会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Interposition pipe-jacking machine and split caisson-body interposition jacking method
    • 插管式封口机和分体式CAISSON-BODY INTERPOSITION JACKING METHOD
    • JP2005248512A
    • 2005-09-15
    • JP2004058932
    • 2004-03-03
    • Ishikawajima Constr Materials Co LtdIshikawajima Harima Heavy Ind Co LtdKidoh Construction Co LtdTaisei Corp大成建設株式会社機動建設工業株式会社石川島建材工業株式会社石川島播磨重工業株式会社
    • KANEKO KENICHIYUGUCHI MASAKIOHATA YUTAKAKOYANAGI YOSHIROHATTORI YOSHIFUMIKADOTA KATSUMISUGIMORI MAKOTOHASHIMOTO HIROHIDEWAKABAYASHI MASANORINAKANO MASAAKIARAKI DAISUKE
    • E21D9/06E21D13/02E21D13/04
    • PROBLEM TO BE SOLVED: To provide an interposition jacking apparatus capable of installing a split caisson-body with an excellent accuracy with securing cutoff properties when the split caisson bodies are juxtaposed by an interposition jacking method in construction of a tunnel of a large section, and a split caisson-body interposition jacking method.
      SOLUTION: An interposition pipe-jacking machine 1 is composed of an external cylinder 2, an internal cylinder 3, in which a part can be slid in the external cylinder 2, an interposition jack 4 in the external cylinder 2 and a reaction-receiving cylindrical body 5 being mounted in the internal cylinder 3 and transmitting a reaction by an jack 4 to the split caisson bodies 8 at rears. The interposition pipe-jacking machine 1 is further composed of a rectangular or square-shaped outercoat 6 mounted on the outer periphery of the external cylinder 2. In the interposition pipe-jacking machine 1, a sealant 7 is arranged in an opening between the external cylinder 2 and the internal cylinder 3, a groove 61 extended in the tunnel extending-direction is formed to the outer peripheral surface of the outercoat 6 and the external shapes of the external cylinder 2 and the internal cylinder 3 are molded in similar figures respectively in a rectangle, in which a circular or corner section is curvature-molded, or a square, in which the corner section is curvature-molded. The split caisson bodies 8 are installed by the interposition jacking method by such an interposition pipe-jacking machine 1.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种插入式起重装置,其能够以极高的精度来安装分体式沉箱体,并且当分体式沉箱主体在大型隧道施工中由插入式起重方式并列时,确保切断性能 剖面,以及一个拆分沉箱间插入方法。 解决方案:插入式顶管机1由外筒2,内筒3,外筒2内部可滑动的内筒2,外筒2内插入插入件4和反应 接收圆筒体5安装在内筒3中,并且通过千斤顶4将反作用力传送到分开的沉箱体8。 插入式管顶机1还由安装在外筒2的外周上的矩形或方形外涂层6构成。在插入管顶起机1中,密封剂7布置在外部 气缸2和内筒3,在外涂层6的外周面上形成有向隧道延伸方向延伸的槽61,外筒2和内筒3的外形分别以 其中圆形或角部分是曲率模制的矩形或方形,其中拐角部分被弯曲成型。 分体式沉箱体8通过插入式顶起装置1通过插入顶压方法安装。版权所有:(C)2005,JPO&NCIPI
    • 3. 发明专利
    • Divided caisson and method of constructing great-section tunnel
    • 分开的CAISSON和构造大型隧道的方法
    • JP2005240362A
    • 2005-09-08
    • JP2004049790
    • 2004-02-25
    • Ishikawajima Constr Materials Co LtdIshikawajima Harima Heavy Ind Co LtdTaisei Corp大成建設株式会社石川島建材工業株式会社石川島播磨重工業株式会社
    • KANEKO KENICHIYUGUCHI MASAKIOHATA YUTAKAKOYANAGI YOSHIROHATTORI YOSHIFUMIKADOTA KATSUMISUGIMORI MAKOTOOZAKI MASAYAHASHIMOTO HIROHIDEWAKABAYASHI MASANORI
    • E21D9/04E21D13/02
    • PROBLEM TO BE SOLVED: To provide a divided caisson for requiring a less number of divided caisson structural members to be removed when constructing a lining body consisting of the divided caissons, and to provide a method of constructing a great-section tunnel.
