    • 32. 发明专利
    • METHOD OF REINFORCING GROUND AND CONTROLLING TEMPERATURE THEREOF
    • JPH0480414A
    • 1992-03-13
    • JP19298790
    • 1990-07-23
    • TAISEI CORP
    • HASHIMOTO ISAOIZEKI HIDEOARIYAMA MOTOSHIGE
    • E02D3/12E02D27/38
    • PURPOSE:To reinforce the ground and prevent the peripheral ground from freezing by inserting a hollow pipe into the ground to infiltrate hardener thereinto with the pressure before solidifying the harnener infiltrated into the ground, and circulating thermal medium in the hollow pipe. CONSTITUTION:A filling hole bored in the ground is filled with hardener 2 such as cement milk, mortar, water glass. Before the hardener 2 is solidified, a packer is placed around the hole for preventing the overflow of the hardener, a hollow pipe 3 having the colsed lower end is inserted thereinto, and the hardener is infiltrated into voids of the ground with the pressure. After that, the upper end of the hollow pipe 3 is covered with a lid, and an internal pipe 5 is inserted through the lid. A branch pipe 6 is projected to the side of the upper end of the hollow pipe 3, pipes linked to heating sources are respectively connected to the internal pipe 5 and the branch pipe 6, and thermal medium of liquid or gas is circulated in the hollow pipe 3. According to the constitution, the reinforcement and temperature control of the peripheral ground can be made.
    • 33. 发明专利
    • INCLINATION MEASURING INSTRUMENT
    • JPH0448211A
    • 1992-02-18
    • JP15757590
    • 1990-06-18
    • TAISEI CORP
    • NAKANISHI AKIRAHASHIMOTO ISAOARIYAMA MOTOSHIGE
    • E21B47/022G01C9/00G01C9/06
    • PURPOSE:To increase measurement accuracy in a displacement direction by providing plural joints which are so coupled as to allow mutual free inclination, a data processing part which calculates a horizontal displacement quantity by comparing variation of color data sent from a photodetection part, etc. CONSTITUTION:The device consists of the joints 2a, 2b... which are constant in length and so coupled as to allow mutual free inclination, color coordinate plates 24 which are provided on one-surface opposite sides of coupling parts 22 and have various colors, light emission parts 20 which emit light to color coordinate plates 24 provided on the other-surface opposite sides of the coupling parts 22, photodetection parts 23 which project the colors of the color coordinate plates 24, and the data processing part 5 which compares the variation of the color data sent from the photodetection parts 23 to calculate the horizontal displacement quantity. Therefore, the displacing directions and horizontal displacement quantities of the bedrock can accurately be grasped in real time. Consequently, the horizontal displacement quantity and displacing direction in the ground can be measured automatically with high accuracy.
    • 34. 发明专利
    • PILE DRIVING METHOD
    • JPH03286021A
    • 1991-12-17
    • JP8802090
    • 1990-04-02
    • TAISEI CORP
    • HASHIMOTO ISAOARIYAMA MOTOSHIGENAKANISHI AKIRA
    • E02D5/54
    • PURPOSE:To enlarge the outer diameter of a pile by inserting a hollow pile into a hole bored in the ground, injecting pressed hardener into the hole through the hollow, and making the hardener permeate the ground around the hole. CONSTITUTION:A prescribed hole 1 is bored having a diameter almost equal to the outer diameter of a hollow pile 2 to be driven into the ground. To the upper part of the injection hole 21 of the pile 2, a pressure pump P is connected for a hardener 4 through a hose 3. The pile 2, having the outer diameter almost equal to the inner diameter of the hole 1, is once hung up and then driven into the hole 1 by its self-weight. After the pile 2 is driven up to a prescribed depth, the pump P is operated to supply the hardener 4, such as cement milk and mortar, and, to discharge it from the tip open port of the pile 2 into the hole 1. The hardener 4 in addition is injected around the pile 2 and then, before it is hardened, it is further injected with higher pressure.
