会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Bath boiler provided with shower
    • 浴室提供淋浴
    • JPS6136653A
    • 1986-02-21
    • JP15950884
    • 1984-07-28
    • Toshio Takagi
    • TAKAGI TOSHIO
    • F24H1/00F24H9/00
    • F24H1/0081
    • PURPOSE:To make it possible to utilize a shower even when the bathtub is not filled with water by providing an intermediate chamber between the bathtub and the bath boiler, which are communicated with each other by means of a pair of upper and lower communication cylinders, communicating a heat exchanger with the intermediate chamber by means of upper and lower communicating holes, and providing opening and closing valves within both communicating holes. CONSTITUTION:When a feed water plug 18 is opened by turning a changeover valve 26 to the side of a feed water tube 17 by means of a handle 31, water expands actuating means 15 to put respective opening and closing valves 11 and 12 into closing positions to interrupt communication cylinders 8 and 9. When the water pressure within the actuating means 15 assumes more than a predetermined value, a steady pressure valve 23 is pushed open, water flows into the lower part of the intermediate chamber 5, thereafter flowing into a heat exchanger 4 through a communicating hole 7 and being heated and flowing into the upper part of the intermediate chamber 5, and being discharged from a shower head 29 via a communicating tube 27 for the shower. In order to stop the using state, the actuating means 15 is communicated with a water exhaust tube 24. At this time, the pressure of water is lowered, water shrinks by the reinstating force, and communicating cylinders 8 and 9 are opened. In this state, when the bathtub is filled with water and a burner 3 is fired, the bathtub water is warmed.
    • 目的:为了通过在浴缸和浴缸之间设置中间室,通过一对上下连通筒相互连通,即使在浴缸未充满水的情况下也可以使用淋浴, 通过上下连通孔将热交换器与中间室连通,并在两个连通孔内设置开闭阀。 构成:当通过把手31将切换阀26转动到给水管17的侧面来打开给水塞18时,水膨胀致动装置15,使相应的开闭阀11和12成为关闭位置 以中断通信气缸8和9.当致动装置15内的水压超过预定值时,稳压阀23被推开,水流入中间室5的下部,然后流入热量 交换器4通过连通孔7加热并流入中间室5的上部,并经由用于淋浴的连通管27从淋浴喷头29排出。 为了停止使用状态,致动装置15与排水管24连通。此时,水的压力下降,水由于恢复力而收缩,连通气缸8,9打开。 在这种状态下,当浴缸充满水并且燃烧器3被点燃时,浴缸水被加热。
    • 5. 发明专利
    • Bottom reinforcing structure in main body made of paper
    • 底部加强纸张主体的结构
    • JP2012076806A
    • 2012-04-19
    • JP2010224657
    • 2010-10-04
    • Yasuhiko MikiToshio Takagi靖彦 三木敏夫 高木
    • TAKAGI TOSHIOMIKI YASUHIKO
    • B65D5/44B65D19/20
    • PROBLEM TO BE SOLVED: To provide a bottom reinforcing structure of a body made of paper, leading to ecology, recycling, etc., maintaining the merits of lightweight, space saving, a low price, a low transport cost, etc., and more improving the strength of the bottom.SOLUTION: The body made of paper 11 has a plurality of legs 21 on the outer face of the bottom, and between the respective legs 21, there are inverted concave spaces 14 for insertion of the fork of a fork lift. The leg 21 is composed of an outer member 22 and an inner member 26 made of cardboard. An adhesion layer 25 is formed on the inner face of the outer member 22 formed of a hollow body. The inner member 26 is formed of a polyhedron having three or more vertical walls. One or more inner members 26 are arranged in one outer member 22. The two vertical walls of one inner member 26 are bonded to opposite inner side faces of the outer member 22 having the adhesion layer 25. There are a plurality of inner spaces 29 in one outer member 22.
