会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Method of replacing aerial line between electric poles and replacement tool used therein
    • 替代电极与替代工具之间的空气线的方法
    • JP2012228001A
    • 2012-11-15
    • JP2011091257
    • 2011-04-15
    • Kansai Electric Power Co Inc:TheKanden Engineering:Kk株式会社かんでんエンジニアリング関西電力株式会社
    • MIZOGUCHI KEIZOYUKAWA AKIHIROYAMAMURO KINYATAKEDA HIDEKISUMI TADAHIKO
    • H02G1/02
    • PROBLEM TO BE SOLVED: To provide a method of replacing an aerial line between electric poles, without an old line or a new line getting hung down between the electric poles when replacing to a new line, capable of performing a replacement work without any obstacle even at a place crossing over a heavy traffic road or over a private land, furthermore with excellent safety and workability, and to provide a replacement tool enabling the method.SOLUTION: A cylindrical cover member 10 made of plastic is sequentially mounted on an old line 16 to be replaced from a pole 24 on a sending side toward a pole 26 on a receiving side. As a replacement from an old line 16 to a new line 30 is done through the inside of the cover member 10, the new line 30 can be newly laid at the same position as the old line 16, without getting an aerial line or the like hung down between the electric poles 24 and 26. Furthermore, the cover member 10 is made of light plastic, which makes it possible to lift it rather easily up to the electric pole 24 so as to contribute to the safety of a replacement work.
    • 要解决的问题:提供一种替换电线之间的架空电线的方法,在更换新线路之前,不需要在电线杆之间旧线或新线路挂起,能够进行更换工作而无需更换 任何障碍物,即使在交通繁忙的交通道路或私人土地上的地方,此外还具有良好的安全性和可操作性,并提供使该方法更换的工具。 解决方案:由塑料制成的圆柱形盖构件10依次安装在旧线16上,以从发送侧的极24朝向接收侧的极26更换。 作为从原线16到新线30的替代,通过盖构件10的内部完成,新线30可以重新铺设在与旧线16相同的位置,而不会得到架空线等 悬挂在电杆24和26之间。此外,盖构件10由轻塑料制成,这使得可以更容易地将其提升到电杆24,从而有助于更换作业的安全性。 版权所有(C)2013,JPO&INPIT
    • 3. 发明专利
    • Reinforcing construction method for piling steel tower for power-transmission line
    • 用于电力传输线的钢塔的加固结构方法
    • JP2011214374A
    • 2011-10-27
    • JP2010086064
    • 2010-04-02
    • Kanden Engineering:KkKansai Electric Power Co Inc:The株式会社かんでんエンジニアリング関西電力株式会社
    • NAKASUJI HIROKAZUKISHIMOTO YASUMASAMORIMURA YUKIOICHIOKA YOICHITAKEUCHI NOBUOURASAKI AKIRA
    • E04H12/10
    • PROBLEM TO BE SOLVED: To prevent increase of ground area to be needed and to solve shortage of strength of a steel tower for a power-transmission line from the lower part to the upper part of the tower after piling against received power by wind pressure.SOLUTION: A reinforcing construction method for piling steel tower for power-transmission line includes: a column building step in which a plurality of column components are connected in the vertical direction so that a first reinforcement column 22 and a second reinforcement column 23 arranged in a direction crossing the direction of extending power-transmission line 102 are built in a quadrangle area formed by adjoining main columns 12 which are connected; a connection step between reinforcement columns in which both the reinforcement columns 22, 23 are connected to a plurality of parts in a height direction; a connection step between the first reinforcement column and the main column in which two main columns 12 disposed near the first reinforcement column 22 and that column 22 are connected to a plurality of parts in a height direction by a second connecting member 28; and a connection step between the second reinforcement column and the main column in which two main columns 12 disposed near the second reinforcement column 23 and that column 23 are connected to a plurality of parts in a height direction by a third connecting member 30.
    • 要解决的问题:为了防止由风压力对接收的动力进行打桩,从塔的下部到塔的上部,防止需要的地面面积的增加,并且解决用于输电线路的钢塔的强度不足。 解决方案:一种用于输送输送线的钢塔的加固施工方法,其特征在于,包括:柱构成工序,其中,多个塔构件沿垂直方向连接,使第一加强柱22和第二加强柱23配置成 跨越延伸输电线路102的方向的方向被构建在由连接的相邻主柱12形成的四边形区域中; 加强柱之间的连接步骤,其中两个加强柱22,23在高度方向上连接到多个部分; 第一加强柱和主列之间的连接步骤,其中设置在第一加强柱22附近的两个主柱12和第二连接构件28在高度方向上与多个部分连接; 以及第二加强柱和主柱之间的连接步骤,其中设置在第二加强柱23附近的两个主柱12和第二柱体23通过第三连接构件30在高度方向上连接到多个部件。
    • 6. 发明专利
    • Method of partially repairing main pole member of existing hollow steel pipe tower
    • 部分修复现有中空钢管塔主体部件的方法
    • JP2009215801A
    • 2009-09-24
    • JP2008061406
    • 2008-03-11
    • Kanden Engineering:KkKansai Electric Power Co Inc:TheSakai Iron Works Co Ltd株式会社かんでんエンジニアリング株式会社酒井鉄工所関西電力株式会社
    • KIUCHI OSAMUNAKAMURA SATOSHINAGATA TAKAOTANAKA EIJITAKEUCHI NOBUOURASAKI AKIRA
    • E04G23/02E04H12/10
    • PROBLEM TO BE SOLVED: To carry out the repairing work of a main pole member of an existing steel tower safely and at favorable good workability, when repair becomes necessary due to the corrosion or the like of the main pole member.
