会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明申请
    • SYNCHRONIZED LIFTING ARM
    • 同步提升ARM
    • WO2015114472A3
    • 2015-11-26
    • PCT/IB2015050116
    • 2015-01-07
    • MHWIRTH AS
    • HOLEN BERNT OLAVSÆBØ TINE
    • E21B19/00E21B19/16
    • E21B19/00E21B19/165
    • Apparatus for lifting and/or moving operations of drilling equipment on a surface (40), comprising a suspension device with a lifting arm, wherein the lifting arm comprises at least a first polygon (10) and a second polygon (20) that can be connected to one another, the first polygon (10) comprising; a first beam (1) rotatably connected to a second beam (2); the second beam (2) is rotatably connected to a third beam (3); the third beam (3) is rotatably connected to a fourth beam (4); the fourth beam (4) is rotatably connected to the first beam (1).
    • 用于在表面(40)上提升和/或移动钻井设备的操作的装置,包括具有提升臂的悬挂装置,其中所述提升臂包括至少第一多边形(10)和第二多边形(20),所述第一多边形 彼此连接,所述第一多边形(10)包括: 可旋转地连接到第二梁(2)的第一梁(1); 第二梁(2)可旋转地连接到第三梁(3); 第三梁(3)可旋转地连接到第四梁(4); 第四梁(4)可旋转地连接到第一梁(1)。
    • 8. 发明申请
    • WELLHEAD PORT PLUG ASSEMBLY
    • 卫浴港口总装
    • WO2015162241A1
    • 2015-10-29
    • PCT/EP2015/058880
    • 2015-04-24
    • PETROLEUM TECHNOLOGY COMPANY AS
    • GUEDES, LinoBOLAGER, AndreKLEPPA, ErlingHARESTAD, KristianKVASNES, Trond
    • E21B23/02E21B33/03E21B33/12E21B34/00E21B19/00
    • E21B33/03E21B19/00E21B23/02E21B33/12E21B34/00E21B34/02E21B47/12E21B49/08E21B2049/085
    • A wellhead port plug assembly, comprising a first plug body (27, 73) comprising connection elements (28) allowing the first plug body to be sealingly and removably mounted in a port (22b) of a wellhead (21) of a hydrocarbon well. The plug assembly comprises a spool unit (24) displaying an axial through-channel (32) extending between a first end (24a) and a second end (24b) of the spool unit, which spool unit comprises a first flange section (33) arranged at the first end for sealingly mounting the spool unit to the wellhead aligning the through-channel with the port, and a second flange section (34) arranged at the second end; a second plug body (42, 74) comprising connection elements (43) allowing the second plug body to be sealingly and removably mounted in the through-channel; and a blind flange (26, 79) which is sealingly and removably mounted to the second flange section allowing the second plug body and the first plug body to be removed from the wellhead via the through-channel.
    • 一种井口端口插头组件,包括第一插头体(27,73),其包括连接元件(28),所述连接元件允许所述第一插塞体密封地并可移除地安装在烃井的井口(21)的端口(22b)中。 塞子组件包括一个卷轴单元(24),该卷轴单元显示在卷轴单元的第一端(24a)和第二端(24b)之间延伸的轴向通道(32),该卷轴单元包括第一凸缘部分(33) 布置在所述第一端处,以将所述卷轴单元密封地安装到所述井口,所述井口将所述通道与所述端口对准,以及布置在所述第二端的第二凸缘部分(34) 包括允许所述第二插头主体被密封地并可移除地安装在所述通道中的连接元件(43)的第二插头体(42,74) 以及盲密封凸缘(26,79),该凸缘密封地和可拆卸地安装到第二凸缘部分,从而允许第二塞体和第一塞体通过通道从井口移除。