会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • ENERGY AND PRODUCTION OPTIMIZATION SYSTEM FOR FACTORY TO GRID INTEGRATION
    • 工厂到网络集成的能源和生产优化系统
    • WO2017083678A1
    • 2017-05-18
    • PCT/US2016/061571
    • 2016-11-11
    • SIEMENS AKTIENGESELLSCHAFTSIEMENS CORPORATION
    • GRUENEWALD, ThomasLO, GeorgeSONG, Zhen
    • G06Q10/06G06Q50/06
    • G06Q10/06312G06Q50/06Y02E40/76Y04S10/54Y04S10/545
    • Production tasks are scheduled to optimize production constraints while taking time varying energy prices into account. An energy management layer (EML) is in communication with a manufacturing domain as well as a smart grid domain. The EML receives information relating to a factory workflow, costs associated with operating units within the factory, and static utility information such as tariff models and incentives. Time variant energy price information is obtained from a utility regarding periodic price levels for a near future timeframe. The workflow is converted to a matrix representation that is acceptable to a mixed integer linear programming (MILP) solver. An algebraic factor representing a tradeoff between energy cost and full-capacity production is minimized to produce production variables which control production and limit production units and tasks to be performed during time slots that are most economically favorable.
    • 生产任务计划在优化生产约束的同时考虑时变能源价格。 能源管理层(EML)与制造领域以及智能电网领域进行通信。 EML接收与工厂工作流程相关的信息,与工厂内运营单位相关的成本以及关税模型和激励措施等静态效用信息。 时间变量能源价格信息是从关于不久的将来时间范围内的周期性价格水平的公用事业获得的。 工作流程被转换为矩阵表示,这是混合整数线性规划(MILP)求解器可以接受的。 表示能源成本和满负荷生产之间权衡的代数因素被最小化,以产生控制生产的生产变量,并限制生产单位和任务在最经济有利的时间段内执行。
    • 4. 发明申请
    • 自律式安定供給型再生可能エネルギー制御装置
    • 自动稳定供应型可再生能源控制装置
    • WO2017010213A1
    • 2017-01-19
    • PCT/JP2016/067727
    • 2016-06-15
    • 松尾建設株式会社
    • 松尾 哲吾藤吉 信博中嶋 孝次島 俊之
    • H02J3/38H02J3/00H02J13/00
    • H02J3/00H02J3/38H02J13/00Y02E10/58Y02E10/763Y02E40/72Y02E40/76Y04S10/12Y04S10/123Y04S10/545
    • 再生可能エネルギーから電力を発電する発電設備(12)に接続され、発電設備(12)で発電された電力を直流から交流に変換して出力すると共に出力する電力を操作量に比例して調節する比例制御式電力調節機能を有する電力変換機(14)と、電力変換機(14)から出力される電力の瞬時電力を検出する瞬時電力検出器(3)と、瞬時電力検出器(3)で検出された瞬時電力と発電電力設定部(5)で設定された目標値とを比較して比較信号を出力する比較部(4)と、比較部(4)により出力された比較信号を調節する制御部(6)と、制御部(6)で調節された比較信号を操作量として電力変換機(14)へ出力する出力信号部(7)とを備え、発電電力設定部(5)は、情報処理部により求められた発電量設定値に基づき前記目標値を設定するため、瞬時電力検出器(3)で検出される瞬時電力が発電電力設定部(5)で設定された目標値に制御される。
    • 本发明提供了一种电力转换器(14),其连接到用于从可再生能源发电的发电厂(12),并具有比例控制型电力调整功能,该功率调整功能在经过发电厂(12)产生的电力之后输出 将直流电流转换为交流电流,并将输出功率按比例调整为操纵电平; 瞬时功率检测器(3),其检测从功率转换器(14)输出的功率的瞬时功率; 比较单元(4),其比较由瞬时功率检测器(3)检测的瞬时功率和由发电功率设定单元(5)设定的目标值,并输出比较信号; 调整比较单元(4)输出的比较信号的控制单元(6)。 以及输出信号单元(7),其将由控制单元(6)调整的比较信号作为操作级别输出到功率转换器(14)。 由于所生成的功率设定单元(5)基于信息处理单元要求的发电电平设定值来设定目标值,所以将由瞬时功率检测器(3)检测出的瞬时功率控制为目标值设定值 通过发电功率设定单元(5)。
    • 6. 发明申请
    • FAST GENERATION ADJUSTMENT ALGORITHM FOR ENERGY MANAGEMENT SYSTEM
    • 能源管理系统的快速生成调整算法
    • WO2016074187A1
    • 2016-05-19
    • PCT/CN2014/090980
    • 2014-11-13
    • THE UNIVERSITY OF HONG KONG
    • TANG, YuchenZHONG, Jin
    • G06Q10/04
    • H02J3/382G05B15/02G06F17/11G06Q10/04G06Q30/0202G06Q50/06H02J3/46H02J2003/003Y02E40/76Y04S10/54Y04S10/545Y04S50/14
    • A method is proposed for real-time economic dispatch in power system operation, especially in systems that include renewable power sources that may cause heavy deviations from a generation schedule due to their uncertain outputs. According to the method an optimal generation schedule is obtained based on forecasted load data. This schedule has to be adjusted if the actual load and renewable energy source outputs unexpectedly deviate from the forecasted value. An algorithm employed in the method is capable of dictating generation adjustments which minimize total generation costs. The algorithm is a modification of the base point and participation factor method. It differs from existing methods in that a precise model of transmission losses is adopted in the algorithm to achieve higher accuracy in optimization. The proposed method also has significant advantage in execution speed so that it is suitable for real-time operation.