      SOLUTION: According to a method of partially repairing the main pole member 1 of the existing hollow steel pipe tower, in order to partially repair a minimum area inclusive of a damaged portion 11 where repair is required due to the corrosion or the like, reaction support pieces 12, 13 are secured to upper and lower locations of the damaged portion 11 of the main pole member 1 by welding, and upper and lower band fittings 14, 15 of a jig 18 are abutted on the upper and lower support pieces 12, 13 in a manner of sandwiching the damaged portion 11. Then, part of bolts of a web member and bolts of the main pole member 1 are loosened, jacks are raised, and the main pole member 1 near the damaged portion is partially cut away. Furthermore, a new member 25 having flanges 19, 26 and ribs 20 secured to upper and lower edges thereof by welding the flanges 19, 26, and the ribs 20 in a site is inserted into a cut-away portion, the bolts are inserted into the flanges 19, 26, and the jacks are lowered down.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了安全地进行现有钢塔的主极构件的修理工作,具有良好的加工性,当由于主极构件的腐蚀等而需要进行修理时。 解决方案:根据现有中空钢管塔的主极构件1的部分修复的方法,为了部分地修复包括由于腐蚀等而需要修理的损坏部分11的最小区域 反作用支撑件12,13通过焊接固定在主极构件1的损坏部分11的上部和下部位置,夹具18的上部和下部带配件14,15抵靠在上部和下部支撑件上 然后,腹板部件的螺栓部分和主极部件1的螺栓的一部分被松动,千斤顶升高,并且损坏部分附近的主极部件1被部分地切断 远。 此外,通过将凸缘19,26和肋20焊接在现场的具有凸缘19,26和固定到其上边缘的肋20的新构件25插入到切除部分中,将螺栓插入 凸缘19,26和千斤顶被下降。 版权所有(C)2009,JPO&INPIT
    • 8. 发明专利
    • Method and device for searching discharge source
    • 用于搜索放电源的方法和装置
    • JP2005098800A
    • 2005-04-14
    • JP2003331907
    • 2003-09-24
    • Kanden Engineering:KkKansai Electric Power Co Inc:The株式会社かんでんエンジニアリング関西電力株式会社
    • KAWASAKI MAKOTOMIYAMOTO RYOJI
    • G01R31/08
    • PROBLEM TO BE SOLVED: To provide a method for searching discharge source capable of more correctly specifying the discharge source, to provide and a device for the same.
      SOLUTION: The discharge area A, including the discharge source P, is specified based on the time difference of the discharge signal (electromagnetic wave), the kind of the discharge source P is determined from the frequency characteristics of the electromagnetic wave emitted from the discharge source P, and also the position of the discharge source P in the discharge region A is specified from the result of the determination. The discharged quantity of electric charge Q is calculated, by recognizing the distance decay characteristics of the discharge signal, and whether the discharge source P is abnormal is recognized, by comparing the discharged quantity of electric charge Q with the allowable discharged quantity Q' of electric charge.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供一种能够更正确地指定放电源的放电源的搜索方法,以及为其提供一种装置。 解决方案:基于放电信号(电磁波)的时间差来指定包括放电源P的放电区域A,根据发射的电磁波的频率特性来确定放电源P的种类 从放电源P开始,并且从放电区域A的放电源P的位置由判定结果确定。 通过识别放电信号的距离衰减特性以及放电源P是否异常,通过将电荷的排出量与电量的允许排出量Q'进行比较来计算出电量Q的放电量 收费。 版权所有(C)2005,JPO&NCIPI
    • 10. 发明专利
    • Dust removing device
    • 除尘装置
    • JP2007113232A
    • 2007-05-10
    • JP2005304362
    • 2005-10-19
    • Kanden Engineering:Kk株式会社かんでんエンジニアリング
    • OKADA SHIGEHISAITO YASUHIRO
    • E02B9/04B01D29/00B01D36/04E02B5/08F03B11/08
    • Y02E10/22Y02E10/226
    • PROBLEM TO BE SOLVED: To provide a dust removing device capable of greatly reducing labor and cost required for maintaining and managing power generation facility by removing dust mixed into water for hydraulic power generation by a simple configuration securely.
      SOLUTION: This dust removing device 10 is provided with a water storage tank 16 having an intake 30 for taking water into in an upper part, a dust removing screen 18 attached to the intake 30 by tilting and letting a part of water given into the intake 30 flow down to the outside of the water storage tank 16 together with dust, and a water conducting tube 26 for conducting water in the water storage tank 16 into a hydraulic power generator 14. An opening end on the upstream side of the water conducting tube 26 is arranged at a position which is deviated to a side from just below the intake 30 in the water in the water storage tank 16 and is lifted from a bottom face of the inside of the water storage tank 16.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种除尘装置,通过简单的结构可靠地除去混合在水中的灰尘,能够大大降低维护和管理发电设备所需的劳动力和成本。 解决方案:该除尘装置10设置有具有用于将水吸入上部的进气口30的储水箱16,通过倾斜并使一部分给水的一部分水附着到进气口30的除尘丝网18 入口30与灰尘一起向下流到储水箱16的外部,以及用于将储水箱16中的水导入液压发电机14的导水管26。 导水管26配置在从储水箱16的水中的进气口30的正下方偏离的一侧的位置,从储水箱16的内侧的底面起升。 版权所有(C)2007,JPO&INPIT