- 专利标题: 건설 프로젝트의 시간-비용 상충 문제를 해결할 수 있는 다중 목적 최적화 모델링 방법 및 장치
- 专利标题(英):Method and apparatus for processing multi-objective optimization model for solving time-cost trade-off problems in construction projects
- 专利标题(中):用于处理多目标优化模型的方法和装置,用于解决建筑项目中的时间成本贸易问题
- 申请号:KR1020120081630 申请日:2012-07-26
- 公开(公告)号:KR1020140014760A 公开(公告)日:2014-02-06
- 发明人: 홍태훈 , 구충완 , 지창윤 , 김지민 , 김현중
- 申请人: 연세대학교 산학협력단
- 申请人地址: 서울특별시 서대문구 연세로 ** (신촌동, 연세대학교)
- 专利权人: 연세대학교 산학협력단
- 当前专利权人: 연세대학교 산학협력단
- 当前专利权人地址: 서울특별시 서대문구 연세로 ** (신촌동, 연세대학교)
- 代理人: 김인철
- 主分类号: G06Q50/08
- IPC分类号: G06Q50/08 ; G06Q10/06 ; G06Q50/10
摘要:
A time-cost optimization modeling method of a building project structurized as step unit activities applying various techniques and resources is provided. To display a time index and a cost index to be optimized as technique and resource functions, the method includes a step of defining a determination flat surface as the minimum extreme point and the maximum extreme point of the cost index and the time index obtained when the construction project progresses by applying the techniques and the resources, a step of mapping the determination flat surface with a standardization index flat surface and calculating one or more optimized values through genetic algorithm based on chromosomes having the techniques and the resources for each unit activity as genes in regard to standardized index points in the standardization index flat surface, and a step of generating one or more construction projects by combining the techniques and the resources corresponding to the value. [Reference numerals] (AA) Start; (BB) End; (S41) Structure a project by step unit activities to which more than one alternative can be applied; (S42) Define a determination space by minimum extreme points of indexes within a basic index space; (S43) Map the determination space onto a standardized index space which is dimensionless and normalized; (S44) Calculate at least one optimized value through a genetic algorithm based on chromosomes having alternatives to each unit activity as genes in regard to standardized index points; (S45) Generate at least one project by combining alternatives corresponding to at least one optimized value
摘要(中):
提供了构建为应用各种技术和资源的步骤单元活动的建筑项目的时间成本优化建模方法。 为了显示作为技术和资源功能优化的时间索引和成本指标,该方法包括将确定平面定义为成本指数的最小极值点和最大极值点以及当 施工项目通过应用技术和资源进行,通过基于具有每个单位活动的技术和资源的基因的染色体作为基因的遗传算法计算一个或多个优化值,将测定平面映射到标准化指标平面的步骤 关于标准化指标平面图中的标准化指标点,以及通过组合技术和与该值对应的资源来生成一个或多个建设项目的步骤。 (附图标记)(AA)开始; (BB)结束; (S41)通过单位活动构建一个项目,可以应用多个替代方案; (S42)在基本索引空间内通过索引的最小极值点定义确定空间; (S43)将确定空间映射到无量纲和标准化的标准化索引空间; (S44)通过基于具有替代每个单位活动的染色体的遗传算法作为关于标准化索引点的基因来计算至少一个优化值; (S45)通过组合与至少一个优化值相对应的备选方案来生成至少一个项目
公开/授权文献:
- KR101494739B1 건설 프로젝트의 시간-비용 상충 문제를 해결할 수 있는 다중 목적 최적화 모델링 방법 및 장치 公开/授权日:2015-02-25
信息查询:
EspacenetIPC结构图谱:
G | 物理 |
--G06 | 计算;推算;计数 |
----G06Q | 专门适用于行政、商业、金融、管理、监督或预测目的的数据处理系统或方法;其他类目不包含的专门适用于行政、商业、金融、管理、监督或预测目的的处理系统或方法 |
------G06Q50/00 | 专门适用于特定经营部门的系统或方法,例如保健、公用事业、旅游或法律服务 |
--------G06Q50/08 | .建筑 |