热词
    • 1. 发明专利
    • Wall body
    • 墙体
    • JP2013113074A
    • 2013-06-10
    • JP2011263330
    • 2011-12-01
    • Nippon Steel & Sumitomo Metal新日鐵住金株式会社Giken Seisakusho Co Ltd株式会社技研製作所
    • NAGAO NAOYATANAKA HIROMASAKITAMURA MORIOMINAMI TETSUOTAUCHI HIROAKIYASUOKA HIROYUKIKIMURA IKUMASA
    • E02D5/04
    • PROBLEM TO BE SOLVED: To provide a rational wall body suited to rigidity required in each location without deteriorating construction efficiency, by combining a steel pipe with a steel sheet pile wall and changing the rigidity of a steel sheet pile and a pitch of the steel pipe depending on a location when the required rigidity is different depending on the location since a part where a wall height is gradually changed is provided.SOLUTION: A wall body 11 is used as a retaining wall, an earth-retaining wall or a water cut-off wall, and has a different height depending on the location. The wall body 11 includes a steel sheet pile wall 13 composed of a hat-shaped steel sheet pile 12 and steel pipes 14 lined and provided along the steel sheet pile wall 13. The type of the steel sheet pile and an interval of the steel pipes 14 with each other are set on the basis of the required rigidity that is changed depending on a height. Thus, the wall body 11 changes the rigidity depending on the height, the wall body rigidity and a penetration length to an underground section are rationalized, and a material cost is reduced.
    • 要解决的问题:通过将钢管与钢板桩壁结合在一起,并且改变钢板桩的刚度和螺距,以提供适合于每个位置所需的刚性的合理的壁体,而不会降低施工效率 提供根据所要求的刚性不同的位置的钢管,这取决于壁高度逐渐变化的部分的位置。 解决方案:壁体11用作挡土墙,挡土墙或截水墙,并且根据位置具有不同的高度。 壁体11包括由帽状钢板桩12构成的钢板桩壁13和沿着钢板桩壁13排列设置的钢管14.钢板桩的类型和钢管的间隔 基于根据高度而改变的所需刚性来设定彼此。 因此,壁体11根据高度,壁体刚度和到地下部分的穿透长度而改变刚性,并且材料成本降低。 版权所有(C)2013,JPO&INPIT
    • 2. 发明专利
    • Steel wall
    • 钢铁墙
    • JP2013104282A
    • 2013-05-30
    • JP2011251141
    • 2011-11-16
    • Nippon Steel & Sumitomo Metal新日鐵住金株式会社Giken Seisakusho Co Ltd株式会社技研製作所
    • NAGAO NAOYATANAKA HIROMASAKITAMURA MORIOMINAMI TETSUOTAUCHI HIROAKIYASUOKA HIROYUKIKIMURA IKUMASA
    • E02D5/04
    • PROBLEM TO BE SOLVED: To construct a steel wall having both high rigidity similar to that of a steel pipe sheet pile wall and high cut-off performance similar to that of a steel sheet pile wall, by a hydraulic pressure press-in construction method or a rotation press-in construction method without the need for increasing in size an existing construction machine.SOLUTION: A steel wall 3 in which steel pipes 2 are provided so as to contact a steel pipe 1 in such a manner that longitudinal directions of the steel pipes 2 are along a longitudinal direction of the steel pile 1, is constructed by taking reaction force from the steel pile 1 constructed in advance and performing hydraulic press-in or rotary press-in of the steel pipe 2. In this case, the steel pile 1 and the steel pipes 2 may be connected with each other at their head portions. Otherwise, the steel wall 3 may be constructed by taking reaction force from the steel pile 1 similarly, performing hydraulic press-in or rotary press-in of the steel pipe 2, juxtaposing the steel pile 1 and the steel pipes 2 at an interval therebetween, and connecting their head portions with each other.