      SOLUTION: Four faces constituting the outer peripheral face of the divided caisson 1 in a hollow rectangular or square cross section intersect one another into a reticular pattern in the state that a plurality of plate beam members 2 have thin faces directed to the outer peripheral face. The used divided caisson 1 has four faces at least one of which is covered with a plate face member 3. The plurality of divided caissons 1 each having four faces all covered with the plate face members 3 are installed in the direction of a tunnel to construct a preceding divided caisson train. On the outer peripheral face of the preceding divided caisson train, a following divided caisson train consisting of the divided caissons 1 having no plate face members 3 are constructed in parallel to the preceding divided caisson train. The following divided caisson trains are sequentially provided in parallel to the previously constructed divided caisson train to construct a lining body 10 consisting of the divided caisson trains and then to construct the great-section tunnel 7.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种分割的沉箱,用于在构造由分开的沉箱构成的衬里体时需要较少数量的分解的沉箱结构构件,并且提供构造大截面隧道的方法。 解决方案:在中空的矩形或正方形横截面中构成分开的沉箱1的外周面的四个面在多个板梁构件2具有指向外部的薄面的状态下彼此相交成网状图案 外围脸。 所使用的分开的沉箱1具有四个面,其中至少一个被板面构件3覆盖。具有四个面都被板面构件3覆盖的多个分开的沉箱1安装在隧道的方向上以构成 前一条分开的沉箱火车。 在前述分配的沉箱列车的外周面上,由具有不具有板面构件3的分开的沉箱1组成的以下分开的沉箱列车与前述分配的沉箱列车平行地构成。 以下划分的沉箱列车与先前构造的分开的沉箱列车相平行地构成由构成分段的沉箱列车构成的衬里体10,然后构成大截面的隧道7.版权所有(C)2005, JPO&NCIPI
    • 4. 发明专利
    • Divided box body and construction method for underground three dimensional intersection
    • 用于地下三维尺寸分析的分体箱体和构造方法
    • JP2005200875A
    • 2005-07-28
    • JP2004006517
    • 2004-01-14
    • Ishikawajima Constr Materials Co LtdIshikawajima Harima Heavy Ind Co LtdTaisei Corp大成建設株式会社石川島建材工業株式会社石川島播磨重工業株式会社
    • KANEKO KENICHIOTA MITSUHIKOYUGUCHI MASAKIOHATA YUTAKAHATTORI YOSHIFUMIKADOTA KATSUMIITO HIROYUKIOZAKI MASAYAHASHIMOTO HIROHIDEWAKABAYASHI MASANORI
    • E21D9/06E02D29/05
    • PROBLEM TO BE SOLVED: To provide a construction method for an underground three dimensional intersection and divided box bodies capable of being efficiently constructed by making a temporary construction method vary every depth in the extension of the underground three dimensional intersection.
      SOLUTION: A supporting 20 is constituted of a shaft construction process, a lower step construction process placing the divided box bodies 2 of a lower step 21 side by side by using a closed type shield boring machine 12 of constructions of the supporting 20 consisting of a plurality of divided box bodies 2 in multiple steps and each step, and in the construction of an upper step 22, the box bodies of both ends are only installed in an extended section from the ground to a predetermined depth by an open shield machine 11, a range held between the box bodies carries out cut and cover tunneling work, the divided box bodies 2 are arranged in an extended section from the ground to the predetermined depth by the open shield machine 11, an upper step construction process arranging the divided box bodies 2 in an extended section up to the deepest section by the closed type shield machine 12, and the underground three dimensional intersection consisting of a tunnel 4 having a large cross section is constructed while taking advantage of the supporting 20.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供一种能够通过临时构造方法有效构造的地下三维交叉点和分割箱体的施工方法,在地下三维交叉口的延伸部中的每个深度都变化。

      解决方案:支撑件20由轴构造工艺,下阶段施工工艺构成,通过使用支撑件20的构造的封闭式屏蔽镗床12将下台阶21的分割箱体2并排放置 由多个分段的箱体2组成,多个台阶和每个台阶,并且在上台阶22的结构中,两端的箱体仅通过开口的屏蔽件从地面延伸到预定深度的延伸部分 机器11中,箱体之间保持的范围进行切割和覆盖隧道工作,分割箱体2通过开放式盾构机11从地面延伸到预定深度的延伸部分,上部阶段施工过程将 通过封闭型屏蔽机12延伸到最深部分的分割箱体2和由具有大十字形的隧道4组成的地下三维交点 (C)2005年,JPO和NCIPI(C)

    • 8. 发明专利
    • Tunnel construction method
    • 隧道施工方法
    • JP2005105695A
    • 2005-04-21
    • JP2003341138
    • 2003-09-30
    • Ishikawajima Constr Materials Co LtdIshikawajima Harima Heavy Ind Co LtdTaisei Corp大成建設株式会社石川島建材工業株式会社石川島播磨重工業株式会社
    • KANEKO KENICHIOTA MITSUHIKOYUGUCHI MASAKIOHATA YUTAKAUEDA KENROKADOTA KATSUMISUGIMORI MAKOTOOZAKI MASAYAHASHIMOTO HIROHIDEWAKABAYASHI MASANORI
    • E21D9/02E02D29/05E21D9/06E21D9/087E21D11/08
    • PROBLEM TO BE SOLVED: To provide a tunnel construction method for constructing an approach section ranging from a ground without the need for constructing a shaft.
