会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Mailer for computer disks
    • 用于计算机磁盘的邮件程序
    • US5318222A
    • 1994-06-07
    • US11951
    • 1993-02-01
    • Michael Bartlett
    • Michael Bartlett
    • B42F7/02G11B33/04B65D27/08
    • G11B33/0422B42F7/02G11B33/0494
    • A mailer for disks. The mailer has first and second pockets for receiving disks, each pocket formed of front and back rectangular panel members joined at at least one pair of corresponding edges and unconnected on at least one pair of corresponding edges. The pockets are foldably attached by a spine at an edge of each of said pockets. There is a sealing member for adhering the first pocket to the second pocket to maintain the mailer in a closed conformation. At any pocket edge not retaining the received disk by the joined edges, the spine, or the sealing member, the disk is retained in the pocket by retaining means.
    • 磁盘邮件程序。 邮寄器具有用于接收盘的第一和第二袋,每个袋由形成在至少一对相应边缘上并且在至少一对相应边缘上未连接的前后矩形板构件形成。 口袋通过脊柱在每个所述口袋的边缘处可折叠地附接。 存在用于将第一袋粘附到第二袋以将邮件夹保持封闭构造的密封构件。 在通过接合的边缘,脊柱或密封构件不保持接收的盘的任何口袋边缘处,盘通过保持装置保持在口袋中。
    • 9. 发明授权
    • Systems and methods for power generation with carbon dioxide isolation
    • 用二氧化碳隔离发电的系统和方法
    • US07739864B2
    • 2010-06-22
    • US11557250
    • 2006-11-07
    • Matthias FinkenrathMichael Bartlett
    • Matthias FinkenrathMichael Bartlett
    • F02C7/08F02G1/00F02G3/00
    • F02C3/02F01K23/10F02C3/10F02C6/18Y02E20/326
    • A power generation system includes first and second turbines. The first turbine including a low-pressure compressor (14) and a high-pressure compressor (16). A combustion chamber (22) combusts compressed oxidant and a fuel stream to generate a hot flue gas (31). The first turbine further includes a high-pressure expander (20) for receiving the flue gas and generating a CO2 rich exhaust gas. A low-pressure expander (22) generates a first final exhaust (52) and electrical energy. A CO2 separation system receives exhaust gas (38) and provides a CO2 lean gas fed to low-pressure expander (22). The second turbine including a compressor section (64) configured to discharge a recycle stream (71) from a high pressure compressor (70) to a second combustion chamber (72) and supply a split stream (84) from a low-pressure compressor (68) to high pressure compressor (16) of the first turbine.
    • 发电系统包括第一和第二涡轮机。 第一涡轮机包括低压压缩机(14)和高压压缩机(16)。 燃烧室(22)燃烧压缩的氧化剂和燃料流以产生热的烟道气(31)。 第一涡轮进一步包括用于接收烟道气并产生富二氧化碳排气的高压膨胀器(20)。 低压膨胀器(22)产生第一最终排气(52)和电能。 CO 2分离系统接收废气(38)并提供供给低压膨胀器(22)的贫二氧化碳气体。 第二涡轮机包括压缩机部分(64),其构造成将再循环流(71)从高压压缩机(70)排放到第二燃烧室(72)并从低压压缩机(84)供应分流(84) 68)连接到第一涡轮机的高压压缩机(16)。