    • 2. 发明申请
    • METHOD FOR ERECTING A TOWER, AND TOWER
    • 塔楼和塔楼的方法
    • US20120124919A1
    • 2012-05-24
    • US13318762
    • 2010-05-05
    • Markus VogelJens Hofmann
    • Markus VogelJens Hofmann
    • E04B1/35E04G21/02E04H12/34E04C2/20E04H12/00E02D27/42
    • F03D1/001F03D13/10F05B2230/608F05B2240/912F05B2260/30Y02E10/728Y02P70/523
    • A method of erecting a pylon of a wind power installation is provided. The method includes providing a foundation and placing a plurality of height adjusting units on the foundation. The height adjusting units are made substantially from a plastic material. A load distribution ring is placed on the plurality of height adjusting units. The load distribution ring is straightened and leveled by adjustment of the height adjusting units. A gap between the foundation and the load distribution ring is filled with a grouting material. A pylon segment is placed on the load distribution ring after the grouting material has reached a predetermined strength. The height adjusting units are configured to jointly bear the weight of the load distribution ring, and are configured to yield under a selected load that is greater that a weight of the load distribution ring
    • 提供了一种竖立风力发电设备的塔架的方法。 该方法包括提供基础并将多个高度调节单元放置在基础上。 高度调节单元基本上由塑料材料制成。 负载分配环放置在多个高度调节单元上。 负载分配环通过高度调节单元的调整而拉直和调平。 基础和负荷分配环之间的间隙填充有灌浆材料。 在注浆材料达到预定强度后,将塔架段放置在负载分配环上。 高度调节单元被配置为共同承担负载分配环的重量,并且被配置为在选定的负载下产生大于负载分配环的重量
    • 3. 发明授权
    • Shotcrete spraying process
    • 喷浆喷涂工艺
    • US5851580A
    • 1998-12-22
    • US772682
    • 1996-12-23
    • Felix AmbergOtto TschumiMarkus Vogel
    • Felix AmbergOtto TschumiMarkus Vogel
    • E21D11/10B05D7/22B05D7/24
    • E21D11/105Y10S118/10
    • A mobile shortcrete spraying apparatus has a spraying device which comprises a support arm able to move horizontally and vertically, a spray lance likewise movable, supported thereon, and at the end of the lance and rotatable with respect to the longitudinal axis of the lance a spray nozzle and a measuring probe. The measuring probe determines distance of the probe from a multiplicity of measuring points on a substrate to be sprayed, according to a predetermined grid pattern, and a control unit causes the spray nozzle to spray perpendicularly with respect to a plane defined by three such measuring points or a line defined by two measuring points.
    • 一种移动式混凝土喷涂装置具有喷射装置,其包括能够水平和垂直移动的支撑臂,同时可移动的支撑臂,并支撑在其上,并且在喷枪的端部处可相对于喷枪的纵向轴线旋转,喷雾器 喷嘴和测量探头。 测量探针根据预定的网格图案确定探针与要喷射的基底上的多个测量点的距离,并且控制单元使得喷嘴相对于由三个这样的测量点定义的平面垂直地喷射 或由两个测量点定义的线。
    • 4. 发明申请
    • ELECTRONICALLY COMMUTATED ELECTRIC MOTOR COMPRISING ROTOR POSITION DETECTION WITH INTERFERENCE FIELD COMPENSATION
    • 具有干扰场补偿的包括转子位置检测的电子式电动马达
    • US20140197766A1
    • 2014-07-17
    • US14110889
    • 2012-04-11
    • Antoine ChabaudMartin FreySven FinkeFrank SaderMarkus Vogel
    • Antoine ChabaudMartin FreySven FinkeFrank SaderMarkus Vogel
    • H02P6/16
    • H02P6/16H02K11/25H02K29/08
    • An electronically commutated electric motor includes a stator and a rotor formed as a permanent magnet. A control unit is connected to the stator and configured to energize the stator to produce a rotating magnetic field. The electric motor further includes at least one Hall sensor configured to detect at least a magnitude of a sensor magnetic field produced by a sensor magnet connected to the rotor. The electric motor also includes at least one magneto resistive sensor configured to detect an alignment of a total magnetic field during a rotor revolution of the rotor and to generate a rotor position signal representing this alignment. The total magnetic field includes the sensor magnetic field and an interference magnetic field superimposed thereon. The control unit is further configured to determine the rotor position of the rotor at least depending on the alignment of the total magnetic field.