      SOLUTION: The tunnel construction method comprises a start section construction step of constructing a start section where a shield machine 1 starts, an approach section initial construction step of using a heavy machine 3 for drilling the ground on the upper side of the ceiling of the shield machine 1 which digs obliquely downward from the start section and of installing a segment 4 with its sectionally rectangular upper part opened in a range up to a preset depth and installing a sectionally rectangular segment 4 in a range deeper than the preset depth, and an approach section following construction step of constructing the lower stage of the approach section 6 extending from the approach section 6 constructed in the approach section initial construction step, constructing the upper stage thereof in a range up to the preset depth while using the shield machine 1 with its ceiling being opened for advancing along the segment 4 provided on the lower stage, and constructing the upper stage thereof in a range deeper than the preset depth while using the shield machine 1 with its opening portion closed for advancing.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种用于构造从接地而不需要构造轴的接近部分的隧道施工方法。 解决方案:隧道施工方法包括:构建屏蔽机1启动的起始部分的起始部分施工步骤;使用重型机械3在天花板上侧钻地面的接近部分初始施工步骤 从开始部分向下倾斜的屏蔽机1和安装具有其截面矩形上部的段4在一定范围内打开到预设深度并且在比预设深度更深的范围内安装截面矩形的段4, 以及接近部分,其构造在从接近部分初始施工步骤中构成的接近部分6延伸的接近部分6的下段的构造步骤中,在使用屏蔽机构的同时将其上段构造到预设深度的范围 1,其天花板被打开以沿着设置在下层上的段4前进,并且构成上部 使用屏蔽机1,其开口部分被封闭以进行前进,在比预设深度更深的范围内。 版权所有(C)2005,JPO&NCIPI
    • 9. 发明专利
    • Work execution method for large section tunnel and deformed section shield boring machine
    • 大截面隧道和变形段刨花机的工作执行方法
    • JP2004316126A
    • 2004-11-11
    • JP2003108373
    • 2003-04-11
    • Ishikawajima Constr Materials Co LtdIshikawajima Harima Heavy Ind Co LtdTaisei Corp大成建設株式会社石川島建材工業株式会社石川島播磨重工業株式会社
    • KANEKO KENICHIOTA MITSUHIKOYUGUCHI MASAKIOHATA YUTAKAUEDA KENROKADOTA KATSUMIITO HIROYUKISAKUMA YUJIHASHIMOTO HIROHIDEWAKABAYASHI MASANORI
    • E21D9/06E02D29/05
    • PROBLEM TO BE SOLVED: To provide a construction method for a large section tunnel having a shallow overburden and a deformed section shield boring machine. SOLUTION: A rectangular excavation trench 3 in section view is formed in the ground to back-fill the upper part of a box body to construct a row of box bodies 23 while adjacently installing the box body 2, a row of propulsive pipes 73 are constructed by installing the propulsive pipe 7 under the box body 2 while fitting an projected stripe 71 expanded in the direction of a tunnel axis on the upper surface of an upper floor slab 72 of the propulsive pipe 7 in a groove stripe 22 notched in the direction of the tunnel axis on the lower surface of the bottom slab of the box body 2, excavation is carried out between a plurality of rows of box bodies 23 constructed in approximately parallel with each other at an interval 6 and a row of propulsive pipes 73, and while the large section tunnel 4 is constructed while utilizing a row of box bodies 23 and a row of propulsive pipes 73 as an earth retaining supporting member. A row of box bodies 23 are precedently constructed, and an upper stage box body 24 can be installed while forming the excavation trench 3 thereon. When the excavation trench 3 is formed, an open shield machine 11 or a deformed section shield machine 12 is used. COPYRIGHT: (C)2005,JPO&NCIPI
    • 解决的问题:提供一种具有浅覆盖层的大型隧道施工方法和变形断面保护镗孔机。 解决方案:在地面上形成一个剖面图矩形挖掘沟3,以填充箱体的上部,构成一排盒体23,同时相邻安装箱体2,一排推进管 73是通过将推进管7安装在盒体2的下面,同时将突出的条71在隧道轴线的方向上嵌合在推进管7的上层板72的上表面上,凹槽条带22被切口 在箱体2的底板的下表面上的隧道轴线的方向上,以间隔6彼此大致平行地构成的多排箱体23之间进行挖掘,并且一排推进管 并且在利用一排箱体23和一排推进管73作为接地保持支撑构件的同时构造大型隧道4。 先前构成一排盒体23,并且可以在其上形成挖掘沟槽3的同时安装上层箱体24。 当形成挖掘沟槽3时,使用开放式盾构机11或变形部分屏蔽机12。 版权所有(C)2005,JPO&NCIPI