方法
    • JP2014084472A
    • 2014-05-12
    • JP2012231538
    • 2012-10-19
    • Jfe Steel CorpJfeスチール株式会社
    • WATANABE TAKASHIFURUKAWA YASUMITSUTATARA REO
    • C21B5/00
    • PROBLEM TO BE SOLVED: To provide a blast furnace operation method, in the case dust coals with different descriptions are blown from different lances, capable of efficiently increasing the burning rate of the whole of the dust coals to be blown.SOLUTION: The descriptions and blowing quantity of the dust coals blown from lances 4 are decided in advance, and the increasing slant of the dust coal burning rate to the increasing quantity of the blowing quantity of the oxygen to be blown is obtained in advance. In the case the increasing slant of the dust coal burning rate to the increasing quality of the oxygen to be blown has been known per description and blowing quantity of the dust coal, the burning rate of the whole of the dust coals in accordance with the oxygen blowing quantity from each lance 4 can be found from the weighted average burning rate of the dust coal blowing quantity. At this time, when the blowing quantity of the oxygen blown from each lance 4 is increased in the high order of the increasing slant of the burning rate of the dust coal blown from all the lances 4, the burning rate of the whole of the dust coals is most efficiently increased. For obtaining the maximum efficiency burning rate, the blowing quantity of the oxygen blown from each lance 4 is set in accordance with the description and blowing quantity of the dust coals blown from all the lances 4.
    • 要解决的问题:为了提供高炉操作方法,在具有不同描述的粉煤从不同的喷枪吹出的情况下,能够有效地提高整个被吹入的粉煤的燃烧速度。解决方案: 预先确定从喷枪4喷出的粉尘煤的吹出量,并预先获得粉煤燃烧速度的上升倾向与吹送氧量的增加量的增加。 在这种情况下,粉尘煤燃烧速率的上升倾向与待吹氧气质量的提高是已知的,并且粉尘煤的吹入量,根据氧气的整体粉煤的燃烧速率 可以从粉煤喷吹量的加权平均燃烧速率中找出每个喷枪4的吹送量。 此时,从喷枪4喷出的粉尘煤的燃烧速度的倾斜倾斜的高位,从每个喷枪4吹出的氧气的吹送量增加时,整个灰尘的燃烧速度 煤炭效率最高。 为了获得最大效率燃烧率,根据从所有喷枪4吹送的粉尘煤的描述和吹送量来设定从每个喷枪4吹出的氧气的吹送量。
    • 4. 发明专利
    • Method and management unit for operating coke oven
    • 操作烤炉的方法和管理单元
    • JP2013116937A
    • 2013-06-13
    • JP2011263783
    • 2011-12-01
    • Jfe Steel CorpJfeスチール株式会社
    • YOSHIOKA AKINORIOGAWA NAOTAKATATARA REOMIYAKE TATSUROISHII KUNIHIKO
    • C10B57/00C10B21/10C10B41/00C10B45/00
    • PROBLEM TO BE SOLVED: To provide a method and management unit for operating a coke oven, which can prevent extrusion clogging of coke from occurring.SOLUTION: A method for operating a coke oven that has a plurality of carbonization chambers and firing chambers alternately arranged in parallel includes: a first step of obtaining information on thickness of a carbonaceous material adhering to an oven wall in the range of equal to or lower than the height of coke in the carbonization chamber; and a second step of controlling an operation condition of the coke oven if the thickness of the carbonaceous material is a predetermined value or larger, so that the time variation in a temperature of the firing chamber adjacent to the carbonization chamber becomes equal to or lower than a predetermined value.
    • 要解决的问题:提供一种用于操作焦炉的方法和管理单元,其可以防止焦炭的挤出堵塞发生。 解决方案:一种用于操作焦炉的方法,其具有并排交替排列的多个碳化室和燃烧室,包括:第一步骤,获得附着在炉壁上的碳质材料的厚度相等的信息 达到或低于碳化室中焦炭的高度; 以及第二步骤,如果碳质材料的厚度为预定值或更大,则控制焦炉的操作状态,使得与碳化室相邻的燃烧室的温度的时间变化变得等于或低于 预定值。 版权所有(C)2013,JPO&INPIT