会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明公开
    • 단경간 인장형 사장교 시공방법
    • 公用型电缆桥式施工方法
    • KR1020130003868A
    • 2013-01-09
    • KR1020110065482
    • 2011-07-01
    • 지에스건설 주식회사
    • 노정휘이상훈박종헌이재형조재영김병탁김재범김도학
    • E01D11/04E01D21/00
    • E01D21/00E01D11/04
    • PURPOSE: A construction method of a tension type single span cable-stayed bridge is provided to cost-efficiently construct a cable-stayed bridge by changing compressive force applied to a girder into tensile force. CONSTITUTION: A construction method of a tension type single span cable-stayed bridge is as follows. First deck segments are installed to be directly supported to two towers(110) separated from each other using inclined cables. Multiple deck segments are consecutively installed on the first deck segments using additional inclined cables. When the deck segments to be connected to each other are adjacent to each other, jacks(200) are installed between the towers and the first deck segments. Key segments(400) are arranged between the deck segments to be connected to each other, and the installed jacks are powered to continuously connect the deck segments to each other. Tensile force is applied to the connected deck segments. [Reference numerals] (AA) First step; (BB) Second step; (CC) Third step; (DD) Fourth step
    • 目的:提供一种张力式单跨斜拉桥的施工方法,通过改变施加在大梁上的压力作为拉力来成本有效地构筑斜拉桥。 构成:张力式单跨斜拉桥的施工方法如下。 第一甲板段被安装成直接支撑到使用倾斜电缆彼此分离的两个塔架(110)。 使用额外的倾斜电缆将多个甲板段连续地安装在第一甲板段上。 当彼此连接的甲板段彼此相邻时,千斤顶(200)安装在塔架和第一甲板段之间。 钥匙段(400)布置在彼此连接的甲板段之间,并且安装的千斤顶被供电以将甲板段彼此连续地连接。 拉伸力施加到连接的甲板段。 (附图标记)(AA)第一步; (BB)第二步; (CC)第三步; (DD)第四步
    • 5. 发明授权
    • 힌지 연결부를 이용한 일부 타정식 사장교 및 그 시공 공법
    • 使用铰链连接部件的部分接地电缆桥架及其构造方法
    • KR101161644B1
    • 2012-07-03
    • KR1020100075929
    • 2010-08-06
    • 지에스건설 주식회사
    • 노정휘이상훈박종헌김도학
    • E01D11/04E01D21/00E01D19/14E01D19/16
    • 교축방향으로 소정 간격으로 이격되어 설치된 제1 주탑과 제2 주탑; 상기 제1 주탑을 중심으로 측경간쪽으로 설치된 제1 데크고정용 앵커리지와 상기 제2 주탑을 중심으로 측경간쪽으로 설치된 제2 데크고정용 앵커리지; 상기 제1 데크고정용 앵커리지와 제2 데크고정용 앵커리지에 각각 고정 설치된 최 외측 데크 세그먼트; 제1 주탑과 제2 주탑 사이의 주경간에 위치한 데크 세그먼트의 양 끝단으로부터 제1 주탑과 제2 주탑을 경유하여 최 외측 데크 세그먼트에 연결된 인장케이블; 상기 제 1,2 주탑에 설치된 압축케이블에 연결되어 상기 주경간 및 측경간에 설치되는 다수의 데크 세그먼트; 및 상기 압축케이블에 연결되어 주경간 및 측경간에 설치된 데크 세그먼트와 인장케이블에 연결된 최 외측 데크 세그먼트 사이의 힌지연결부;를 포함하여 주경간의 데크 세그먼트의 단면에 작용하는 최대 압축응력의 크기를 줄임으로써 주경간의 데크 세그먼트의 단면적을 줄일 수 있고, 이에 따라 경제적으로 시공될 수 있는 힌지연결부를 이용한 일부 타정식 사장교가 개시된다.
