    • 1. 发明专利
    • Apparatus and method for diagnosing stability of electric power system
    • 用于诊断电力系统稳定性的装置和方法
    • JP2009044857A
    • 2009-02-26
    • JP2007206863
    • 2007-08-08
    • Hitachi LtdTohoku Electric Power Co Inc東北電力株式会社株式会社日立製作所
    • SEKOGUCHI MASAHIROFUKUI CHIHIROMADORI IWAOMAKINO JUNICHIHANAMOTO KONOSUKEKATAYAMA TAKASHITAKAHASHI CHIYOUEISHIRASAKI TAKASHI
    • H02J3/00H02J3/24
    • PROBLEM TO BE SOLVED: To detect a dominant characteristic value corresponding to a system characteristic oscillation mode. SOLUTION: A power system stability diagnosis apparatus 12 extracts a dominant characteristic value from time-series observational data as follows: it computes a dominant mode power spectrum and a low-frequency noise range spectrum by a frequency component analyzing means 2; it computes the amount of a low-frequency noise component relative to a dominant mode component by a low-frequency noise amount determining means 3; it applies an autoregressive model and computes a characteristic value of each order by a characteristic value analyzing means 4; it screens them by a frequency screening means 5; and it changes and applies a dominant mode extraction technique according to the amount of the low-frequency noise component determined by the low-frequency noise amount determining means 3 and extracts the dominant characteristic value from among the multiple remaining characteristic values. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:检测与系统特性振荡模式对应的主要特性值。 解决方案:电力系统稳定性诊断装置12从时间序列观测数据中提取主要特征值如下:其通过频率分量分析装置2计算主模式功率谱和低频噪声范围谱; 它通过低频噪声量确定装置3计算相对于主模式分量的低频噪声分量的量; 它应用自回归模型,并通过特征值分析装置4计算每个顺序的特征值; 它通过频率筛选装置5屏蔽它们; 并且根据由低频噪声量确定装置3确定的低频噪声分量的量改变并应用主模式提取技术,并从多个剩余特征值中提取主要特性值。 版权所有(C)2009,JPO&INPIT
    • 3. 发明专利
    • Method for estimating power generation output of photovoltaic power generation facility
    • 估计光伏发电厂发电量的方法
    • JP2012043853A
    • 2012-03-01
    • JP2010181527
    • 2010-08-16
    • Tohoku Electric Power Co Inc東北電力株式会社
    • MATSUMOTO MITSUHIROHANAMOTO KONOSUKE
    • H01L31/042G06Q10/04G06Q50/06
    • Y02E10/50
    • PROBLEM TO BE SOLVED: To provide a method for estimating power generation output, which is capable of estimating power generation output of a photovoltaic power generation facility.SOLUTION: Typical solar radiation value data in fine weather at a meteorological observation point in the vicinity of an installation position of the photovoltaic power generation facility and actual sunshine duration per unit time observed at the meteorological observation point are acquired, and an estimated power generation output value of the photovoltaic power generation facility is calculated on the basis of an estimated solar radiation value at the installation position of the photovoltaic power generation facility, which is found from a value obtained by multiplying the typical solar radiation value data in fine weather by a ratio representing a rate of the actual sunshine duration per unit time.
    • 要解决的问题:提供一种能够估计光发电设备的发电输出的估计发电输出的方法。

      解决方案:获取光伏发电设施安装位置附近的气象观测点天气晴朗的典型太阳辐射值数据,以及在气象观测点观测到的实际每单位时间的日照时间,估计 基于在光伏发电设备的安装位置的估计的太阳辐射值,根据从晴天的典型太阳辐射值数据乘以的值求出的光电发电设备的发电输出值 通过表示每单位时间的实际日照持续时间的比率的比率。 版权所有(C)2012,JPO&INPIT