    • MANAGING CONGESTION IN AN ELECTRICAL POWER TRANSMISSION NETWORK
    • 在电力传输网络中管理紧急情况
    • WO2006092067A1
    • 2006-09-08
    • PCT/CH2005/000125
    • 2005-03-03
    • ABB RESEACH LTD.YUEN, CherryLARSSON, Mats
    • YUEN, CherryLARSSON, Mats
    • H02J3/00
    • H02J3/008Y04S50/10
    • The present invention is concerned with a method and system for managing congestion in an electrical transmission network. The electrical transmission network includes Power Flow Control Devices (PFDs) that adjust the transmission capability of the electrical transmission network. The method includes determination of a reference generation schedule followed by setting up of an objective function based on the reference generation schedule, a power flow in the electrical transmission network, bids for regulation, an actual generation schedule, and set points of PFDs. An optimisation problem is solved to minimize the objective function for a set of decision variables and the set of decision variables is applied in order to minimize congestion cost in the electrical transmission network.
    • 本发明涉及用于管理电力传输网络中的拥塞的方法和系统。 电力传输网络包括调整电力传输网络传输能力的功率流量控制装置(PFD)。 该方法包括基于参考生成计划,电力传输网络中的功率流,调节出价,实际发电计划以及PFD的设定点来确定参考产生计划,随后建立目标函数。 解决了优化问题,以最小化一组决策变量的目标函数,并且应用一组决策变量以最小化电力传输网络中的拥塞成本。
    • 3. 发明申请
    • DISTRIBUTION CONTROLLER AND A METHOD FOR IDENTIFYING AN ORPHAN NETWORK AND TRANSMITTING A STANDARDIZED DESCRIPTION OF THE ORPHAN NETWORK TO ANOTHER DISTRIBUTION CONTROLLER
    • 分布式控制器和一种用于识别ORPN网络的方法,并将ORPHAN网络的标准化描述发送给另一个分发控制器
    • WO2009112444A1
    • 2009-09-17
    • PCT/EP2009/052700
    • 2009-03-09
    • ABB RESEARCH LTDLARSSON, MatsFREI, ChristianTIMBUS, AdrianYUEN, Cherry
    • LARSSON, MatsFREI, ChristianTIMBUS, AdrianYUEN, Cherry
    • H02J13/00
    • H02J3/005H02J13/0013Y02E60/724Y02E60/7807Y04S10/18Y04S40/12
    • The present invention is concerned with a distribution controller (19) for controlling a distribution of electrical power in an assigned first power distribution region (1). The controller is adapted to be connected to process devices (21) which in turn interact with primary devices (5, 7, 9, 11, 13) of the assigned first region. The distribution controller is provided with a standardized, machine-readable network description of the first region and comprises means to identify, following a network reconfiguration, the extent of an orphan network section (23) that is no longer connected to the first region. The distribution controller is further adapted to transmit a description of the orphan network section to a second distribution controller (19') controlling a second or neighbouring power distribution region (1') to which the orphan section has been connected as a consequence of the network reconfiguration. Due to this capability of transmitting descriptions of the network section changing hands, there is no need to keep and update a description of the entire network in each controller of the power distribution system.
    • 本发明涉及用于控制分配的第一配电区域(1)中的电力分配的配电控制器(19)。 控制器适于连接到处理设备(21),过程设备又与所分配的第一区域的主设备(5,7,9,11,13)进行交互。 分配控制器被提供有第一区域的标准化的机器可读网络描述,并且包括用于在网络重新配置之后识别不再连接到第一区域的孤立网络部分(23)的范围的装置。 分配控制器还适于将孤儿网络部分的描述发送到控制作为网络的结果而连接了孤儿部分的第二或相邻功率分配区域(1')的第二分配控制器(19') 重新配置。 由于能够发送网络部分切换手的描述的能力,不需要在配电系统的每个控制器中保持和更新整个网络的描述。
    • 4. 发明申请
    • DISTRIBUTION CONTROLLER
    • 分配控制器
    • WO2009016037A1
    • 2009-02-05
    • PCT/EP2008/059343
    • 2008-07-17
    • ABB Research LtdLARSSON, MatsYUEN, CherryHAKALA-RANTA, Antti
    • LARSSON, MatsYUEN, CherryHAKALA-RANTA, Antti
    • H02J13/00
    • H02J13/0062H02J3/00Y02E60/724Y02E60/7838Y04S10/18Y04S40/124
    • The present invention is concerned with a distribution controller (19) for controlling a distribution of electrical power in an assigned power distribution region (1). The controller is communicatively connected to process or secondary devices (IEDs, RTUs) (21a, 21b, 21c) which in turn interact with primary devices (5, 7, 9, 11, 17) of the assigned region. The controller comprises a processing module (29) which implements application function algorithms that calculate, based on process data from process devices connected to the controller, values of a power distribution quantity such as voltage, current, power flow, load, or a phasor quantity of the assigned region. The controller further comprises data servers (27a, 27b, 27c). The controller is adapted for writing the output or results of the algorithms i.e. a value of the aforementioned power distribution quantity, to one of said data servers, and thus takes advantage of the existing controller structure.
    • 本发明涉及用于控制分配的配电区域(1)中的电力分配的配电控制器(19)。 控制器通信地连接到过程或辅助设备(IED,RTU)(21a,21b,21c),后者又与分配区域的主设备(5,7,9,11,17)进行交互。 控制器包括处理模块(29),该处理模块(29)实现应用功能算法,该应用功能算法基于连接到控制器的过程设备的过程数据,计算诸如电压,电流,功率流,负载或相量的功率分配量 的分配地区。 控制器还包括数据服务器(27a,27b,27c)。 控制器适于将所述算法的输出或结果(即上述功率分配量的值)写入所述数据服务器之一,从而利用现有的控制器结构。