会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 52. 发明专利
    • Method for laying intake pipe
    • 安装管道的方法
    • JP2003301484A
    • 2003-10-24
    • JP2002110747
    • 2002-04-12
    • Maeda CorpSekisui Chem Co LtdToyo Constr Co Ltd前田建設工業株式会社東洋建設株式会社積水化学工業株式会社
    • UTATSU YOICHIYASUDA AKIHIKOFUJIO YOSHINARIHASHIMOTO MASAYUKI
    • E03B3/04F16L1/12
    • PROBLEM TO BE SOLVED: To provide a method for laying an intake pipe on the bottom of the sea capable of laying the intake pipe at a low cost without requiring any special working craft. SOLUTION: The method for laying the intake pipe connected to a intake base 1 in the sea includes a process for making a unit length of pipe 4 by connecting a plurality of synthetic resin-made pipes to each other on the ground, a process for mounting concrete-made ballast 5 on the unit length of pipe 4 at prescribed intervals and, at the same time, arranging a plurality of barges in a line on the sea to load ballast mounting parts of the unit length of pipe 4 on them to transport the unit length of pipe 4 by sea, a process for installing the unit length of pipe 4 on the bottom 7 of the sea and a process for temporarily fixing the front end of the unit length of pipe 4 to an anchor and connecting the following unit length of pipe 4 to the front end of the unit length of pipe 4 constructed in advance to successively construct the unit length of pipe on the bottom of the sea to make the intake pipe. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供一种在不需要任何特殊工作工具的情况下以低成本铺设入口管的海底底部放置进气管的方法。 < P>解决方案:将与吸入基座1连接的入口管放置在海中的方法包括通过在地面上连接多根合成树脂制管而制造管4的单位长度的工序, 以规定的间隔将混凝土制造的镇流器5安装在管4的单元长度上的过程,并且同时在船上排列多个驳船以将管道4的单位长度的压载安装部件装载在其上 运输海上管4的单位长度,将管4的单位长度安装在海底7的过程以及将管4的单位长度的前端临时固定到锚上并将 将管道4的单位长度连接到预先构造的管道4的单元长度的前端,以连续地构造在海底的管道的单位长度以制造进气管。 版权所有(C)2004,JPO
    • 54. 发明专利
    • Construction method for outside insulation
    • 外绝缘施工方法
    • JP2003027618A
    • 2003-01-29
    • JP2001215478
    • 2001-07-16
    • Toyo Constr Co Ltd東洋建設株式会社
    • SASAKI TETSUYAYASUDA MASAYUKIARAKANE NAOKI
    • E04B1/76E04B1/80
    • PROBLEM TO BE SOLVED: To provide a construction method for a reinforced concrete building, in which much time for the execution of works is not required and which has high heat-insulation properties and high strength, can display high waterproofing performance and has an outside insulation.
      SOLUTION: A heat-insulation solid wire mesh 1 in which welded wire meshes 3 formed of flat steel are arranged on both surfaces of a tabular heat-insulating material 2 and the welded wire meshes 3 on the both surface sides, are unified with the heat-insulating material 2 by latticed wires 4 which penetrate the heat-insulating material 2 in the thickness direction is disposed so as to cover the exterior wall surface of the building; a mortar layer 10 is formed so as to bury the welded wire meshes 3 on the exterior wall surface side of the wire mesh 1; and the wire mesh 1 is used as a sheathing board on the exterior wall surface side of a skeleton section when concrete is placed to the skeleton section of the reinforced concrete building.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:为了提供一种钢筋混凝土建筑物的施工方法,其中不需要执行工程的时间长,并且具有高绝热性和高强度,可显示高防水性能并具有外部绝缘 。 解决方案:在平板状绝热材料2的两面配置由扁平钢构成的电焊网3的绝热实心丝网1,两面的焊丝3均与热量一致 通过在厚度方向上穿透绝热材料2的网格线4将绝缘材料2设置成覆盖建筑物的外壁表面; 形成砂浆层10,以将焊丝3焊接在丝网1的外壁面侧; 并且当混凝土被放置在钢筋混凝土建筑物的骨架部分时,金属丝网1用作骨架部分的外壁表面侧上的护板。
    • 55. 发明专利
    • Precast concrete form and manufacture of precast concrete
    • 预制混凝土预制件和预制混凝土的制造
    • JPH11280253A
    • 1999-10-12
    • JP8402598
    • 1998-03-30
    • Toyo Constr Co Ltd東洋建設株式会社
    • SASAKI TETSUYA
    • E04G9/06
    • PROBLEM TO BE SOLVED: To provide a precast concrete form by which huge precast concrete blocks for use in beams or columns can be manufactured with good quality at a construction site, and which is easy to convey and to provide a method for manufacturing the precast concrete blocks by use of the precast concrete form.
