热词
    • 4. 发明专利
    • Structure for preventing erosion of bank
    • 防止银行腐蚀的结构
    • JP2011163002A
    • 2011-08-25
    • JP2010027040
    • 2010-02-09
    • Ohbayashi Corp株式会社大林組
    • SOGO KIYOSHISUGIMOTO HIDEOHAMAI KUNIHIKO
    • E02B3/04
    • PROBLEM TO BE SOLVED: To effectively and economically prevent erosion of a back slope from being caused by an overflow and reduce maintenance of vegetation, while inhibiting a wetting line from rising due to infiltration.
      SOLUTION: In this structure 1 for preventing erosion of a bank, the back slope 2 of the bank 11 is partially exposed as an exposed area 5, and the vegetation 6 is applied thereto. A covered area 4 except the exposed area 5 is covered with a wood chip concrete board 3. The wood chip concrete board 3, which is obtained by prehardening wood chip concrete, functions as a water permeable covering layer which is made of a single layer of water permeable concrete, and expands the vegetation 6 of the exposed area 5 to the covered area 4 by easiness of fixing of plants to the wood chip concrete. The wood chip concrete board 3 is molded in a rectangular shape, and disposed on the back slope 2 in such a manner that the covered and exposed areas 4 and 5 are alternately arranged in a checkered pattern. Thus, the vegetation 6 of the exposed area 5 can be easily expanded to the covered area 4.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了有效和经济地防止由于溢出引起的后坡侵蚀,减少植被的维护,同时抑制润湿线由于渗透而上升。 解决方案:在用于防止堤的侵蚀的该结构1中,堤岸11的后坡2部分地暴露为暴露区域5,并且植被6被施加到其上。 除了暴露区域5之外的覆盖区域4被木屑混凝土板3覆盖。通过预硬化木屑混凝土获得的木屑混凝土板3用作透水性覆盖层,其由单层 透水混凝土,并且通过容易地将植物固定在木屑混凝土上,将暴露区域5的植被6扩展到覆盖区域4。 木屑混凝土板3成型为矩形,并且以覆盖和暴露区域4和5以方格图案交替布置的方式设置在后坡2上。 因此,暴露区域5的植被6可以容易地扩展到覆盖区域4.版权所有(C)2011,JPO&INPIT
    • 5. 发明专利
    • Greening structure using wood-chip concrete
    • 使用木屑混凝土的绿化结构
    • JP2011157714A
    • 2011-08-18
    • JP2010019810
    • 2010-01-29
    • Ohbayashi Corp株式会社大林組
    • SOGO KIYOSHISUGIMOTO HIDEOHAMAI KUNIHIKO
    • E02D17/20
    • PROBLEM TO BE SOLVED: To reduce a burden of maintenance management and minimize an influence on ecosystems.
      SOLUTION: In the greening structure 1 using wood-chip concrete, a surface of ground 2 as a greening object is partially formed as an exposed area 5 in which the surface of the ground 2 is exposed; the rest of the surface of the ground 2 is formed as a covered area 4 which is covered with a wood-chip concrete plate 3 as a covering layer; and the wood-chip concrete plate 3 is disposed on the surface of the ground 2 in such a manner that the covered area 4 and the exposed one 5 are alternately arranged in a checkered pattern. In a cross-sectional structure of the wood-chip concrete plate 3 made of a single layer of the wood-chip concrete, the wood-chip concrete plate 3 itself serves as the covering layer; and a vegetation base material is not superposed thereon. A range for applying planting is only the exposed area 5; and artificial planting is not applied to the covered area 4.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:减少维护管理的负担,尽量减少对生态系统的影响。 解决方案:在使用木屑混凝土的绿化结构1中,将作为绿色物体的地面2的表面部分地形成为露出地面2的表面的暴露区域5; 地面2的其余部分形成为被作为覆盖层的木屑混凝土板3覆盖的覆盖区域4; 并且将木片混凝土板3设置在地面2的表面上,使得覆盖区域4和暴露的5被交替地布置成格状图案。 在由单层木片混凝土制成的木屑混凝土板3的横截面结构中,木屑混凝土板3本身用作覆盖层; 并且植被基材不叠置在其上。 应用种植的范围只是曝光区域5; 并且人工种植不适用于覆盖区域4.版权所有(C)2011,JPO&INPIT
    • 6. 发明专利
    • Grating crib structure and method for constructing grating crib structure
    • 结构CRIB结构和构造结构CRIB结构的方法
    • JP2006283548A
    • 2006-10-19
    • JP2006057818
    • 2006-03-03
    • Ohbayashi CorpOsaka Bosui Constr Co Ltd株式会社大林組株式会社大阪防水建設社
    • HAMAI KUNIHIKOMORITA KOJIYAMADA HIROSHIOSADA NORIOOMIYA SHOHEI
    • E02D17/20
    • PROBLEM TO BE SOLVED: To surely suppress deformation of the ground by applying a prestress to a slope of a natural ground.
