    • Outer wall-holding method in construction work accompanied with preservation of existing outer wall
    • 建筑工程中的外墙保持方法与现有的外墙保持一致
    • JP2014148845A
    • 2014-08-21
    • JP2013018400
    • 2013-02-01
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • OYAMA TOSHIHARUTAKAO TAKESHIITO NOBUOIGARASHI TATSUYAYAMAKAWA SHOJITAKATSU HIROTOTANNO YOSHIOKITANI SOICHIKANAO TAKEHIRO
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide an outer wall-holding method for easily and surely disassembling the building inside and advancing new construction work, while leaving the preservation outer wall, by preventing overturning of the preservation outer wall.SOLUTION: A main column corresponding to a height of an outer wall is vertically erected on the ground along one surface out of inner and outer surfaces of a preservation outer wall part designated as being preserved in an existing building or a not preserving outer wall part undesignated as to be preserved. The main columns are mutually supported by assembling a support frame by connecting the respective main columns by a lateral tie beam material in the horizontal direction. A horizontal support arm of projecting to an opposite side surface is installed by using an opening part of a preservation outer wall from the respective main columns. A holding frame for supporting the opposite side surface of the preservation outer wall is assembled in a lattice structure in the vertical-horizontal direction by using the support arm. An overhead support frame is installed between upper end parts of the main columns for holding at least two outer walls, and an existing outer wall holding structure of a three-dimensional structure is constructed by connecting it to the upper end parts of the respective main columns.
    • 要解决的问题:提供一种外墙保持方法,用于容易且可靠地拆卸建筑物并推进新的施工工作,同时离开保护外壁,防止翻倒保护外壁。解决方案:对应于 外墙的高度沿着指定为保存在现有建筑物中的保护外壁部分的内表面和外表面的一个表面竖立竖立,或者未被保护的未保存的外壁部分。 通过在水平方向上通过侧向束材料连接相应的主支柱来组装支撑框架来相互支撑主支柱。 通过使用来自相应主列的保护外壁的开口部分来安装突出到相对侧表面的水平支撑臂。 用于支撑保护外壁的相对侧表面的保持框架通过使用支撑臂在垂直方向上组装成格子状结构。 顶柱支撑框架安装在主柱的上端部分之间,用于保持至少两个外壁,并且现有的三维结构的外壁保持结构通过将其连接到各个主柱的上端部而构成 。
    • 45. 发明专利
    • Base plate with vertical rib
    • 基板与垂直RIB
    • JP2006104780A
    • 2006-04-20
    • JP2004293380
    • 2004-10-06
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • UMEKUNI AKIRAKITANI SOICHIKANEKO HIROFUMIUSAMI TORUONO YOSHINOBU
    • E04B1/24
    • PROBLEM TO BE SOLVED: To provide a base plate with vertical ribs used as a column base member of a steel column or the like.
      SOLUTION: The base plate with vertical ribs is composed of a base plate fixed as the column base member of the steel column or the like to anchor bolts of a foundation part, and a plurality of vertical ribs rising on the upper face of the base plate in such an arrangement as to externally contact the steel column or the like. At least the base plate is manufactured from cast iron, cast steel or forged steel, and the steel column or the like erected on the base plate is welded to the externally contacting vertical ribs or joined to them by bolts.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种具有用作钢柱等的柱基构件的垂直肋板的基板。 解决方案:具有垂直肋的基板由固定为钢柱等的柱基部件的基板构成,用于锚固基座部件的螺栓,并且在上表面上上升的多个垂直肋条 基板以与钢柱等外部接触的布置。 至少底板由铸铁,铸钢或锻钢制成,并且竖立在基板上的钢柱等焊接到外部接触的垂直肋上或通过螺栓与它们接合。 版权所有(C)2006,JPO&NCIPI
    • 46. 发明专利
    • Pile head processing construction method of cast-in-place concrete pile
    • 混凝土桩的桩头加工施工方法
    • JP2006037492A
    • 2006-02-09
    • JP2004218539
    • 2004-07-27
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • KITANI SOICHIARAI MITSUNORI
    • E02D5/34
    • PROBLEM TO BE SOLVED: To provide a pile head processing construction method for removing and processing a defective concrete part generated in a pile head of a cast-in-place concrete pile in a state of being statically near to no-noise and no-vibration.
      SOLUTION: Curing materials 6 isolated from concrete are installed on respective pile main reinforcements 2a, and a pile reinforcement 2 is built up in a pile hole 1 excavated in the ground, and the cast-in-place concrete pile 3 is constructed by placing the concrete. After hardening the concrete, the ground 4 is excavated up to a position for exposing the defective concrete part B. A substantially horizontal cut 5 is formed up to a depth without damaging the pile main reinforcements 2a in a lower limit corresponding part C of the defective concrete part B. A plurality of pile head processing materials 7 constituted as a thin plate-shaped hydraulic jack are distributed and pushed in the circumferential direction in a clearance of the cut 5, and inlet valves 7a of the respective pile head treatment materials 7 are connected to a pipe 8 of a fluid pump 10. The pile head processing materials 7 are expanded by sending high pressure fluids into the pile head processing materials 7 by operating the pump 10, and the defective concrete of the pile head is crushed and removed.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种在静止接近无噪声的状态下去除和处理在现浇混凝土桩的桩头中产生的有缺陷的混凝土部件的桩头加工施工方法,以及 无振动。 解决方案:将从混凝土隔离的固化材料6安装在各桩主加强件2a上,并且在挖掘在地面上的桩孔1中建立桩加固件2,并且构建现浇混凝土桩3 通过放置混凝土。 在硬化混凝土之后,将地面4挖出直到露出有缺陷的混凝土部分B的位置。基本上水平的切口5形成为深度,而不会损坏桩主加强件2a的缺陷相对应部分C的缺陷 构成薄板状液压千斤顶的多个堆头处理材料7在切割5的间隙中沿圆周方向分布并推动,各桩头处理材料7的入口阀7a 连接到流体泵10的管道8.桩头处理材料7通过操作泵10将高压流体送入桩头加工材料7而膨胀,并且将桩头的有缺陷的混凝土压碎并除去。 版权所有(C)2006,JPO&NCIPI