会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Railway electric power control system
    • 铁路电力控制系统
    • JP2003079073A
    • 2003-03-14
    • JP2001266936
    • 2001-09-04
    • Hitachi Ltd株式会社日立製作所
    • OTA KENJISATO MASARUHATANAKA HIDEYUKI
    • H02J13/00B60M3/00
    • PROBLEM TO BE SOLVED: To prevent an operator from being impelled to divide one consistent operation due to a processing extent by each of a plurality of railway electric power control devices and attain a proper balance of processing constitutions between the railway electric power control devices even when controlled places are increased.
      SOLUTION: The railway electric power control system provided with a plurality of controlled places, a plurality of railway electric power control devices, and a display which monitors the condition of each equipment of the controlled places and performs control inputs on the screen thereof is also equipped with a control range table 109 which defines the extent of a display enable range, control output range and reception enable range, actuates a control acception processing 104 for merely a controlled place in a control output range 103 for the control command of a man-machine processing 102, when the operation command from the display is in a display enable range 101; in the case the control command differs from the controlled place in the control output range, transmits said control command to other railway electric power control devices by broadcasting, while in case the control command received by broadcasting from one of other railway electric power control devices is to be assigned to the control output range 106, the system actuates an associated processing 107 to remote monitoring control process 108 while transmitting data to the controlled place.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:为了防止操作者由于多个铁路电力控制装置中的每个铁路电力控制装置的处理程度而被划分一个一致的操作,并且即使在铁路电力控制装置之间也能够适当地平衡处理结构 受控场所增加。 解决方案:还配备有多个控制场所的铁路电力控制系统,多个铁路电力控制装置以及监视受控场所的各设备的状态并在其屏幕上进行控制输入的显示器 具有限定显示使能范围,控制输出范围和接收使能范围的范围的控制范围表109仅仅在用于人机的控制命令的控制输出范围103中的受控位置启动控制接受处理104 当来自显示器的操作命令处于显示允许范围101时的处理102; 在控制指令与控制输出范围内的受控位置不同的情况下,通过广播将所述控制命令发送到其他铁路电力控制装置,而在其他铁路电力控制装置中的广播接收到的控制命令为 被分配给控制输出范围106时,系统在将数据发送到受控的地方的同时致动相关联的处理107到远程监控控制过程108。
    • 4. 发明专利
    • Operation management system and remote maintenance method thereof
    • 操作管理系统及其远程维护方法
    • JP2009217488A
    • 2009-09-24
    • JP2008059822
    • 2008-03-10
    • Hitachi Ltd株式会社日立製作所
    • IWAMURA ATSUKIHASEGAWA SUSUMUHATANAKA HIDEYUKI
    • G06F9/445B61L27/00G06F11/00
    • PROBLEM TO BE SOLVED: To provide an operation management system, capable of shifting a control terminal with one auxiliary storage device connected thereto to new software by remote operation, and a remote maintenance method thereof.
      SOLUTION: The operation management system delivers a set of upgrade software when upgrading the control terminal 2 (S2). The system activates an OS and communication software of the control terminal 2 after the delivery, and develops the delivered upgrade software to an operation management application. After completion of the development, the control terminal 2 is restarted to mainly operate the control terminal 2. According to this method, even in the control terminal 2 with only one auxiliary storage device 2d, system upgrade can be performed, and the software upgrade can be remotely performed.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种操作管理系统,其能够通过远程操作将与其连接的一个辅助存储装置的控制终端和新的软件及其远程维护方法相移。

      解决方案:升级控制终端2时,操作管理系统提供一套升级软件(S2)。 该系统在交付之后激活控制终端2的操作系统和通信软件,并将交付的升级软件开发到操作管理应用。 在完成开发之后,控制终端2重新启动以主要操作控制终端2.根据该方法,即使在仅具有一个辅助存储装置2d的控制终端2中,也可以进行系统升级,并且软件升级可以 远程执行。 版权所有(C)2009,JPO&INPIT

    • 5. 发明专利
    • Operation management system, remote maintenance method of operation management system, and station processing device for operation management system
    • 操作管理系统,操作管理系统的远程维护方法和操作管理系统的站处理设备
    • JP2006248484A
    • 2006-09-21
    • JP2005071477
    • 2005-03-14
    • Hitachi Ltd株式会社日立製作所
    • IWAMURA ATSUKIHASEGAWA SUSUMUHATANAKA HIDEYUKI
    • B61L27/00G06F9/445G06F11/00
    • PROBLEM TO BE SOLVED: To provide an operation management system equipped with a means modifying software and recovering a system by remote control even when an auxiliary memory device breaks down, a remote maintenance method of the operation management system, and a station processing device for the operation management system, in a plurality of station processing devices installed with the software, a remote maintenance device distributing a set of modified software, and a system to which a communicating means for communicating between the station processing devices and the remote maintenance device is connected.