      SOLUTION: A grating crib structure comprises: a grating crib 2 installed on the slope 26 of the natural ground 25; a fixing means 10 to be driven into the natural ground 25 for fixing the crossing point in the grating crib 2; and a pressing means 14 interposed between the crib 2 and the slope 26 of the ground 25 for pressing the crib 2 in the direction of separating from the ground 25. The pressing means 14 comprises: a bag body 15 interposed between the crib 2 and the ground 25 and capable of being expanded; and a filler 20 filled in the bag body 25 with pressure for pressing the crib 2 via the bag body 15. The crib 2 is elastically deformed and bent by expanding deformation of the bag body 25 to apply a prestress to the slope 26 of the ground 25 by the reaction force of the crib 2.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:通过对自然地面的斜坡施加预应力来确保抑制地面的变形。 解决方案:光栅婴儿床结构包括:安装在自然地面25的斜坡26上的光栅婴儿床2; 固定装置10被驱动到自然地面25中,用于将交叉点固定在格栅2中; 以及插入在婴儿床2和地面25的斜坡26之间的按压装置14,用于沿着与地面25分离的方向按压婴儿床2.加压装置14包括:袋体15,其插入在婴儿床2和 地面25,能够扩大; 以及填充物20,其具有经由袋体15挤压婴儿床2的压力。婴儿床2通过膨胀袋体25的变形而弹性变形并弯曲,以将预应力施加到地面的斜坡26 25由婴儿床的反应力。2.版权所有(C)2007,JPO&INPIT
    • 7. 发明专利
    • Vertical banking construction method and retaining wall used for the construction method
    • JP2004150165A
    • 2004-05-27
    • JP2002317685
    • 2002-10-31
    • Ohbayashi Corp株式会社大林組
    • ICHIKAWA KAZUOHAMAI KUNIHIKOHIGASAYAMA TETSUMI
    • E02D17/18E02D29/02
    • PROBLEM TO BE SOLVED: To prevent falling-in of a retaining wall against initial earth pressure of banking by providing self-stability by forming a necessary minimum range between a retaining wall back face and a banking layer as the banking of stably treating cement.
      SOLUTION: In this construction method, the vertical retaining wall is constructed on a foundation 4; the stable banking 20 is constructed on the retaining wall back face; a reinforcing material F is buried in the banking 20; the tip is connected to the retaining wall back face; the retaining wall is vertically adjusted by an adjustment of an adjusting means 10 arranged in the reinforcing material F in clearance formed between the banking and the retaining wall back face after curing the banking 20; and a space between the banking 20 and the retaining wall is backfilled by an infilling material 21 composed of stable treated earth. The retaining wall is composed of a master pile 5 erected on the foundation 4 and composed of H shape steel successively connected in the vertical direction according to the height of the banking 20 and a wall surface board 6 supported in an erecting state by inserting both sides between the master piles 5 and having the center curvedly swollen in an arch shape toward the banking 20 side. The adjacent wall surface boards 6 are held in a self-sustaining state via the master pile 5 by fastening the retaining wall connecting end of the reinforcing materrial F to a back face of the master pile 5.
      COPYRIGHT: (C)2004,JPO
    • 8. 发明专利
    • Liquefaction preventing method and system
    • 液化预防方法与系统
    • JP2014012980A
    • 2014-01-23
    • JP2012250431
    • 2012-11-14
    • Ohbayashi Corp株式会社大林組
    • OKAMOTO TOSHIHARUYAMADA HIROSHIHAMAI KUNIHIKOITO KOJIYAMADA YUKI
    • E02D3/10E02D27/34
    • PROBLEM TO BE SOLVED: To keep the degree of saturation lower over a long period when lowering the degree of saturation to prevent liquefaction.SOLUTION: A liquefaction preventing system 1 of the present invention includes water shielding walls 3, 3 arranged in a ground 2, a mixing tank 4 for producing treatment liquid and storing the produced treatment liquid, a filling well 6 for filling the treatment liquid supplied from the mixing tank 4 into a treatment region 5 in the ground 2 held between the water shielding walls 3, 3, and a pumping well 7 using a vacuum pump 8 for pumping underground water from the treatment region 5. The mixing tank 4 can agitate and mix the underground water in the state that minute hollow bodies are added to existing underground water pumped via the pumping well 7 from the treatment region 5 to produce and store the treatment liquid, and also can supply the treatment liquid to the filling well 6. The minute hollow bodies are formed as expansive/contractive hollow bodies in which air and other gas are enclosed and which are shaped spherical with resin films or resin shells, and their outer diameters are 50 μm or smaller.
