    • 2. 发明专利
    • Continuous construction method of revetment, and method of widening river or the like
    • 连续施工方法,以及增加河流等的方法
    • JP2005133348A
    • 2005-05-26
    • JP2003368034
    • 2003-10-28
    • Giken Seisakusho Co LtdNippon Steel Corp新日本製鐵株式会社株式会社技研製作所
    • KITAMURA MORIOMINAMI TETSUOTAUCHI HIROAKIYASUOKA HIROYUKIHIRATA TAKASHIYAMASHITA HISAO
    • E02B3/12E02D7/20
    • PROBLEM TO BE SOLVED: To provide a construction method for efficiently repairing a revetment of a river or a dike by continuously pressing in steel pipe piles without needing a large-scale temporary device, and to provide a method of widening the river or the like utilizing the construction method.
      SOLUTION: In this continuous construction method of the revetment, equipment such as a crane is arranged ready to work on a steel pipe pile line PL, and the steel pipe pile line PL is constructed at the concrete revetment using a steel pipe pile press-in device 11 capable of rotationally pressing in the steel pipe piles P. While obtaining reaction from the steel pipe pile line PL, the steel pipe piles P are rotationally pressed in to construct a continuous wall. The continuous wall is constructed using this method, and then a working device or the like for carrying out widening work is disposed near the steel pipe pile line PL to remove sediment or the like on the river side or to dredge the nearby water bottom.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种通过在不需要大型临时装置的情况下连续地对钢管桩进行冲压来有效地修复河堤或堤坝的施工方法,并且提供一种拓宽河流或堤坝的方法 利用施工方法。

      解决方案:在这种连续的护岸施工方法中,将起重机等设备准备在钢管桩线PL上工作,钢管桩线PL使用钢管桩在混凝土护岸上构造 压入装置11能够在钢管桩P中旋转地按压。在从钢管桩线PL获得反作用力的同时,钢管桩P被旋转地压入以构成连续的壁。 使用该方法构造连续壁,然后在钢管桩线PL附近设置用于进行加宽工作的加工装置等,以除去河侧的沉积物等或疏通附近的水底。 版权所有(C)2005,JPO&NCIPI

    • 4. 发明专利
    • Open ended steel pipe pile for rotatingly jacking and rotatingly jacking method for open ended steel pipe pile
    • 开放式钢管开式钢管和开式钢管管道旋转方法
    • JP2005127095A
    • 2005-05-19
    • JP2003366305
    • 2003-10-27
    • Giken Seisakusho Co LtdNippon Steel Corp新日本製鐵株式会社株式会社技研製作所
    • HIRATA TAKASHIYAMASHITA HISAOKITAMURA MORIOMINAMI TETSUOYASUOKA HIROYUKIKIMURA IKUMASAMURATA TOSHIHIKO
    • E02D5/32E02D5/56E02D7/20E02D7/22E02D7/24
    • PROBLEM TO BE SOLVED: To provide a steel pipe pile easily constructible and having excellent economic efficiency and a rotatingly jacking method for the steel pipe pile as an auxiliary construction method for suppressing a penetration resistance when rotatingly jacking a steel pipe pile for building structures and steel pipe bracing type retaining walls.
      SOLUTION: In this open ended steel pipe pile for the foundation or steel pipe bracing type retaining walls of a civil engineering and building structures, a pipe for fluid supply is disposed downward from the upper end of the steel pipe pile along the inner wall of the steel pipe pile. The lower end of the pipe extends from the lower end of the steel pipe pile to a pipe inside soil clogging start position on the upper side of the lower end of the pipe. Nozzles for fluid discharge are disposed in the pipe at one or two positions between the lower end of the pipe and the pipe inside soil clogging start position so that a fluid can be discharged in the circumferential direction along the inner wall of the steel pipe pile.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种易于构造且具有优良经济效益的钢管桩和用于钢管桩的旋转起重方法作为用于在旋转顶起建筑物钢管桩时抑制耐渗透性的辅助施工方法 结构和钢管支撑型挡土墙。

      解决方案:在这种用于土木工程和建筑结构的基础或钢管支撑型挡土墙的开放式钢管桩中,用于供应流体的管道沿着内侧从钢管桩的上端向下设置 钢管桩墙。 管的下端从钢管桩的下端延伸到管道下端上侧的管内的管道堵塞开始位置。 用于流体排放的喷嘴在管子的下端和土壤堵塞开始位置之间的一个或两个位置处设置,使得流体可以沿着钢管桩的内壁在圆周方向上排出。 版权所有(C)2005,JPO&NCIPI

    • 7. 发明专利
    • Foundation pile and method for constructing the same
    • 基础桩及其构造方法
    • JP2010242464A
    • 2010-10-28
    • JP2009095731
    • 2009-04-10
    • Nippon Steel Corp新日本製鐵株式会社
    • ISHIHAMA YOSHIROTAKAGI MASATAKASAIKAI KENJIHIRATA TAKASHI
    • E02D5/48E02D5/28E02D7/28
    • PROBLEM TO BE SOLVED: To provide a foundation pile which enables the sure integration of a foot protection portion with the pile having a tapered portion provided at the leading end of the pile, and a method for constructing the foundation pile. SOLUTION: This foundation pile employs a steel pipe pile. The steel pipe pile, the leading end of which is opened, has the tapered portion which includes tapered outer and inner peripheral surfaces having diameters gradually reduced toward its leading end. In the foundation pile 1, the tapered portion 4 is embedded in the foot protection part 5 which is created in such a manner as to undergo the embedment of the leading end of the steel pipe pile. The ratio (H1/D1) of the length H1 of the tapered portion 4 in the longitudinal direction of the pile to an outside diameter D1 of the constant part, having a fixed outside diameter, of the steel pipe pile is set to be in the range of 0.1-2.0. The diameter reduction ratio of the tapered portion, which is the ratio (D2/D1) of an outside diameter D2 of a leading end of the tapered portion to the outside diameter D1 of the constant part, having the fixed outside diameter, of the steel pipe pile above the tapered portion 4, is set to be in the range of 0.80-0.95. In the method for constructing the foundation pile, the foot protection part 5 for embedding the tapered portion 4 at the leading end of the steel pipe pile is created. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种基桩,其能够确保足部保护部与具有设置在桩的前端的锥形部的桩一体化,以及用于构造地基桩的方法。

