会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • METHOD AND CENTERING FOR THE CONSTRUCTION OF REINFORCED CONCRETE BRIDGES
    • 用于建筑混凝土桥梁的方法和中心
    • WO1981002032A1
    • 1981-07-23
    • PCT/DE1981000015
    • 1981-01-17
    • STEIDLE GMBH & CO ESCHWEER RSTEIDLE SAILER M
    • STEIDLE GMBH & CO E
    • E01D21/04
    • E01D21/10E01D2101/28
    • For the construction step by step of a reinforced concrete bridge, the portions of the bridge are reinforced and concreted on site by using a shuttering (17) fixed to a centering (16). After the setting of the concrete and withdrawal of auxiliary supports (30) (in the case where the portion in question does not rest on a main pile (12)), the centering is lowered with the casing on rails (32) of a portion and lifted at the level of the lower part of the bridge. Then a new deshuttering is made. In the case of settling grounds, the rear end of the centering may whereby be anchored at the end of the previously completed portion. In order to allow the centering to move beyond the pile, respectively beyond the auxiliary supports, arrangements are made so as to allow to move all the portions of the centering or of the casing which are located in the section of the piles or the support, beyond that section. To this effect, the transverse beams (41, 42) are displaceably arranged on longitudinal beams (48) and the shuttering plates on the lower portion may be folded back downwardly. This folding back is effected progressively on the length of the scaffolding.
    • 对于钢筋混凝土桥梁的逐步施工,桥梁的部分通过使用固定到定心(16)的挡板(17)在现场进行加固和混凝土。 在混凝土和辅助支撑件(30)的设置(在所述部分不在主桩(12)上的情况下)之后,定中心将壳体放置在一部分的轨道(32)上 并在桥下部的水平抬起。 然后进行一个新的deshuttering。 在沉降场地的情况下,定心器的后端可以锚定在先前完成的部分的末端。 为了允许定心移动超过桩,分别超出辅助支撑件,进行布置以允许移动位于桩或支撑件的部分中的定心或套管的所有部分, 超出了那一节。 为此,横梁(41,42)可移动地布置在纵梁(48)上,下部的挡板可以向下折叠。 这种折叠在脚手架的长度上逐渐受到影响。