    • 9. 发明公开
    • 주경간 긴장수단을 이용한 일부 및 전부 타정식 사장교와 그 시공 방법
    • 部分和全面地使用主跨度预制装置的电缆桥式桥梁及其构造方法
    • KR1020120023907A
    • 2012-03-14
    • KR1020100086197
    • 2010-09-02
    • 지에스건설 주식회사오베아룹코리아(주)
    • 노정휘이상훈박종헌나임유후세인멧카터닐스제이짐싱
    • E01D11/04E01D21/00
    • E01D21/105E01D11/04E01D21/00
    • PURPOSE: A partially and fully earth-anchored cable-stayed bridge using a main span prestressing unit and a construction method thereof are provided to efficiently generate tensile stress in deck segments installed in a middle span and to easily control the tensile stress. CONSTITUTION: A construction method of a partially and fully earth-anchored cable-stayed bridge using a main span prestressing unit is as follows. First and second main towers(111,112) separated in a bridge axis direction are installed. A first anchorage(113) is installed toward the outer side span of the first tower. A second anchorage(114) is installed toward the outer side span of the second tower. Stay cables(300) are extended from the first and second anchorages to a main span through the first and second main towers. Tensile stress is applied to first main span deck segments(130) by connecting the stay cables to the main span deck segments. First and second anchoring devices(410,420) are installed in the main span deck segments. A tension member(430) is installed between the first and second anchoring devices. When the main span deck segments are connected to each other in a bridge axis direction, the tension member is tensed. Side span segments(170) are installed from the first and second main towers.
    • 目的:提供一种使用主跨度预应力单元及其施工方法的部分全覆土锚固斜拉桥,以有效地在安装在中间跨度的甲板段中产生拉伸应力,并易于控制拉伸应力。 构成:使用主跨度预应力单元的部分全埋式斜拉桥施工方法如下。 安装沿桥轴方向分离的第一和第二主塔(111,112)。 第一锚固件(113)朝向第一塔架的外侧跨距安装。 第二锚固件(114)朝向第二塔架的外侧跨距安装。 将电缆(300)从第一和第二锚地延伸到通过第一和第二主塔的主跨度。 通过将支撑电缆连接到主跨度板段上,对第一主跨度板段(130)施加拉伸应力。 第一和第二锚固装置(410,420)安装在主跨板甲板段中。 张紧构件(430)安装在第一和第二锚定装置之间。 当主跨度板段在桥轴方向上彼此连接时,张紧构件被拉紧。 从第一和第二主塔安装侧跨段(170)。
    • 10. 发明公开
    • 힌지 연결부를 이용한 일부 타정식 사장교 및 그 시공 공법
    • 使用铰链连接部件的部分接地电缆桥架及其构造方法
    • KR1020120013740A
    • 2012-02-15
    • KR1020100075929
    • 2010-08-06
    • 지에스건설 주식회사
    • 노정휘이상훈박종헌김도학
    • E01D11/04E01D21/00E01D19/14E01D19/16
    • E01D11/04E01D19/14E01D19/16E01D21/00
    • PURPOSE: A partially earth-anchored cable-stayed bridge using hinge parts and a construction method thereof are provided to effectively reduce maximum compressive stress of a deck segment installed on a main span and a side span. CONSTITUTION: A partially earth-anchored cable-stayed bridge using hinge parts comprises a first main tower, a second main tower, a first deck fixing anchorage(113), a second deck fixing anchorage(114), outermost deck segments(210,220), a tension cable(320), a plurality of deck segments(440,450), and a hinge part(H). The first main tower and the second tower are installed at an interval(L) from each other. The first and second deck fixing anchorages are respectively installed toward a side span around the first and second main towers. The outermost deck segments are installed between the first and second deck fixing anchorages and first and second inner piers(115,116).
    • 目的:提供一种使用铰链部件的部分地面锚固斜拉桥及其施工方法,以有效减少安装在主跨段和侧跨的甲板段的最大压应力。 构造:使用铰链部件的部分地锚式斜拉桥包括第一主塔,第二主塔,第一甲板固定锚固件(113),第二甲板固定锚固件(114),最外甲板段(210,220), 张紧绳索(320),多个甲板段(440,450)和铰链部分(H)。 第一主塔和第二塔彼此间隔(L)安装。 第一和第二甲板固定锚固件分别安装在第一和第二主塔周围的侧跨。 最外面的甲板段安装在第一和第二甲板固定锚固件与第一和第二内部墩(115,116)之间。