会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明申请
    • VEHICULAR POWER TRANSMISSION CONTROL APPARATUS
    • 车辆动力传动控制装置
    • US20100234172A1
    • 2010-09-16
    • US12720956
    • 2010-03-10
    • Takeshige MIYAZAKIHiroki Hatori
    • Takeshige MIYAZAKIHiroki Hatori
    • B60W10/10B60W20/00
    • B60W20/40B60K6/387B60K6/48B60K2006/541B60W10/02B60W10/06B60W10/08B60W20/00B60Y2400/428Y02T10/6221Y02T10/6286Y10T74/19014Y10T477/26
    • An apparatus comprises a changeover mechanism which is able to change a connection state to any one of three states, i.e., “an IN-Connection State” in which a power transmission path is provided between a transmission input shaft and the electric motor output shaft, “an OUT-Connection State” in which a power transmission path is provided between a transmission output shaft and the electric motor output shaft, and “a neutral connection state” in which no transmission path therebetween is provided. At a timing (time t1) at which a both-neutral-state is required during the vehicle is running, both “an operation for a changeover of the state-of-connecting of the clutch mechanism (C/T 30) from a connection-state to a shut-off-state” and “an operation for a changeover of said connection state of the changeover mechanism 50 from either one of the IN-Connection State and the OUT-Connection State to the non-connection state” are simultaneously started.
    • 一种装置包括能够将连接状态改变为三个状态中的任何一个的转换机构,即,在传动输入轴和电动机输出轴之间设置动力传递路径的“连接状态” 在变速器输出轴和电动机输出轴之间设置有动力传递路径的“OUT连接状态”和其间没有传动路径的“中立连接状态”。 在车辆行驶期间需要双中立状态的时刻(时刻t1),“将离合器机构(C / T 30)的连接状态的切换从连接 “状态到关闭状态”,并且“将切换机构50的所述连接状态从IN连接状态和OUT连接状态中的任一个切换到非连接状态的操作”同时 开始了