      SOLUTION: A precast concrete form 1 is for manufacturing a plurality of precast concrete blocks in a building construction site while the plurality of precast concrete blocks are aligned in a direction perpendicular to the longitudinal direction of the precast concrete blocks which is oriented in the horizontal direction. The precast concrete form 1 has a bottom plate 2 forming one longitudinal side of each precast concrete block, a plurality of side forms ... forming the longitudinal sides of the plurality of precast concrete blocks, and a plurality of end plates 5... individually forming both of the longitudinal end faces of each precast concrete block, and the bottom part 2, the plurality of side forms 3..., and the plurality of end plates 5... can be assembled and separated.
      COPYRIGHT: (C)1999,JPO
    • 要解决的问题:提供一种预制混凝土形式,通过该预制混凝土形式,可以在施工现场以高质量制造用于梁或立柱的大型预制混凝土块,并且易于输送并提供制造预制混凝土的方法 通过使用预制混凝土形式的块。 解决方案:预制混凝土结构1用于在建筑施工现场制造多个预制混凝土块,同时多个预制混凝土块沿垂直于水平方向取向的预制混凝土块纵向的方向排列 。 预制混凝土模型1具有形成每个预制混凝土块的一个纵向侧的底板2,形成多个预制混凝土块的纵向侧面的多个侧面形状,以及多个端板5 ... 分别形成每个预制混凝土块的两个纵向端面,并且可以组装和分离底部2,多个侧板3 ...和多个端板5 ...。
    • 58. 发明专利
    • Construction method of ground improvement pile
    • 地基改良桩施工方法
    • JP2013213401A
    • 2013-10-17
    • JP2013130436
    • 2013-06-21
    • Maeda Corp前田建設工業株式会社Toyo Constr Co Ltd東洋建設株式会社Aomi Construction Co Ltdあおみ建設株式会社Taiyo Kiso Kk大洋基礎株式会社
    • SHIMIZU HIDEKIISANO TAKASHISATO HIDEYUKIITAGAKI KOZOSASAKI TAKANORI
    • E02D3/08
    • PROBLEM TO BE SOLVED: To provide a construction method of a ground improvement pile which can efficiently construct a large-diameter ground improvement pipe without performing driving-back by a casing pipe.SOLUTION: A large-diameter casing pipe comprises an upper casing pipe 1 formed to have a diameter smaller than a finished diameter of a ground improvement pile to be constructed and a lower casing pipe 2 formed to have a large diameter approximately equal to the finished diameter of the ground improvement pile to be constructed, and is provided with preceding parts 3, 3 for drilling the ground at the tip thereof. A filling material is fed into the casing pipe while generating stresses of the circumferential ground in the lateral direction to forcibly increase density thereof by penetrating the casing pipe into the ground. The filling material in the casing pipe is discharged into the ground while pulling out the casing pipe. A ratio of the length of the upper casing pipe 1 to that of the lower casing pipe 2 is changed according to soil properties.
    • 要解决的问题:提供一种可以有效地构造大直径地面改进管而不用套管进行回退的地面改进桩的施工方法。解决方案:一种大直径套管包括上套管1 形成为具有比要构造的地面改良桩的成品直径小的直径,以及形成为具有与要构造的地面改良桩的最终直径大致相等的大直径的下套管2,并且设置有前 用于在其尖端钻地面的部分3,3。 将填充材料供给到套管中,同时沿横向方向产生周向地面的应力,通过将套管穿入地面来强制增加其密度。 套管中的填充材料在拉出套管时被排出到地面中。 上套管1的长度与下套管2的长度的比率根据土壤性质而变化。