    • 要解决的问题:为了构造具有与钢管桩桩壁类似的高刚性的钢壁和类似于钢板桩壁的高截止性能,通过液压压入 施工方法或旋转压入施工方法,而不需要增加现有施工机械的尺寸。 解决方案:钢管2以钢管2的长度方向沿着钢桩1的长度方向与钢管1接触而设置的钢壁3由 从钢管1预先构成的反作用力进行钢管2的液压压入或旋转压入。在这种情况下,钢桩1和钢管2可以在其头部彼此连接 部分。 另外,钢壁3也可以由钢桩1的反作用力相同地进行,也可以进行钢管2的液压压入或旋转压入,并且以钢板1和钢管2间隔一段时间并排 并且将它们的头部部分彼此连接。 版权所有(C)2013,JPO&INPIT
    • 6. 发明专利
    • Jet nozzle device and its control means
    • 喷嘴装置及其控制手段
    • JP2006037674A
    • 2006-02-09
    • JP2004223266
    • 2004-07-30
    • Giken Seisakusho Co Ltd株式会社技研製作所
    • KITAMURA MORIOMINAMI TETSUOTSUNO TETSUYA
    • E02D7/24E02D5/32
    • PROBLEM TO BE SOLVED: To provide a jet nozzle device capable of securely operating a reverse injection mechanism when certain loads are applied to a socket and a nozzle body and to provide its control means.
      SOLUTION: This jet nozzle device is composed of the nozzle body 30 having an injection port 23 and a passage 31 for jet water and having a reverse injection port 32 communicating with the passage 31 in a section different from the injection port 23 and opened outward and the cylindrical socket 20 for attaching the nozzle body 30. A channel 21 is constituted by matching it with an opening part of the reverse injection port 32 on the inner peripheral face of the socket 20. A socket injection port 33 communicating with the channel 21 is constituted. When attaching the socket 20 to a pile 10, the socket injection port 33 is closed by the pile 10, and the socket injection port 33 is opened when the socket 20 drops from the pile 10 to inject jet water. At the same time, an amount of the discharge water of a pump 50 is kept at a proper amount by a pressure sensor 52 for detecting the reduction of the discharge pressure of the pump 50 and a control part 53.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种能够在将某些负载施加到插座和喷嘴体上并且提供其控制装置时能够可靠地操作反向喷射机构的喷嘴装置。 解决方案:该喷嘴装置由具有喷射口23的喷嘴体30和喷射水用通路31构成,具有与喷射口23不同的部分与通路31连通的反向喷射口32, 向外侧开口和用于安装喷嘴主体30的圆筒形插座20.通道21通过与插座20的内周面上的反向注入口32的开口部匹配而构成。插座注入口33与 构成通道21。 当将插座20安装到堆10上时,插座注入口33由桩10封闭,当插座20从桩10下落以喷射射流水时,插座注入口33打开。 同时,通过用于检测泵50和控制部分53的排出压力的降低的压力传感器52将泵50的排出水量保持在适当的量。(COPYRIGHT:( C)2006,JPO&NCIPI
    • 7. 发明专利
    • Continuous construction method of revetment, and method of widening river or the like
    • 连续施工方法,以及增加河流等的方法
    • JP2005133348A
    • 2005-05-26
    • JP2003368034
    • 2003-10-28
    • Giken Seisakusho Co LtdNippon Steel Corp新日本製鐵株式会社株式会社技研製作所
    • KITAMURA MORIOMINAMI TETSUOTAUCHI HIROAKIYASUOKA HIROYUKIHIRATA TAKASHIYAMASHITA HISAO
    • E02B3/12E02D7/20
    • PROBLEM TO BE SOLVED: To provide a construction method for efficiently repairing a revetment of a river or a dike by continuously pressing in steel pipe piles without needing a large-scale temporary device, and to provide a method of widening the river or the like utilizing the construction method.
      SOLUTION: In this continuous construction method of the revetment, equipment such as a crane is arranged ready to work on a steel pipe pile line PL, and the steel pipe pile line PL is constructed at the concrete revetment using a steel pipe pile press-in device 11 capable of rotationally pressing in the steel pipe piles P. While obtaining reaction from the steel pipe pile line PL, the steel pipe piles P are rotationally pressed in to construct a continuous wall. The continuous wall is constructed using this method, and then a working device or the like for carrying out widening work is disposed near the steel pipe pile line PL to remove sediment or the like on the river side or to dredge the nearby water bottom.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种通过在不需要大型临时装置的情况下连续地对钢管桩进行冲压来有效地修复河堤或堤坝的施工方法,并且提供一种拓宽河流或堤坝的方法 利用施工方法。

      解决方案:在这种连续的护岸施工方法中,将起重机等设备准备在钢管桩线PL上工作,钢管桩线PL使用钢管桩在混凝土护岸上构造 压入装置11能够在钢管桩P中旋转地按压。在从钢管桩线PL获得反作用力的同时,钢管桩P被旋转地压入以构成连续的壁。 使用该方法构造连续壁,然后在钢管桩线PL附近设置用于进行加宽工作的加工装置等,以除去河侧的沉积物等或疏通附近的水底。 版权所有(C)2005,JPO&NCIPI