    • 要解决的问题:提供一种由纸制成的本体的底部加强结构,导致生态,回收等,保持轻便,节省空间,低价格,低运输成本等优点。 ,更加提高底部的实力。 解决方案:由纸11制成的本体在底面的外表面上具有多个支脚21,并且在相应的支脚21之间有倒置的凹入空间14,用于插入叉车的叉子。 腿21由外部构件22和由纸板制成的内部构件26组成。 在由中空体形成的外部构件22的内表面上形成粘合层25。 内部构件26由具有三个或更多个垂直壁的多面体形成。 一个或多个内部构件26布置在一个外部构件22中。一个内部构件26的两个垂直壁结合到具有粘合层25的外部构件22的相对的内侧面。在内部空间29中有多个内部空间29 一个外部成员22.版权所有(C)2012,JPO&INPIT
    • 6. 发明专利
    • Shower device
    • 淋浴设备
    • JPS59134449A
    • 1984-08-02
    • JP899683
    • 1983-01-21
    • Toshio Takagi
    • TAKAGI TOSHIO
    • F24H1/00A47K3/28F24D19/10F24H9/00
    • F24D19/1051
    • PURPOSE:To enable to reduce the pressure of water flowing into a bath heater without using any pressure-reducing valve even when the pressure of feed water supplied from a city water system is excessively high and to supply hot water heated by the bath heater to a shower head by again raising the pressure thereof by a pump, by connecting a rotor of a water pressure motor and a rotor of a hot water feeding pump to each other. CONSTITUTION:A water-supplying hose 48 and a shower hose 62 are connected respectively to a water inlet 47 and a hot water outlet 61 of a water pressure converter C, and hoses 33, 34 connected to covers B, B' covering an upper ejecting port and a lower sucking-in port of a bathtub 1 communicated to upper and lower parts of the bath heater 2 are connected respectively to a hot water inlet 35 and a water outlet 36 of the pressure converter C. The water pressure motor M for the converter C is rotated by a water pressure to drive a water-feeding pump P, thereby sucking in water into the bath heater 2, and heated water is fed out to the shower head 63, so that water lowered in pressure is supplied into the bath heater 2 by driving the rotor 22 of the motor M. In addition, since hot water heated by the bath heater 2 is fed out to the shower head 63 by the hot water feeding pump P, the pressure of water lowered in pressure by passing through the motor M is raised by the action of the pump P, so that hot water is ejected from the shower head 63 at a high pressure.
    • 目的:即使当从城市供水系统供给的供水压力过高,并且将由浴加热器加热的热水提供给一个或多个的加热器时,即使在不使用任何减压阀的情况下也能够降低流入浴缸加热器的水的压力 通过将水压马达的转子和热水供给泵的转子彼此连接,再次通过泵升高其压力。 构成:供水软管48和淋浴软管62分别连接到水压转换器C的进水口47和热水出口61,以及连接到盖B,B'的软管33,34,覆盖上部喷射 端口和连通到浴加热器2的上部和下部的浴缸1的下吸入口分别连接到压力转换器C的热水入口35和出水口36.用于 转换器C通过水压旋转以驱动给水泵P,从而将水吸入浴加热器2中,并且将加热的水送到淋浴头63,使得降低压力的水被供应到浴中 加热器2通过驱动马达M的转子22进行。另外,由于由加热器2加热的热水通过热水供给泵P被送出到喷头63,所以通过通过的压力降低了压力 马达M通过泵P的作用升高, 使得热水在高压下从喷头63喷出。
    • 7. 发明专利
    • Shower device
    • 淋浴设备
    • JPS59134448A
    • 1984-08-02
    • JP899583
    • 1983-01-21
    • Toshio Takagi
    • TAKAGI TOSHIO
    • A47K3/28F24D19/10F24H1/00F24H9/00
    • F24D19/1051F24H1/0081
    • PURPOSE:To enable to supply water normally at a constant pressure irrespectively of the water pressure at a water supplying source, by a method wherein the pressure of water fed into a bath heater by operating a diaphragm is lowered, while the water heated by the bath heater is supplied to a shower head by raising the pressure thereof by a pumping action of a diaphragm. CONSTITUTION:A water-supplying hose 75 and a shower hose 77 are connected respectively to a water inlet 47 and a hot water outlet 74 of a water pressure converter C, and hoses 33, 34 connected to covers B, B' convering upper and lower ejecting ports of a bathtub 1 communicated to upper and lower parts of the bath heater 2 are connected to a hot water inlet 35 and a water outlet 36 of the pressure converter C. The diaphragm 42 in the converter C is operated by a water pressure to provide a pumping action, by which water is sucked into the bath heater 2, and heated water is fed to the shower head 78, while water is supplied into the bath heater 2 by a sucking-in action of the diaphragm 42. Accordingly, even when the pressure of water fed into a chamber 43 on the upper side of the diaphragm 42 through a water-supplying cock 76 is high, the pressure in the bath heater 76 is prevented from being raised to puncture a heat exchanger. In addition, even when the pressure in the bath heater 2 is low, pressure ejected from the shower head 78 can be provided with a sufficient pressure.
