会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • AUTOMATIC CUT-OFF DEVICE FOR GAS PASSAGE
    • JPS61218877A
    • 1986-09-29
    • JP5896985
    • 1985-03-23
    • KUBO OSAMU
    • KUBO OSAMU
    • F16K17/36
    • PURPOSE:To precisely close a gas passage making use of vibration by freely bearing the shaft rod on whose upper part a weight is fitted and fixed on a spherical seat at the end of a bearing plate, and bringing the lower end of the rod into contact with the upper surface of a projection on a rotary plate. CONSTITUTION:The upper end of the valve rod 4 of a gas passage closing valve 3 is pivotally mounted on the one end of the laterally long rotary plate 2 whose middle part is pivotally mounted on a bearing plate 1. A spherical portion 8 on the lower part of the shaft rod 7 on whose upper part a weight 6 is fitted and fixed is freely beared on the spherical seat of a bearing projection 1' at the end of a bearing plate. The lower end of the rod 7 is brought into contact with the upper surface of the other end projection 2' on the rotary plate 2 and supported on it. When an automatic cut-off device is subjected to vibration, the rod 7 vibrates, and its lower end gets out of the projection 2'. Thus a spring 5 functions to cause a valve 3 to cut off a gas passage through a valve rod 4.
    • 6. 发明专利
    • Project evaluation system, program and storage medium
    • 项目评估系统,程序和存储介质
    • JP2005216020A
    • 2005-08-11
    • JP2004022400
    • 2004-01-30
    • Hitachi Ltd株式会社日立製作所
    • KUBO OSAMUKOBAYASHI YASUHIROITO JUNKO
    • G06Q10/06G06Q10/00G06Q50/00G06F17/60
    • PROBLEM TO BE SOLVED: To provide a project evaluation system calculating and evaluating value of a project group comprising a plurality of projects, especially evaluating the project group comprising a plurality of development projects comprising a plurality of development phases. SOLUTION: This project evaluation system is provided with a correlation setting function setting correlation that a development situation of an arbitrary project influences on development of an arbitrary project itself or the other project, to project group information that is attribute information of the project group, with the correlation divided into a condition part that is conditions for making the correlation effective and an influence part that is the influence imparted when the correlation is effective. In consideration of interaction between the projects set by the correlation setting function, the value of the project group is calculated and evaluated. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供项目评估系统,其计算和评估包括多个项目的项目组的价值,特别是评估包括多个开发阶段的多个开发项目的项目组。

      解决方案:本项目评估系统具有相关设置功能设置相关性,任意项目的开发情况对任意项目本身或其他项目的开发产生影响,作为项目属性信息的项目组信息 组,其中相关性分为条件部分,其是使相关性有效的条件和影响部分是当相关性有效时所施加的影响。 考虑到由相关设定函数设定的项目之间的相互作用,项目组的价值被计算和评估。 版权所有(C)2005,JPO&NCIPI