    • Method and apparatus for managing progress of lighting work
    • 管理照明工程进展的方法与装置
    • JP2003323471A
    • 2003-11-14
    • JP2002132850
    • 2002-05-08
    • Hitachi Ltd株式会社日立製作所
    • NAKAMURA ATSUHIKOOZAWA AKIRAYOKOI MIKI
    • G06Q50/04G06Q50/00G06Q50/08G06F17/60
    • Y02P90/30
    • PROBLEM TO BE SOLVED: To provide a method and apparatus for managing the progress of lighting work enabling the lighting work to be efficiently carried out by properly managing information about the lighting work and the time of delivery of luminaires related to the work. SOLUTION: A progress management server 3 is provided having a construction work progress management database 1 storing lighting work progress information and data on the luminaires used for the lighting work. The method for managing the progress of the lighting work uses the management server 3 to manage the progress of the lighting work. The management server 3 includes a progress database for storing the lighting work progress information indicative of the progress of the lighting work which is inputted by the orderer of the lighting work. and a luminaire database for storing the luminaire data inputted by the manufacturer of the luminaires used for the lighting work. Based on the lighting work progress information, the luminaires to be delivered are selected from the luminaires database. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供一种用于管理照明工作进展的方法和装置,使得能够通过适当地管理关于照明工作的信息和与工作相关的灯具的传送时间来有效地执行照明工作。 解决方案:提供了一种进度管理服务器3,具有存储照明工作进度信息的建筑工作进度管理数据库1和用于照明工作的灯具的数据。 用于管理照明工作进度的方法使用管理服务器3来管理照明工作的进度。 管理服务器3包括用于存储指示由照明工作人员输入的照明工作进度的照明工作进度信息的进度数据库。 以及用于存储由用于照明工作的灯具的制造商输入的灯具数据的照明器数据库。 根据照明工作进度信息,从灯具数据库中选择待传送的灯具。 版权所有(C)2004,JPO
    • 4. 发明专利
    • CABLE TRAY HAVING PIPING FUNCTION
    • JPH0681982A
    • 1994-03-22
    • JP23681392
    • 1992-09-04
    • HITACHI LTD
    • HAGINIWA TETSUYAOZAWA AKIRA
    • F16L9/19H02G3/00
    • PURPOSE:To prevent the occurrence of interference between a cable tray and a fluid piping and perform cooling of the cable by means of fluid in a piping part by a method wherein the piping part comprising a closed space in a semicircle in cross section is integrally formed below the cable laying surface of the cable tray. CONSTITUTION:A cable tray 1 has a plurality of cables 3 laid therein and is designed to support and protect the cables. In this case, the cable tray 1 is formed in a recessed shape in cross section and a piping part 2 formed in a semicircular shape in cross section is integrally formed below the cable laying surface. Fluid 4 having an atmospheric pressure at a normal temperature at which an adverse influence is not exercised on the cable 3 is caused to flow through the piping part 2. Namely, drain discharged from various devices is utilized as the fluid 4. After the drain is caused to flow through a drain pipe 5 to the piping part 2, it is forced to flow through a drain hole 6 to a vertical distributing water pipe 7 and flow through a drain spigot 8 to a drainage buried pipe 9. This constitution causes mainly prevention of interference between the cable tray 1 and the fluid piping.
    • 5. 发明专利
    • FLUSH-BOARD GATE
    • JPH02104809A
    • 1990-04-17
    • JP25473388
    • 1988-10-12
    • HITACHI LTD
    • OZAWA AKIRA
    • E02B7/22
    • PURPOSE:To enable the blocking and releasing of a water channel to be certainly performed with safety by setting a suspending beam for moving down into the recessed section of a gate main-body and suspending the gate main-body with a suspending hook to be hooked to the body from the lower section. CONSTITUTION:By using a guide groove 3, a suspending beam 11 is permitted to come in close contact with a gate main-body 4 set in a water channel 1, from the upper side. After that, the suspending hook 8 of the main body 4 is pushed downward by the L-shaped hook 12 of the beam 11 and starts rotating with the center of a hinge 14. After that, when the hook 12 is sufficiently moved down into the recessed section 9 of the main body 4, then the hook 12 is positionally shifted from the rotating area of the hook 8, and the hook 8 is returned to an original horizontal position. Besides, when the beam 11 is moved upward, when the hook 8 and the hook 12 are put together, and along with moving the beam 11 upward, the main body 4 is moved upward.
    • 7. 发明专利
    • ALL-ROUND OPENING VALVE APPARATUS
    • JPS61206883A
    • 1986-09-13
    • JP4660085
    • 1985-03-11
    • HITACHI LTD
    • OZAWA AKIRATATEISHI AKITAKA
    • F16K31/363F16K31/122
    • PURPOSE:To prevent the erroneous operation of an all-round opening valve by installing a check valve for suppressing the flow of fluid towards the upstream side of the opening valve from a cylinder, into a piping for pressurization for the communication between the cylinder of the all-round opening valve and the valve upstream part. CONSTITUTION:A maintenance valve 6 is installed onto the upstream side of an all-round opening valve 1. A pressurizing piping 11 is branched from the upstream part of the all-round opening valve 1 through an orifice 7 and a check valve 8 towards the cylinder 2 of the all-round opening valve 1. A piping 12 for reducing pressure which is equipped with a solenoid valve 5 is branched from the piping for pressurization which is set between the check valve 8 and the cylinder. Further, a bypass piping 13 for reducing pressure which is equipped with a manual operating valve 10 is installed into a bypass part, bypassing the solenoid valve. Further, a piping 14 for initial pressurization which is equipped with a pressurizing valve 9 is branched from the upstream part of the maintenance valve 6.
    • 9. 发明专利
    • GAS TURBINE EQUIPMENT
    • JPH08200093A
    • 1996-08-06
    • JP619095
    • 1995-01-19
    • HITACHI LTD
    • ICHINOSE KENICHIOZAWA AKIRA
    • F02C7/045
    • PURPOSE: To reduce special painting work in an intake air tunnel, and simultaneously perform painting work and installing work of an intake air duct by adding the intake air duct to the inside of the intake air tunnel in a plant having the intake air tunnel and an intake air silencer duct in a footing stand of a gas turbine. CONSTITUTION: An intake air duct 13 is added to an intake air silencer duct 12 arranged in an intake air tunnel of a footing stand 9 of a gas turbine 6, and they are integrally formed, and are arranged in the intake air tunnel. One end of the intake air duct is connected to an air taking-in chamber 14. Therefore, since the intake air duct is added to the intake air silencer duct and is connected to the air taking-in chamber, special painting work in the intake air tunnel is reduced, and painting work and installing work of the intake air duct can be simultaneously performed, and a field installing process can be shortened.