    • 电子换向电动机包括定子和形成为永磁体的转子。 控制单元连接到定子并且被配置为使定子通电以产生旋转磁场。 所述电动机还包括至少一个霍尔传感器,所述至少一个霍尔传感器被配置为检测由连接到所述转子的传感器磁体产生的传感器磁场的至少大小。 电动机还包括至少一个磁阻传感器,其构造成在转子的转子旋转期间检测总磁场的对准并产生表示该对准的转子位置信号。 总磁场包括传感器磁场和叠加在其上的干涉磁场。 控制单元还被配置为至少根据总磁场的对准来确定转子的转子位置。
    • 7. 发明授权
    • Electronically commutated electric motor comprising rotor position detection with interference field compensation
    • 电子换向电动机包括具有干涉场补偿的转子位置检测
    • US09438152B2
    • 2016-09-06
    • US14110889
    • 2012-04-11
    • Antoine ChabaudMartin FreySven FinkeFrank SaderMarkus Vogel
    • Antoine ChabaudMartin FreySven FinkeFrank SaderMarkus Vogel
    • H02K29/08H02P6/16
    • H02P6/16H02K11/25H02K29/08
    • An electronically commutated electric motor includes a stator and a rotor formed as a permanent magnet. A control unit is connected to the stator and configured to energize the stator to produce a rotating magnetic field. The electric motor further includes at least one Hall sensor configured to detect at least a magnitude of a sensor magnetic field produced by a sensor magnet connected to the rotor. The electric motor also includes at least one magneto resistive sensor configured to detect an alignment of a total magnetic field during a rotor revolution of the rotor and to generate a rotor position signal representing this alignment. The total magnetic field includes the sensor magnetic field and an interference magnetic field superimposed thereon. The control unit is further configured to determine the rotor position of the rotor at least depending on the alignment of the total magnetic field.
    • 电子换向电动机包括定子和形成为永磁体的转子。 控制单元连接到定子并且被配置为使定子通电以产生旋转磁场。 所述电动机还包括至少一个霍尔传感器,所述至少一个霍尔传感器被配置为检测由连接到所述转子的传感器磁体产生的传感器磁场的至少大小。 电动机还包括至少一个磁阻传感器,其构造成在转子的转子旋转期间检测总磁场的对准并产生表示该对准的转子位置信号。 总磁场包括传感器磁场和叠加在其上的干涉磁场。 控制单元还被配置为至少根据总磁场的对准来确定转子的转子位置。
    • 9. 发明授权
    • Method for erecting a tower, and tower
    • 建立塔架和塔架的方法
    • US08857131B2
    • 2014-10-14
    • US13318762
    • 2010-05-05
    • Markus VogelJens Hofmann
    • Markus VogelJens Hofmann
    • E04B1/35E02D27/32F03D1/00
    • F03D1/001F03D13/10F05B2230/608F05B2240/912F05B2260/30Y02E10/728Y02P70/523
    • A method of erecting a pylon of a wind power installation is provided. The method includes providing a foundation and placing a plurality of height adjusting units on the foundation. The height adjusting units are made substantially from a plastic material. A load distribution ring is placed on the plurality of height adjusting units. The load distribution ring is straightened and leveled by adjustment of the height adjusting units. A gap between the foundation and the load distribution ring is filled with a grouting material. A pylon segment is placed on the load distribution ring after the grouting material has reached a predetermined strength. The height adjusting units are configured to jointly bear the weight of the load distribution ring, and are configured to yield under a selected load that is greater that a weight of the load distribution ring.
    • 提供了一种竖立风力发电设备的塔架的方法。 该方法包括提供基础并将多个高度调节单元放置在基础上。 高度调节单元基本上由塑料材料制成。 负载分配环放置在多个高度调节单元上。 负载分配环通过高度调节单元的调整而拉直和调平。 基础和负荷分配环之间的间隙填充有灌浆材料。 在注浆材料达到预定强度后,将塔架段放置在负载分配环上。 高度调节单元被配置为共同承担负载分配环的重量,并且被配置成在比负载分配环的重量更大的选定负载下产生。
    • 10. 发明申请
    • SAMPLING
    • 采样
    • US20120176179A1
    • 2012-07-12
    • US13312668
    • 2011-12-06
    • Christian HardersWolf FronauerShaoyun ChengMarkus VogelDirk Fischer
    • Christian HardersWolf FronauerShaoyun ChengMarkus VogelDirk Fischer
    • H03K17/96G01N27/22
    • H03K17/962G06F3/0416G06F3/044H03K17/9622H03K2217/960705H03K2217/960715
    • Integrated circuitry, comprising: a sampling terminal for connecting the integrated circuitry to an external capacitance; sampling means operatively connected to the terminal to take samples, each sample having a sample value; and control means configured, whilst said external capacitance is connected to the sampling terminal, to: internally connect the sampling terminal, or another terminal of the integrated circuitry to which the external capacitance is also connected, to a given voltage-potential source to effect a change in charge stored on the external capacitance, the given voltage-potential source being available within the integrated circuitry when it is in use; cause the sampling means to take a plurality of samples over a period whilst that external capacitance charges or discharges following and/or during said change in charge; and judge whether an event has occurred in dependence upon the plurality of samples.
    • 集成电路,包括:用于将集成电路连接到外部电容的采样端子; 采样装置可操作地连接到端子以取样,每个样品具有样品值; 以及控制装置,在所述外部电容连接到采样端子的同时,将所述采样端子或外部电容也连接的集成电路的另一个端子内部连接到给定的电压电位源,以实现 存储在外部电容上的电荷变化,给定的电压 - 电位源在使用时在集成电路内可用; 使得采样装置在一段时间内采集多个采样,同时外部电容在所述电荷变化之后和/或期间对其进行充电或放电; 并且根据多个样本来判断事件是否发生。