    • 2. 发明专利
    • Construction method of concrete slab and the concrete slab
    • 混凝土和混凝土板的施工方法
    • JP2011149222A
    • 2011-08-04
    • JP2010012136
    • 2010-01-22
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • SAITO TAKASHIKAMIMURA MASAYUKIHIGAKI AYUMISUGAYA KIMIHIKOKAWAI KANTAKIKUOKA YOJIRO
    • E04G21/02E04B5/43E04H9/02
    • PROBLEM TO BE SOLVED: To provide a construction method of a concrete slab which prevents the concrete slab from being cracked or broken caused by thermal shrinkage.
      SOLUTION: This construction method of the concrete slab comprises a process (a first placing process) for arranging a main reinforcement 52 and a distributing bar 54 in a concrete placing region partitioned by a form or the like and placing concrete (slab concrete), a next process (a contraction process) for contracting a slab block 40 formed by the hardened concrete placed in each division by temperature exceeding a predetermined value after temperature is lowered, a next process for tightening a high strength bolt 46 below a joint space 42 actually and welding a flange 32B of a bracket 32 and a flange 32B of a beam member 34 mutually to join the bracket 32 and the beam member 34 together, and a final process (a second placing process) for filling the joint space 42 between the slab blocks 40 being thermally shrank with a filler 44 to integrate the contracted slab blocks 40 together and construct the concrete slab 22.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种混凝土板的施工方法,其防止混凝土板由于热收缩而破裂或破裂。 解决方案:这种混凝土板的施工方法包括将主加强件52和分配杆54布置在由形状等分隔的混凝土浇筑区域中并将混凝土(板坯混凝土 ),用于在由温度降低后的温度超过规定值的状态下将通过配置在各分区中的硬化混凝土形成的板坯块40进行收缩的下一工序(收缩工序),在接合空间的下方紧固高强度螺栓46的下一工序 42实际上并且焊接支架32的凸缘32B和梁构件34的凸缘32B,以将支架32和梁构件34相互连接在一起,并且用于将接合空间42填充在第二放置过程 板坯块40用填料44热收缩,将收缩的板块40整合在一起并构成混凝土板22.版权所有(C)2011,JPO&INPIT
    • 3. 发明专利
    • Construction method of base isolating device pedestal, and base-isolated structure
    • 基础隔离装置的构造方法和基础隔离结构
    • JP2011140846A
    • 2011-07-21
    • JP2010003173
    • 2010-01-08
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • SUGAYA KIMIHIKOKAMIMURA MASAYUKIMATSUO HIROTSUGU
    • E04H9/02
    • PROBLEM TO BE SOLVED: To provide a construction method of a base isolating device pedestal allowing the reuse of a plate.
      SOLUTION: A form 24 for placing concrete is built up on a foundation part 34 of a structure, and a cap nut 26 serving as a connecting member is installed inside the form 24. The plate 28 is mounted to the cap nut 26 (Fig.2(A)). The plate 28 is formed into a ring shape from a steel plate, and a through-hole 38 is provided at the position of the cap nut 26. The plate 28 is horizontally installed on the top surface of the base isolating device pedestal 10 on which a base isolating device 40 is installed, and the upper face is to be the installation height of the base isolating device 40. Concrete 30 is then placed inside the form 24 up to the height flush with the upper face of the plate 28 (Fig.2(B)). After the concrete 30 is hardened, the plate 28 is removed from the concrete 30 (Fig.2(C)). Finally, mortar 32 is filled in an annular recess 42 formed after removing the plate 28, and the upper face is finished to be flat.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供允许板的再利用的基座隔离装置基座的构造方法。 解决方案:在结构的基础部件34上形成用于放置混凝土的模板24,并且用作连接构件的盖螺母26安装在模板24的内部。板28安装在盖螺母26上 (图2(A))。 板28由钢板形成为环状,并且在盖螺母26的位置设置通孔38.板28水平地安装在基座隔离装置基座10的顶面上, 安装基座隔离装置40,将上表面作为基座隔离装置40的安装高度。然后将混凝土30放置在形式24的内部,直到与板28(图1)的上表面齐平的高度。 图2(B))。 在混凝土30硬化之后,将板28从混凝土30中取出(图2(C))。 最后,砂浆32填充在去除板28之后形成的环形凹部42,并且上表面被平坦化。 版权所有(C)2011,JPO&INPIT
    • 5. 发明专利
    • Column base isolation device joint structure, and base isolation structure having the same
