会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明专利
    • BURIED PIPE FEED JIG IN PROPULSION CONSTRUCTION METHOD
    • JPH0978984A
    • 1997-03-25
    • JP23527895
    • 1995-09-13
    • MORIMOTOGUMI KK
    • AOKI KENICHI
    • E21D9/06
    • PROBLEM TO BE SOLVED: To heighten workability by providing a bearing part with contact parts to come in contact with a plurality of places of a buried pipe, and providing a belt for holding the buried pipe in a constrained state jointly with the contact parts, and a belt tightening means. SOLUTION: A bearing part A1 of a feed jig A is placed on the upper peripheral surface of a buried pipe P to be connected so as to bring base plates 3 of contact parts C into contact with the upper peripheral surface. A belt 7 is wound around the lower peripheral circle of the buried pipe P, and a hook 7a is fastened to a support rod 2a. A handle 11 of a tightening means D is turned to rotate a winding shaft 8 in a tightening direction through a ratchet claw 10 and a ratchet gear 9 so as to hold the buried pipe P in a constrained state by the belt 7 and the base plates 3. A connecting metal fitting W' at the end of a wire W is hooked to a suspension ring 5 of a suspension screw rod 6 of the bearing part A1, suspended by a crane and lowered into a start shaft to place rollers 14 of a guide part A2 on sliding guide rods (g) of a force-feed body. When the pipe axes of a preceding buried pipe and the buried pipe P do not coincide with each other, an adjusting nut 15 of the screw rod 6 is rotated to move the buried pipe P vertically, thus making the axes of both pipes coincide with each other.
    • 10. 发明专利
    • METHOD AND EQUIPMENT FOR CONTROLLING DRILLING DIRECTION IN SECOND STEP IN TWO-STEP PIPE JACKING METHOD
    • JPH09144481A
    • 1997-06-03
    • JP30240595
    • 1995-11-21
    • MORIMOTOGUMI KK
    • AOKI KENICHI
    • E21D9/093E21D9/06E21D9/08
    • PROBLEM TO BE SOLVED: To correct the direction by measuring the deviation of a pilot pipe row by drilling in the false direction of an excavation cutter by a position sensing means, directing the eccentric direction so as to receive reverse deviated earth pressure in a pressure-change receiving surface and conducting the drilling. SOLUTION: A target T is disposed at an opening end on the departure shaft side of the hollow pile of a pilot pipe row and a transit C at an opening end on the arrival shaft side. The pilot pipe row P of a first step completely excavated while directly viewing the target T by the transit C is guided while being taken into a screw 4, a screw pipe row 4b and an inserting port 7, and an excavation cutter 3 is rotated and drilled by a pusher arranged to a departure shaft. When the deviation of the pilot pipe row from a laying projecting line L is recognized, the eccentric quantity and eccentric direction of the excavation cutter 3 are measured, drilling is stopped and a deviated earth-pressure receiving surface 8b is directed so as to receive deviated earth pressure perverse to the eccentric direction, and the drilling is performed and the direction is corrected by the eccentric quantity, thus accurately laying a buried pipe.