    • 目的:为了能够在恒定压力下正常供水,而与供水源上的水压无关,通过一种方法,其中通过操作隔膜进入浴加热器的水的压力降低,同时由浴加热的水 通过振膜的泵送作用使加热器的压力提高到喷淋头。 构成:供水软管75和淋浴软管77分别连接到水压转换器C的进水口47和热水出口74,以及连接到上下折叠的盖B,B'的软管33,34 连通到浴加热器2的上部和下部的浴缸1的排出口连接到压力转换器C的热水入口35和出水口36.转换器C中的隔膜42通过水压操作 提供抽吸作用,水被吸入到浴加热器2中,并且加热的水被供给到淋浴头78,同时通过隔膜42的吸入作用将水供应到浴加热器2中。因此,甚至 当通过供水旋塞76进入隔膜42的上侧的室43中的水的压力高时,防止了浴加热器76中的压力升高以刺穿热交换器。 此外,即使在浴加热器2中的压力低的情况下,也能够提供从喷淋头78排出的压力。
    • 10. 发明授权
    • Method of preparing estimate for sheet metal working
    • 准备钣金加工估算的方法
    • US07058465B2
    • 2006-06-06
    • US10450525
    • 2001-12-25
    • Ryuharu EmoriToshio TakagiKoichi Tsuchida
    • Ryuharu EmoriToshio TakagiKoichi Tsuchida
    • G06F19/00
    • G06Q10/087G05B19/40937G05B2219/32032G05B2219/32099G06Q10/06G06Q10/0875G06Q30/0283Y02P90/265
    • A method is provided for preparing an estimate for sheet metal working. Data of bending lines and data of an associated processing time for the bending lines is stored. Data of holes and data of an associated processing time for the holes is stored. A three-dimensional view and a development drawing which realizes the three-dimensional view are prepared based on an orthographic drawing. A bending line and a hole on a product are detected based on at least one of data of the three-dimensional view and data of the development drawing. A processing time of the specified bending line is calculated based on the associated data of the bending lines. A processing time of the specified hole on the product is calculated based on the associated data of the holes. The processing time of the bending line and the processing time of the hole are stored in a processing time memory. A total processing time necessary to process the product is calculated by adding up the processing times stored in the processing time memory. The total processing time is converted to a cost of processing the product in consideration of a cost per processing time.
    • 提供了一种用于准备钣金加工的估计的方法。 存储弯曲线的数据和弯曲线的相关处理时间的数据。 存储孔的数据和孔的相关处理时间的数据。 基于正交绘图准备实现三维视图的三维视图和开发图。 基于三维视图的数据和开发图的数据中的至少一个来检测产品上的弯曲线和孔。 基于弯曲线的相关数据计算指定弯曲线的处理时间。 基于孔的相关数据计算产品上指定孔的处理时间。 弯曲线的​​处理时间和孔的处理时间被存储在处理时间存储器中。 通过将存储在处理时间存储器中的处理次数相加来计算处理产品所需的总处理时间。 考虑到每个处理时间的成本,总处理时间被转换成处理产品的成本。