    • 35. 发明专利
    • CONSTRUCTION OF UNDERGROUND SPACE
    • JPH03217599A
    • 1991-09-25
    • JP1336090
    • 1990-01-23
    • TAISEI CORP
    • NAKANISHI AKIRAHASHIMOTO ISAOARIYAMA MOTOSHIGE
    • E21D13/02
    • PURPOSE:To make efficient the construction of an underground space by blocking a certain area by a vertical insulation zone formed underground, and giving reaction force to a portion of floor in a rising work room provided in the underground over the whole closed area to push up a ceiling section together with earth in the upper part thereof. CONSTITUTION:An underground wall and vertical shaft, etc., as an underground insulation zone are constructed to a certain depth, and a certain area is surrounded thereby. After that, a rising work room 2 is horizontally constructed over the whole area in a closed area by making use of the vertical shaft. Then, A floor 3 and ceiling 4 in the rising work room 2 are covered with a coated surface such as a thick reinforced concrete, etc., to form a pressure resisting plate, and a plurality of jacks 6 inside the rising work room 2 are set on the pressure resisting plate of the floor 3. The whole jacks 6 is expanded while checking the displacement of the ground. earth 5 is raised, a retaining wall 8, etc., are constructed to prevent a breakdown, and the weight is born by columns 7. According to the constitution, moving work of a huge volume of earth can be omitted.
    • 37. 发明专利
    • In situ decontamination system of contaminated ground water
    • 污染地下水污染物排放系统
    • JP2005131533A
    • 2005-05-26
    • JP2003370152
    • 2003-10-30
    • Taisei CorpToho Gas Co Ltd大成建設株式会社東邦瓦斯株式会社
    • KIRIYAMA HISASHIFUJIWARA HIDEKITAKAHATA AKIRAARIYAMA MOTOSHIGEIKEGAMI KAZUHIRO
    • B09C1/10C02F7/00
    • Y02W10/15
    • PROBLEM TO BE SOLVED: To provide a in situ decontamination system of contaminated ground water that is capable of effecting the uniform and rapid decontamination, and economically and effectively conducting the decontamination of the contaminated substance in situ by promoting the circulation of the ground water, the vaporization and diffusion of the contaminated substance and the activation of microorganic decomposition notwithstanding the situation of foundation by means of the decontamination equipment using the pumping water circulation method in combination with the sparging method of simple installations. SOLUTION: The in situ decontamination system 1 of the contaminated ground water is provided with a sparging well 10 for forcing air A and liquid W into soil and a pumping well 40 for pumping the contaminated ground water. The system forces the air A into the soil from the sparging well 10 and simultaneously forces the liquid W into the soil, and pumps the contaminated ground water from the pumping well. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供能够实现均匀快速净化的污染地下水的原位去污系统,并通过促进地面循环经济有效地对污染物质进行去污染 水,污染物质的蒸发和扩散以及微生物分解的活化,尽管通过使用抽水循环方法的净化设备与简单安装的喷射方法结合的基础情况。 解决方案:污染地下水的原位去污系统1设置有用于迫使空气A和液体W进入土壤的喷射井10和用于泵送污染的地下水的泵送井40。 该系统迫使空气A从喷射井10进入土壤,并同时迫使液体W进入土壤,并从泵送井抽取污染的地下水。 版权所有(C)2005,JPO&NCIPI
    • 38. 发明专利
    • SLIME-REMOVING EQUIPMENT FOR WIDENING EXCAVATION GROOVE
    • JPH11117302A
    • 1999-04-27
    • JP28003097
    • 1997-10-14
    • TAISEI CORP
    • USUI NAOTOYONEMURA MITSUFUMINISHIOKA IWAOARAI MASAOARIYAMA MOTOSHIGE
    • E02D15/06
    • PROBLEM TO BE SOLVED: To increase the capacity of slime-removing equipment by moving up or down a treatment device equipped with a slime-suction means moving around in the widened breadthwise direction through a guide in the guide groove for excavating the breadth. SOLUTION: A slime-treatment device B constituted of a frame body 14 equipped with a slime-suction part S which is movable breadthwise, is equipped in a guide member 13 erected in a guide groove 10 to widen the breadth for excavating the position right under an obstacle U in the underground. And the device B is hung down by a crane 16 to freely rise and fall. A slime-suction opening 18 having a size corresponding to the excavation part 17 for the widened breadth and a delivery pipe 21 having a slimetreatment part 20 connected to a suction pump 19 are fitted to the arm 22, in the slime-suction part S. The slime-suction opening 18 can be freely turned to any required positions of the excavation part 17 by a hydraulic cylinder 24. Slime C sucked up by the suction pump 19 through the delivery pipe 21 is sent to a soil separator and treated therein. In this way, slime can be securely removed and the cut-off function of a continuous underground wall can be improved and the cost can be reduced.