会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 10. 发明授权
    • Method and system for scheduling tests in a parallel test system
    • 并行测试系统中调度测试的方法和系统
    • US07543200B2
    • 2009-06-02
    • US11062244
    • 2005-02-17
    • Ankan PramanickToshiaki AdachiMark Elston
    • Ankan PramanickToshiaki AdachiMark Elston
    • G01R31/28G11C29/00G06F11/00
    • G01R31/31907G01R31/31912
    • An efficient and low-cost method for testing multiple DUTs in a parallel test system is disclosed. In one embodiment, a method for scheduling tests in a parallel test system having at least two devices-under-test (DUTs) coupled to a test controller through one or more vendor hardware modules includes receiving a test plan comprising a plurality of tests arranged in a predetermined test flow, where the predetermined test flow comprises a plurality of tests arranged in a directed graph and each test is arranged as a vertex in the directed graph, determining a test execution schedule in accordance with the test plan at runtime, where the test execution schedule identifies a set of next tests to be executed according to current states of the at least two DUTs and where the set of next tests include different tests to be performed on different DUTs, and testing the at least two DUTs using the test execution schedule.
    • 公开了一种用于在并行测试系统中测试多个DUT的有效且低成本的方法。 在一个实施例中,一种用于在具有通过一个或多个供应商硬件模块耦合到测试控制器的至少两个被测设备(DUT))的并行测试系统中调度测试的方法包括:接收包括多个测试 预定测试流程,其中预定测试流程包括以有向图形布置的多个测试,并且每个测试被布置为有向图中的顶点,根据运行时的测试计划确定测试执行计划,其中测试 执行时间表根据所述至少两个DUT的当前状态识别要执行的一组下一个测试,并且下一个测试的集合包括将在不同的DUT上执行的不同的测试,以及使用测试执行时间表测试所述至少两个DUT 。