      解决方案:该基桩采用钢管桩。 其前端开放的钢管桩具有锥形部分,该锥形部分包括具有逐渐朝其前端逐渐减小的锥形外周和内周表面。 在基础桩1中,锥形部分4嵌入脚部保护部分5中,该脚部保护部分5以经过钢管桩的前端的嵌入的方式产生。 锥形部4的长度方向的长度H1与桩长的固定部的外径D1的长度方向的比(H1 / D1)设定为 范围为0.1-2.0。 作为锥形部的直径减小率,其为锥形部的前端的外径D2与具有固定外径的恒定部的外径D1的比(D2 / D1) 锥形部分4上方的管桩被设定在0.80-0.95的范围内。 在基础桩的构造方法中,形成用于将锥形部4嵌入钢管桩的前端的脚部保护部5。 版权所有(C)2011,JPO&INPIT

    • 8. 发明专利
    • Method for laser beam welding of sheet material
    • 激光束焊接材料的方法
    • JP2006218497A
    • 2006-08-24
    • JP2005033563
    • 2005-02-09
    • Nippon Steel Corp新日本製鐵株式会社
    • ISHIBASHI HIROOHIRATA TAKASHI
    • B23K26/20B23K101/18
    • PROBLEM TO BE SOLVED: To provide a method for laser beam butt welding of metallic sheets having different thicknesses, which method can eliminate recessed portions formed on the bottom surface of a welding bead, and does not cause the loss of welding energy even if some clearances exist in butted portions, and can weld tailored blank materials having excellent formability with small electric energy consumption and high productivity. SOLUTION: In the method for laser beam welding, two sheets having different thicknesses are butted in the state that one side surfaces of them are shifted from each other, and are welded by moving a laser beam relative to the sheet material while radiating the laser beam to the shifted surface side of the one side surfaces along the butted line. In the welding method, the whole of the laser beam are radiated on the thick sheet side, and the welding speed is varied during the welding operation. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供一种用于不同厚度的金属板的激光束对接焊接方法,该方法可以消除形成在焊道的底面上的凹陷部分,并且不会造成焊接能量的损失,甚至 如果在对接部分存在一些间隙,并且可以以小的电能消耗和高生产率焊接具有优异成形性的定制坯料。 解决方案:在激光束焊接方法中,具有不同厚度的两个片材在它们的一个侧表面彼此偏移的状态下对接,并且通过相对于片材移动激光束而被焊接,同时辐射 沿着对接线的一侧的移动表面侧的激光束表面。 在焊接方法中,将整个激光束照射在厚板侧,并且焊接速度在焊接操作期间变化。 版权所有(C)2006,JPO&NCIPI
    • 9. 发明专利
    • Expanded head in hollow pile inner digging/embedding device
    • 中空钻头内嵌/嵌入式装置中的扩展头
    • JP2005315052A
    • 2005-11-10
    • JP2005017703
    • 2005-01-26
    • Nippon Steel CorpSanwa Kizai Co LtdTenox Corp三和機材株式会社新日本製鐵株式会社株式会社テノックス
    • YAMAZAKI KAZUOHISHIYAMA TAMOTSUTERASAKI SHIGEKIYANAGI ETSUTAKAHIRATA TAKASHIISHIHAMA YOSHIRO
    • E21B10/32E02D7/00E21B10/44
    • PROBLEM TO BE SOLVED: To extract an expanded blade from the inside of the ground by being displaced to the head rod side, when the expanded blade cannot be contractively closed by nipping sediment in contractive closure.
      SOLUTION: In this expanded head in a hollow pile inner digging/embedding device, a piston fixing type or cylinder fixing type hydraulic cylinder is coaxially built in a head rod of a rod lower end part of excavation work; a base end part of the expanded blade is rockingly jointed by a pin on a plane passing through the axial line of the head rod in an outer peripheral part of the head rod; the other end of an operation link having one end jointed by a pin to a cylinder or a piston to be reciprocated in the hydraulic cylinder, is jointed by a pin to an intermediate part of the expanded blade for expansively and contractively rocking the expanded blade; and any one or a plurality of pins of respective pin joints of the expanded blade and the operation link, can be sheared by a collision with the hollow pile lower end of the expanded blade.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:通过移动到头杆侧从地面内部提取膨胀的叶片,当膨胀的叶片不能通过在收缩闭合中夹入沉淀物而收缩闭合时。 解决方案:在空心桩内挖掘/嵌入装置的这种扩展头中,活塞固定式或筒式固定式液压缸同轴地安装在挖掘工作的杆下端部分的头杆中; 扩展叶片的基端部在销杆的外周部分穿过头杆的轴线的平面上被销摆动地接合; 一个操作连杆的另一端通过一个销端连接到一个气缸或一个在液压缸中往复运动的活塞,由销钉连接到膨胀叶片的中间部分,用于膨胀和收缩地摆动膨胀叶片; 并且膨胀叶片和操作连杆的相应销接头的任何一个或多个销可以通过与膨胀叶片的中空桩下端的碰撞而剪切。 版权所有(C)2006,JPO&NCIPI