    • 1. 发明专利
    • Power supply method and system for coping at disaster
    • 用于灾难复原的电源方法和系统
    • JP2008245454A
    • 2008-10-09
    • JP2007084257
    • 2007-03-28
    • Hitachi Ltd株式会社日立製作所
    • ONO YASUNORICHINO KOICHIUCHIYAMA TOMOYUKITAKIZAWA TERUHIRONAKAMURA TOMOHARU
    • H02J3/46H02J3/38H02J9/06
    • PROBLEM TO BE SOLVED: To reduce costs for the installation and maintenance of equipment necessary for supplying power by making use of natural energy power sources and portable power supplies to stably supply power to the variable loads of emergency facilities, or the like, in disaster situations. SOLUTION: In normal situations, power is supplied, by associating a natural energy power source 12 installed in a disaster prevention base 2 with an electric power system 4. At a disaster, premise wiring 10 is isolated from the electric power system 4 and a common load 14 and connected to a load 15 for disasters and portable power regulation equipment 6, as shown in disaster prevention bases A to C. A supervision and control system 30 in the power regulation equipment 6 measures the outputs of a critical load 13, the load 15 for disasters and the natural energy power source 12 generates a control command to the storage battery 31 of the power regulation equipment 6 and an engine generator 32, of which the output can be controlled, in matching with the fluctuations in the outputs. This enables the loads and electric power generation to be balanced, thereby maintaining power qualities, such as voltage and frequency. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了降低使用自然能源电源和便携式电源来供电所需的设备的安装和维护成本,以稳定地向紧急设施等的可变负载供电, 在灾难中。 解决方案:在正常情况下,通过将安装在防灾基地2中的自然能源12与电力系统4相关联来提供电力。在灾难中,前提布线10与电力系统4隔离 和共同负载14,并连接到用于灾害的负载15和便携式功率调节设备6,如防灾基座A至C所示。功率调节设备6中的监视和控制系统30测量临界负载13的输出 ,用于灾害的负载15和自然能源12产生对功率调节设备6的蓄电池31的控制命令和可以控制输出的发动机发电机32,以匹配输出的波动 。 这样可以平衡负载和发电,从而保持诸如电压和频率的电源质量。 版权所有(C)2009,JPO&INPIT
    • 2. 发明专利
    • Linkage protection system for distributed power supply equipment
    • JP2004096871A
    • 2004-03-25
    • JP2002253336
    • 2002-08-30
    • Hitachi Ltd株式会社日立製作所
    • UCHIYAMA TOMOYUKIONO YASUNORIARITA HIROSHIHIGUCHI MIKISUKEKAWAMURA NAOTERU
    • H02J3/38
    • PROBLEM TO BE SOLVED: To provide a linkage protection system for distributed power supply equipment capable of performing smooth arithmetic processing. SOLUTION: A circuit breaker 12 for bus-bar communication is inserted into a bus bar 16 which connects between a power system 4 and distributed power supply equipment 5. A passing current I is detected by a current detector 13. A voltage on the power system side is detected by a voltage detector 14. The voltage on the distributed power supply equipment side is detected by a voltage detector 15. The detected current and each detected voltage are fetched into a control device 11. In the control device 11, a momentary voltage drop is detected by a combination of overcurrent or a current variation rate and a voltage drop, and a single run is detected according to a frequency variation rate of the voltage on the distributed power supply side. It is determined whether the direction of the power in the bus bar 16 is a direction from the distributed power supply equipment 5 side to the power system 4 side. The circuit breaker 12 is opened by outputting an interrupting instruction from the control device 11 to the circuit breaker 12 for the bus-bar connection, when the condition of a logic product between the positive determination result and the momentary voltage drop is satisfied or when the single run is detected. COPYRIGHT: (C)2004,JPO
    • 7. 发明专利
    • Supply and demand adjusting method, system and service by distributed power source