      SOLUTION: In case that auxiliary memory devices of the station processing devices 31 to 3n break down, only OS and communication software is started up by a stand-by auxiliary memory device for temporary recovery. After the temporary recovery, it is checked whether the software of the station processing devices 31 to 3n is the most suitable or not from the remote maintenance device 2. If it is determined that the software is not the most suitable version, the remote maintenance device 2 distributes the most suitable version of the software to the station processing devices 31 to 3n, and reboot the system. The system after rebooting can be perfectly recovered as the most suitable version.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:即使在辅助存储装置发生故障的情况下,也能够提供配备有修正软件的装置的操作管理系统和远程控制的系统的恢复,操作管理系统的远程维护方法以及站处理 用于操作管理系统的装置,在安装有软件的多个站处理装置中,分配一组修改后的软件的远程维护装置,以及用于在站处理装置和远程维护装置之间进行通信的通信装置的系统 已连接。 解决方案:在站处理设备31至3n的辅助存储设备故障的情况下,只有OS和通信软件由备用辅助存储设备启动以进行临时恢复。 在临时恢复之后,检查站处理装置31〜3n的软件是否与远程维护装置2最合适。如果确定软件不是最合适的版本,则远程维护装置 2将最合适的软件版本分发给站处理设备31至3n,并重启系统。 重新启动后的系统可以完美恢复为最合适的版本。 版权所有(C)2006,JPO&NCIPI
    • 7. 发明专利
    • Status display system and train operation status display system
    • 状态显示系统和火车操作状态显示系统
    • JP2005313666A
    • 2005-11-10
    • JP2004130582
    • 2004-04-27
    • Hitachi Ltd株式会社日立製作所
    • NASU TORUAZUMA KAZUYAHATANAKA HIDEYUKIMORI HIDEAKI
    • G06Q50/30B61L25/02G06Q50/00G06F17/60
    • PROBLEM TO BE SOLVED: To provide a status display system and a train operation status display system capable of reducing the man-hours of setup including version up of the system by a communication system capable of effectively also utilizing existing low speed communication infrastructure. SOLUTION: A blade server is used for a hardware of an operation status server 22 for editing an on-rail picture, a delay picture and schedule line picture based on information such as train on-rail information 27 and schedule information 28 obtained from PRC device 20 and CTC device 21 and track circuit information 29 and the MetaFrame system is used for communication with a station information client terminal 23, i.e., a client terminal. Thereby, differential information of a business picture prepared by the operation status server 22 is transmitted to the station information client terminal 23 and the business picture of high function is displayed even in the communication infrastructure of low speed. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种状态显示系统和列车运行状态显示系统,其能够通过能够有效地利用现有的低速通信基础设施的通信系统来减少包括系统版本的设置的工作时间 。 解决方案:刀片服务器用于操作状态服务器22的硬件,用于根据获得的列车轨道信息27和调度信息28等信息来编辑轨上画面,延迟画面和时间表画面画面 来自PRC设备20和CTC设备21以及轨道电路信息29,并且MetaFrame系统用于与站信息客户终端23即客户终端的通信。 由此,将由操作状态服务器22准备的业务画面的差分信息发送到站信息客户终端23,即使在低速通信基础设施中也显示高功能的业务画面。 版权所有(C)2006,JPO&NCIPI
    • 10. 发明专利
    • Command transmission system for railway facilities
    • 铁路设施指挥传输系统
    • JP2006193071A
    • 2006-07-27
    • JP2005007859
    • 2005-01-14
    • Hitachi Ltd株式会社日立製作所
    • SHINTANI FUMIHIKOHATANAKA HIDEYUKIHASEGAWA SUSUMUYOSHIDA KOKI
    • B61L27/00
    • PROBLEM TO BE SOLVED: To provide a command transmission system for railway facilities capable of easily accommodating addition of a command terminal and functional modification.
      SOLUTION: A plurality of command terminals A, B, C used by railway workers are respectively installed with a main tool function by POP, a transmission server CS for controlling the terminals is installed with a mail server function, and the transmission server is installed with a terminal control function by user account control to perform information transmission between the command terminals A, B, C and the transmission server CS by a POP function, thus increasing and decreasing the number of the command terminals A, B, C without the need for changing the transmission server CS.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供能够容易地容纳命令终端的附加和功能修改的铁路设施的命令传输系统。 解决方案:铁路工人使用的多个命令终端A,B,C分别由POP安装主工具功能,用于控制终端的传输服务器CS安装有邮件服务器功能,传输服务器 通过用户账号控制安装了终端控制功能,通过POP功能执行命令终端A,B,C与传输服务器CS之间的信息传输,从而增加和减少命令终端A,B,C的数量,而没有 需要更改传输服务器CS。 版权所有(C)2006,JPO&NCIPI