基本信息:
- 专利标题: Tunnel excavation system
- 专利标题(中):隧道掘进系统
- 申请号:JP2012142839 申请日:2012-06-26
- 公开(公告)号:JP2014005677A 公开(公告)日:2014-01-16
- 发明人: KOYAMA YUKINORI , KANO TOSHIYUKI , TAKEDA MITSUO , OZAWA IKUO , YAMAMOTO HIROAKI , SAKAMOTO MASAAKI , YOSHIKAWA TADASHI , AKOJIMA TAKAO , SATO TATSURO , HAGA HIROSHI , TEZUKA HITOSHI , SENDAI KEIZO , SAKAMOTO SHUNICHI , KAYANO KOICHI , KAKIMI KOSUKE , IMASAKA MAKOTO , TATEISHI YOJI , HANAOKA TAIJI , KANAI SEIICHIRO
- 申请人: Kabuki Construction Co Ltd , 株木建設株式会社 , Advanced Construction Technology Center , 一般財団法人先端建設技術センター , Ohbayashi Corp , 株式会社大林組 , Kajima Corp , 鹿島建設株式会社 , Kumagai Gumi Co Ltd , 株式会社熊谷組 , Shimizu Corp , 清水建設株式会社 , Taisei Corp , 大成建設株式会社 , Hitachi Zosen Corp , 日立造船株式会社 , Nippon Civic Engineering Consultant Co Ltd , 日本シビックコンサルタント株式会社
- 专利权人: Kabuki Construction Co Ltd,株木建設株式会社,Advanced Construction Technology Center,一般財団法人先端建設技術センター,Ohbayashi Corp,株式会社大林組,Kajima Corp,鹿島建設株式会社,Kumagai Gumi Co Ltd,株式会社熊谷組,Shimizu Corp,清水建設株式会社,Taisei Corp,大成建設株式会社,Hitachi Zosen Corp,日立造船株式会社,Nippon Civic Engineering Consultant Co Ltd,日本シビックコンサルタント株式会社
- 当前专利权人: Kabuki Construction Co Ltd,株木建設株式会社,Advanced Construction Technology Center,一般財団法人先端建設技術センター,Ohbayashi Corp,株式会社大林組,Kajima Corp,鹿島建設株式会社,Kumagai Gumi Co Ltd,株式会社熊谷組,Shimizu Corp,清水建設株式会社,Taisei Corp,大成建設株式会社,Hitachi Zosen Corp,日立造船株式会社,Nippon Civic Engineering Consultant Co Ltd,日本シビックコンサルタント株式会社
- 优先权: JP2012142839 2012-06-26
- 主分类号: E21D9/06
- IPC分类号: E21D9/06 ; E21D9/12
摘要:
PROBLEM TO BE SOLVED: To provide a tunnel excavation system in which clogging by excavated earth is hardly caused when the excavated earth resulting from excavation of a ground is conveyed backward.SOLUTION: In an excavation unit 10: a space 20E is formed in a rotary section shell body 20 and openings 36 are formed on a front end face of the rotary section shell body 20; excavated earth from an excavation mechanism 14 is accommodated in the space 20E through the openings 36; clearances 20D are formed between the rotary section shell body 20 and stationary portion shell bodies 22, 24, 26 on an inner side face of the excavation unit 10; the space 20E and a space on the inner side of the excavation unit 10 are communicated with each other through the clearances 20D, and the excavated earth accommodated in the space 20E is discharged in the inside of the excavation unit 10 through the clearances 20D; and a belt conveyor transports the excavated earth resulting from excavation of the ground by a breaker 62 along with the excavated earth discharged from the space 20E into the inside of the excavation unit 10 through the clearances 20D backward.
摘要(中):
要解决的问题:提供一种隧道挖掘系统,其中当挖掘地面所产生的挖掘的地面向后运输时,几乎不会引起挖土的堵塞。解决方案:在挖掘单元10中:空间20E形成为旋转 截面壳体20和开口36形成在旋转部壳体主体20的前端面上; 挖掘机构14的挖掘土体通过开口36容纳在空间20E中; 在挖掘单元10的内侧面上的旋转部壳体主体20与静止部壳体22,24,26之间形成有间隙20D, 挖掘单元10的内侧的空间20E和间隙通过间隙20D相互连通,容纳在空间20E中的被挖掘的土被通过间隙20D排出到挖掘单元10的内部。 带式输送机通过断路器62将挖掘的地面与通过间隙20D向后从空间20E排出到挖掘单元10的内部的挖土一起输送。
公开/授权文献:
- JP5967812B2 トンネル掘削システム 公开/授权日:2016-08-10
信息查询:
EspacenetIPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21D | 竖井;隧道;平硐;地下室 |
------E21D9/00 | 衬砌或不衬砌的隧道或平硐;其掘进的方法或设备;隧道、平硐的设计布置 |
--------E21D9/06 | .通过使用掘进护板 |