    • 提出了一种用于电力系统运行中实时经济调度的方法,特别是在可再生能源系统中,由于其不确定的产出,可能会导致重大偏离发电计划的系统。 根据该方法,基于预测的负载数据获得最优生成时间表。 如果实际负荷和可再生能源输出意外偏离预测值,则必须调整此时间表。 该方法中使用的算法能够决定最小化总发电成本的发电调整。 该算法是基点和参与因子方法的修改。 与现有方法不同的是,在算法中采用精确的传输损耗模型,以实现更高的优化精度。 所提出的方法在执行速度方面也具有显着的优点,因此适用于实时操作。
    • 7. 发明申请
    • ECONOMIC OPTIMIZATION OF POWER GENERATION SYSTEM WITH ALTERNATIVE OPERATING MODES
    • 具有替代运行模式的发电系统的经济优化
    • WO2015191428A1
    • 2015-12-17
    • PCT/US2015/034645
    • 2015-06-08
    • GENERAL ELECTRIC COMPANY
    • CHILLAR, Rahul, JaikaranCUSICK, Ernest, GeorgeMESTRONI, Julio, EnriqueRENFRO, Charles, Steven
    • G06Q10/06G06Q50/06
    • G05B13/021G05F1/66G06Q10/06G06Q50/06Y02E40/76Y04S10/545
    • Embodiments of the present disclosure provide an apparatus including: a controller communicatively coupled to a power generation system and configured to shift the power generation system between a first operating mode and a second operating mode, the second operating mode being different from the first operating mode; and a economic optimization engine in communication with the controller, wherein the economic optimization engine calculates: an economic benefit for shifting the power generation system from the first operating mode to the second operating mode based on at least one of a power generation demand, a power generation cost, and an operating condition of the power generation system; and a billing rate per unit of time of operation in the second operating mode based on at least one of the economic benefit, an operating difference between the first operating mode and the second operating mode, and a predetermined cost differential.
    • 本公开的实施例提供了一种装置,包括:通信地耦合到发电系统并且被配置为在第一操作模式和第二操作模式之间移动发电系统的控制器,所述第二操作模式不同于第一操作模式; 以及与所述控制器通信的经济优化引擎,其中所述经济优化引擎计算:将所述发电系统从所述第一操作模式转换到所述第二操作模式的经济益处,基于发电需求,功率 发电成本和发电系统的运行状况; 以及基于经济利益,第一操作模式和第二操作模式之间的操作差异以及预定成本差异中的至少一个,在第二操作模式中的每单位操作时间的计费率。
    • 8. 发明申请
    • TRANSFORMER WITH IMPROVED POWER HANDLING CAPACITY
    • 具有改进功率处理能力的变压器
    • WO2015164060A1
    • 2015-10-29
    • PCT/US2015/024553
    • 2015-04-06
    • TRANSFORMER LLC
    • AARON, JackSHAPIRO, HerbertJOHNSON, Robert
    • H01F27/28
    • H01F41/064G06F17/5063G06F17/5068G06F17/5081G06F2217/02G06F2217/06G06F2217/08G06F2217/78H01F3/10H01F27/24H01F27/245H01F27/28H01F27/2823H01F27/325H01F41/079Y02E40/76Y04S10/545Y10T29/49071
    • Disclosed is an electrical transformer for improved transformer power capacity and efficiency designed by the application of disclosed design considerations. One embodiment design consideration is a method to configure power transformer windings wherein the minimum distance of the primary windings from the winding axis/core center is greater (the primary windings are more distal) from the winding axis than the minimum distance of the secondary windings, which are wound around the minimum interior core diameter. This design consideration is extended from single bobbin transformer designs to split bobbin designs, with the requisite distal increase of the primary windings (from the core axis) geometrically provided by an enlarged core bobbin center leg (axial) dimension beneath the primary winding window. Another disclosed design consideration is to fix the primary winding length relationship to the core weight for given transformer specifications in accordance with the disclosed unexpected experimental results and formula.
