    • 2. 发明专利
    • Shield excavation method and device
    • 盾牌挖掘方法和装置
    • JP2006307643A
    • 2006-11-09
    • JP2006224601
    • 2006-08-21
    • Jfe Engineering KkJfeエンジニアリング株式会社
    • INO TOSHIMISHIODA ETSUROCHINJU TATSUMIUNOSAWA FUMIOKOBAYASHI AKIRA
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a method and a device for shield excavation, which does not adversely affect natural ground even in the case of excavating a shield tunnel with thin earth covering.
      SOLUTION: A shield excavator 1 has a cutter 3 for excavating natural ground at its front end. A plurality of sheets 15 are installed nearly all over the upper surface of a skin plate 13 constituting the external shell of the excavator body. A sheet storage 19 that stores sheets 15 feedably and a sheet feeder 21 that continuously feeds sheets 15 are provided within the excavator. Ports for drawing out the sheets 15 are provided in a zigzag manner to prevent the aligning of adjacent sheets on a skin plate 13.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种用于盾构开挖的方法和装置,即使在挖掘具有薄土地覆盖物的盾构隧道的情况下也不会对自然地面产生不利影响。 解决方案:盾构式挖掘机1具有用于在其前端挖掘自然地面的切割器3。 在构成挖掘机主体的外壳的皮肤板13的上表面的整个面上安装有多张纸15。 在挖掘机内设置有能够供纸的片材15和连续供纸片材15的片材进给器21。 用于拉出片材15的端口以锯齿形的方式设置,以防止相邻的片材在皮肤板13上的对准。(C)2007年,JPO和INPIT
    • 3. 发明专利
    • Segment assembling device
    • 分段组装设备
    • JP2007146654A
    • 2007-06-14
    • JP2007067231
    • 2007-03-15
    • Jfe Engineering KkJfeエンジニアリング株式会社Taisei Corp大成建設株式会社
    • INO TOSHIMISHIODA ETSUROCHINJU TATSUMIUNOSAWA FUMIOKOBAYASHI AKIRA
    • E21D11/40
    • PROBLEM TO BE SOLVED: To provide a segment assembling device capable of assembling long-sized segments with the long sides integrated.
      SOLUTION: A segment feeder 19 is installed at a frame 51, pressed to the inner peripheral wall of an existing segment 20 by a pressing jack 53 and advanced by a repositioning jack 54 after the segment is assembled. A first moving base 55 movable in a longitudinal direction is installed at a frame 51, and a second moving base 59 movable in a width direction is installed further ahead at the frame 51. A first link 63, a second link 65 at the tip thereof, and a third link 67 at the tip thereof are turnably mounted to the second moving base 59 respectively by pin connection. A fourth link 71 is journaled to the tip of the third link 67 by a shaft 72 turnably around the shaft, and a segment grip part 73 is mounted to the tip of the fourth link 71.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供能够组装长边集成的长段的段组装装置。

      解决方案:分段进给器19安装在框架51处,通过按压千斤顶53被压到现有分段20的内周壁上,并且在分段组装之后通过重新定位千斤顶54前进。 沿框架51可移动的第一移动底座55安装在框架51处,并且在宽度方向上可移动的第二移动基座59在框架51处进一步向前安装。第一连杆63,其顶端处的第二连杆65 并且其尖端处的第三连杆67分别通过销连接可转动地安装到第二移动基座59。 第四连杆71通过轴72可转动地围绕第三连杆67的尖端安装在轴上,并且段把手部分73安装在第四连杆71的顶端。(C)2007年, JPO&INPIT