    • 要解决的问题:当降低饱和度以防止液化时,在长时间内保持饱和度降低。解决方案:本发明的液化防止系统1包括布置在地面2中的防水壁3,3, 用于生产处理液并储存生产的处理液的混合槽4,用于将从混合槽4供应的处理液填充到保持在防水壁3,3之间的地面2中的处理区域5的填充井6和 泵送井7使用真空泵8从处理区域5抽取地下水。混合罐4可以在将微小空心体添加到通过泵送井7泵送的现有地下水的状态下搅拌和混合地下水, 处理区域5以产生和存储处理液体,并且还可以将处理液体供应到填充井6.微小空心体形成为膨胀/收缩的 空气和其他气体被封闭并且用树脂膜或树脂壳形成球形的二氧化碳体,其外径为50μm以下。
    • 9. 发明专利
    • Liquefaction preventing system and method
    • 液体预防系统和方法
    • JP2014012979A
    • 2014-01-23
    • JP2012250314
    • 2012-11-14
    • Ohbayashi Corp株式会社大林組
    • OKAMOTO TOSHIHARUYAMADA HIROSHIHAMAI KUNIHIKOITO KOJIYAMADA YUKI
    • E02D3/10E02D27/34
    • PROBLEM TO BE SOLVED: To reliably and equally supply microbubbles even right under an existing structure such as an embankment.SOLUTION: In a liquefaction preventing system 1, water shielding walls 4, 4 are arranged in a ground 2 so that a ground range expanding under an embankment 3 constructed on the ground surface of the ground 2 is held at its lateral side therebetween, curved holes 6 are formed in multiple stages in a treatment region 5 held between the water shielding walls so that they pass through the lower side of the embankment 3 and their ends are opened to two ground surface positions across the embankment, porous pipes 7 are arranged in the curved holes, respectively, and a bubble generator 8 is connected at its output side to one end of each porous pipe 7.
    • 要解决的问题:即使在现有的结构如路堤下也可靠地均匀地供应微泡。解决方案:在液化防止系统1中,将防水壁4,4设置在地面2中,使得地面范围在下 在地面2的地面上构造的路堤3被保持在其侧面,弯曲孔6在保持在水屏蔽壁之间的处理区域5中以多个阶段形成,使得它们穿过路堤的下侧 3,并且它们的端部穿过路堤被打开到两个地面位置,多孔管7分别布置在弯曲孔中,并且气泡发生器8在其输出侧连接到每个多孔管7的一端。
    • 10. 发明专利
    • Natural ground reinforcing soil structure and natural ground reinforcing soil construction method
    • 自然地基强化土体结构和自然地基强化土体施工方法
    • JP2009079369A
    • 2009-04-16
    • JP2007247709
    • 2007-09-25
    • Ohbayashi CorpOsaka Bosui Constr Co Ltd株式会社大林組株式会社大阪防水建設社
    • HAMAI KUNIHIKOMORITA KOJIMORI TAKUOYAMANOCHI TOMOYUKI
    • E02D5/80E02D5/44E02D17/18E02D17/20
    • PROBLEM TO BE SOLVED: To stabilize a slope having unstable soil lumps from small scale to medium scale.
      SOLUTION: This natural ground reinforcing soil structure constructed in the ground 2 of the natural ground to stabilize the slope of the natural ground comprises a hole 4 bored in the ground 2; a reinforcing member 10 inserted in the hole 4; a plurality of nodes 14 provided at an anchor part 13 of the reinforcing member 10 to the ground 2; transmission members 20 provided between the outer peripheral surface of the anchor part 13 and the inner surface of the hole 4 and divided into at least two parts in the circumferential direction of the anchor part 13, each of the transmission member 20 being provided independently of the reinforcing member 10 to transmit load from the reinforcing member 10 to the ground 2; and an anchor implement 30 anchoring the head part 11 of the reinforcing member 10 to the surface of the ground 2 in a state of tensile force being applied to the reinforcing member 10.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题是:将土体块不稳定的坡度从小规模稳定到中等规模。 解决方案:在自然地面的地面2构造的这种自然地面加固土壤结构,以稳定天然地面的坡度,包括在地面2上钻孔4; 插入孔4中的加强构件10; 多个节点14设置在加强构件10的锚固部分13处于地面2; 传动构件20设置在锚定部13的外周面与孔4的内表面之间,并且在锚定部13的圆周方向上分成至少两部分,每个传动构件20独立于 加强构件10将载荷从加强构件10传递到地面2; 以及将加强构件10的头部11以施加到加强构件10的张力的状态锚定到地面2的表面的锚固器具30.(C)2009,JPO&INPIT