    • 公开了一种电变压器,用于通过应用公开的设计考虑来改进设计的变压器功率容量和效率。 一个实施例设计考虑的是一种配置电力变压器绕组的方法,其中绕组轴线/铁芯中心的初级绕组的最小距离比绕组轴线的次级绕组的最小距离更大(初级绕组更远) 其围绕最小内芯直径缠绕。 这种设计考虑从单线轴变压器设计扩展到分裂绕线架设计,其中初级绕组(从芯轴线)必需的远程增加几何地由初级绕组窗口下方的放大芯线轴中心腿(轴向)尺寸提供。 另一个公开的设计考虑是根据所公开的意想不到的实验结果和公式,将给定变压器规格的初级绕组长度关系固定在芯重上。
    • 10. 发明申请
    • VERFAHREN ZUR RECHNERGESTÜTZTEN KONFIGURATION EINES ELEKTRISCHEN STROMNETZES
    • 法电力网络计算机辅助配置
    • WO2015078598A1
    • 2015-06-04
    • PCT/EP2014/066812
    • 2014-08-05
    • SIEMENS AKTIENGESELLSCHAFT
    • BAMBERGER, JoachimMÜNZ, Ulrich
    • H02J3/18H02J3/12H02J3/00
    • H02J3/16G06Q50/06H02J3/18H02J3/383H02J3/386H02J2003/007Y02E10/563Y02E40/34Y02E40/76Y02E60/76Y04S10/545Y04S40/22
    • Die Erfindung betrifft ein Verfahren zur rechnergestützten Konfiguration eines elektrischen Stromnetzes (PG). In dem Stromnetz sind als erste Netzknoten (Nl) netzbildende Erzeugerknoten und optional als zweite Netzknoten (N2, N3, N4) netzstützende Erzeugerknoten vorgesehen. Bei letzteren handelt es sich um regenerative Energieerzeugungsanlagen, wie z.B. Photovoltaikanlagen. In dem erfindungsgemäßen Verfahren werden Regelverfahren und insbesondere Proportionalregelungen der Erzeugerknoten basierend auf einem geeigneten dynamischen Modell des Stromnetzes derart eingestellt, dass ein Optimierungsproblem mit dem Ziel eines in Bezug auf ein oder mehrere Optimierungskriterien optimalen Betriebs des Stromnetzes gelöst wird. Insbesondere ist es dabei das Ziel des Optimierungsproblems, dass möglichst wenig der Wirkleistung, die für die Last im Stromnetz bereitgestellt ist, von den netzbildenden Erzeugerknoten stammt. Somit wird die meiste Wirkleistung im Stromnetz durch regenerative Energieerzeugungsanlagen generiert, so dass die Kosten der Energieerzeugung gering sind.
    • 本发明涉及一种用于电力网络(PG)的计算机辅助配置的方法。 在该电源系统是所述第一网络节点(NL)交流发电机形成节点和任选被提供作为第二网络节点(N2,N3,N4)的网络支持发生器节点。 后者是可再生能源发电的植物,如 光伏系统。 在本发明方法的控制方法,并且在发电机的节点的特定比例调节是基于电力网络的一个合适的动态模型设定为使得一个优化问题用的相对于一个或一个以上优化标准电力系统的最佳操作来实现的目标。 特别是,它是最优化问题的最小化提供了一种用于在电网负载来自于网络形成发电机节点的有功功率的量的目标。 因此,大部分的实权通过可再生能源发电设施,电网产生,发电成本低。