会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 10. 发明授权
    • Methods of completing an uncemented wellbore junction
    • 完成井下无缝井眼结的方法
    • US06241021B1
    • 2001-06-05
    • US09349386
    • 1999-07-09
    • John S. Bowling
    • John S. Bowling
    • E03B311
    • E21B41/0042
    • A method of completing an uncemented wellbore junction provides a well completion in which a tubular assembly is installed through a wellbore junction and then is left uncemented in the junction. Fluid communication is permitted between the interior of the assembly and a formation surrounding the junction after the completion. The method is especially useful in situations in which the formation surrounding the junction is relatively impermeable or is in a production zone, and the method additionally permits convenient access to a lower portion of a main wellbore for stimulation or abandonment purposes after the completion.
    • 完成未塞入井眼结的方法提供了一个很好的完成,其中管状组件通过井孔结安装,然后在接合处未被塞住。 在组件的内部和完成后的连接处周围的地层之间允许流体连通。 该方法在其中围绕连接处的地层相对不可渗透或处于生产区域的情况下特别有用,并且该方法另外允许在完成之后方便地进入主井筒的下部以用于刺激或放弃目的。