    • 供电和需求调整方法,分布式电源的系统和服务
    • JP2006204081A
    • 2006-08-03
    • JP2005277033
    • 2005-09-26
    • Hitachi Ltd株式会社日立製作所
    • ONO YASUNORIUCHIYAMA TOMOYUKIKONDO SHINICHITATEMI MASARUFUJITA YASUNOBU
    • H02J3/00
    • Y02P80/22
    • PROBLEM TO BE SOLVED: To provide a method and a system by which natural fluctuating electric power supply like wind power generation is interconnected to a commercial system, and economical operation is attained, without depending on the ability to adjust the supply and demand of an electric power company. SOLUTION: The system includes a means 62 to collect information on demand of a customer 6, and a means 42 to collect information on generated energy (output) of an electric power enterprise having the natural fluctuating electric power supply 4, and the information is collected at a supply and demand adjusting center 3 via a communications network 2. A monitor controller 31 computes and sets an output of a power system 5 for adjustment from such information so as to keep the balance of demand and supply, including the naturally fluctuating electric power supply 4. Its control value is transmitted to the power system 5 for adjustment via the communication network 2, and the generated energy is controlled by a control unit 53. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供如风力发电等自然波动电力供应与商业系统互连的方法和系统,并且不依赖于调整供需的能力而实现经济运行 的电力公司。 解决方案:该系统包括用于收集客户6的信息的装置62以及收集关于具有自然波动电力供应装置4的电力企业的生成能量(输出)的信息的装置42, 信息通过通信网络2在供需调整中心3收集。监视器控制器31计算并设置用于从这些信息进行调整的电力系统5的输出,以便保持需求和供应的平衡,包括自然 波动电源4.其控制值通过通信网络2发送到电力系统5进行调整,所产生的能量由控制单元53控制。(C)版权所有(C)2006,JPO&NCIPI
    • 8. 发明专利
    • State estimating device, method, and program for distribution system
    • 状态估计装置,分配系统的方法和程序
    • JP2006087177A
    • 2006-03-30
    • JP2004267685
    • 2004-09-15
    • Hitachi Ltd株式会社日立製作所
    • WATANABE MASAHIROKIMURA YASUTAKAOGAWA KENJIKOMURA AKIYOSHIUCHIYAMA TOMOYUKI
    • H02J3/00H02J13/00
    • PROBLEM TO BE SOLVED: To provide a state estimating device, a method, and a program for accurately estimating the power flow state of a distribution system from limited voltage/current observed values of the distribution system. SOLUTION: This distriubtion system state estimating device which estimates the state of the power flow of a distribution system is equipped with a distribution system state estimating part which computes the estimate of the state of the power distribution system based on a measurement database which stores measurements of the power distribution system, a facility database which stores upper and lower limit values of the load connected to the power distribution system, upper and lower limit values of the amount of power generation, and daily patterns or upper and lower limit values of the amount of line impedance modification, and the measurements of the power distirbution system read out of the measurement database and upper and lower limit values of a load connected to the power distribution system or the amount of power generation and the daily patterns or the upper and lower limit values of the amount of line impedance modification read out of the facility database, and a display part which indicates the estimate of the state of the power distribution system that the power distribution system state estimating part has computed. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种状态估计装置,方法和程序,用于从分配系统的有限电压/电流观测值精确地估计分配系统的功率流动状态。 解决方案:该分散系统状态估计装置,其估计分配系统的功率流的状态,配备有分配系统状态估计部,其基于测量数据库计算配电系统的状态的估计, 存储配电系统的测量,存储连接到配电系统的负载的上限值和下限值的设施数据库,发电量的上限值和下限值,以及每日模式或上下限值 线路阻抗修改量,以及从测量数据库中读出的功率分布系统的测量值以及连接到配电系统的负载的上限和下限值,或发电量和日常模式, 从设施数据库读出的线路阻抗修改量的下限值和显示器 表示配电系统状态估计部计算出的配电系统的状态的估计的部分。 版权所有(C)2006,JPO&NCIPI