    • 柱基隔离装置接头结构及其相位隔离结构
    • JP2011052432A
    • 2011-03-17
    • JP2009201709
    • 2009-09-01
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • KAMIMURA MASAYUKISUGAYA KIMIHIKONOMURA ATSUSHIAOKI MINORU
    • E04H9/02E04B1/30E04B1/36
    • PROBLEM TO BE SOLVED: To increase vertical load transmission performance at the joint part between a base isolation device and a column. SOLUTION: A column 14 is supported by a base isolation device 12. At least the lower part of the column 14 is formed of a cylindrical body 40. A base plate 44 provided to the bottom end of the cylindrical body 40 is joined to the upper plate 18 of the base isolation device 12. In this state, the cylindrical body 40 is filled with concrete 42. Consequently, the concrete 42 flows into a through-hole 44A formed in the base plate 44, a thin sheet 46 which closes the through-hole 44A is pressed against the upper plate 18 under the filling pressure of the concrete 42 and the pressing force F due to the weight of the concrete 42 and the like, and the thin sheet 46 and the upper plate 18 are fitted to each other. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:增加基础隔离装置和塔之间的接合部分的垂直载荷传递性能。 柱14由基部隔离装置12支撑。柱14的至少下部由圆筒体40形成。设置在筒体40的底端的基板44被连接 在该状态下,圆柱体40填充有混凝土42.因此,混凝土42流入形成在基板44中的通孔44A中,薄板46 关闭在混凝土42的填充压力下的通孔44A被压靠在上板18上,以及由于混凝土42等的重量而产生的按压力F,并且薄板46和上板18被装配 对彼此。 版权所有(C)2011,JPO&INPIT
    • 10. 发明专利
    • Joint method of pre-cast concrete construction beam-column
    • 预制混凝土结构梁结合方法
    • JP2007092354A
    • 2007-04-12
    • JP2005281868
    • 2005-09-28
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • SUGAYA KIMIHIKOKAMIMURA MASAYUKIYASUOKA CHIHIROUCHIYAMA MASATOKEI TAKAHIROMIYAUCHI YASUMASA
    • E04B1/21E04B1/58
    • PROBLEM TO BE SOLVED: To provide a joint method of pre-cast concrete construction beam-column without being required for any introduction of prestress by binding, securing and straining, etc. to the joint of a PCa beam for carrying out erection to connect the PCa beam to a PCa column.
      SOLUTION: The column provides a first through-hole for each beam upper end main bar insertion and a second through-hole for each beam lower end main bar insertion respectively to a beam joint position in the horizontal direction, the beam is constituted so that the upper part of each stirrup without having the upper end main bar can be exposed, a haunch-shaped step section is provided to the lower bottom surface section in the end section of the connection with the column, a main bar through-hole perforating each beam lower end main bar is formed in the axial direction of the haunch-shaped step section, a main bar through-hole of the haunch-shaped step section is made to coincide with the second through-hole of the column to pass through the beam lower end main bar after the beam provides a shear force transfer means to the end face section of the connection with the column, the beam upper end main bars are arranged in the stirrups to pass through the first through-hole of the column, the first through-hole of the column, the main bar through-hole of the haunch-shaped step section and the second through-hole are filled with grouts, and a concrete is placed in the beam upper end main bar.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种预制混凝土结构梁柱的联合方法,而不需要通过将PCa梁的接头结合,固定和拉紧等引入预应力来进行安装 将PCa光束连接到PCa色谱柱。 解决方案:柱为每个梁上端主杆插入提供​​第一通孔,并为每个梁下端主杆插入分别在水平方向上的梁接头位置的第二通孔,构成梁 使得不具有上端主杆的每个箍筋的上部可以暴露,在与柱体的连接的端部部分中的下底部表面部分设置有一个竖直形的台阶部分,主杆通孔 每个梁下端主杆的穿孔形成在竖直状台阶部的轴向方向上,使该竖直形台阶部的主杆通孔与柱的第二通孔重合以通过 梁后的梁下端主杆在与柱的连接的端面部分提供剪切力传递装置,梁上端主杆布置在箍筋中以通过柱的第一通孔 n,柱的第一个通孔,臀形台阶部分的主杆通孔和第二通孔填充有浆料,混凝土放置在梁上端主杆中。 版权所有(C)2007,JPO&INPIT