会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • AUTOMATED WIRING APPARATUS AND METHOD
    • 自动接线装置及方法
    • WO2008114059A1
    • 2008-09-25
    • PCT/GB2008/050203
    • 2008-03-19
    • UNITED TECHNOLOGISTS EUROPE LIMITEDKAUFHOLD, Frank GerwinSWANN, Ian Albert EdwardWILLOUGHBY, John RichardFRANCIS, George William
    • KAUFHOLD, Frank GerwinSWANN, Ian Albert EdwardWILLOUGHBY, John RichardFRANCIS, George William
    • H01R43/01H01R43/28
    • H01R43/28H01R43/01Y10T29/49174Y10T29/53213
    • Automated wiring apparatus (20) is provided for the insertion and extraction of a length of wire (35) into a selected connector (74) on a connector block (22, 23). The apparatus (20) comprises a tool head (24) provide with one or more wire manipulation tools (30, 36, 38, 39, 49, 57) associated with effecting insertion and extraction of the wire (35). A supporting framework (25, 26) is mounted adjacent one or more connector blocks (22, 23) so as to define an operational plane for the tool head (24). The operational plane has mutually perpendicular X and Y axes, and is disposed parallel to and spaced from the connector blocks (22, 23). Positioning control means (41 ) are provided to locate the tool head (24) at any selected X1Y co-ordinates in the operational plane defined by the supporting framework (25, 26), said selected X1Y co-ordinates corresponding to a selected connector (74) on the connector blocks (22, 23), whilst wiring control means (54, 55, 56, 65, 72) are provided to actuate the wiring (30, 36, 38, 39, 49, 57) tools on the tool head (24), thereby to effect insertion or extraction of a wire (35) into a selected connector (74), as required.
    • 自动接线装置(20)用于将一段电线(35)插入和拔出到连接器块(22,23)上的选定连接器(74)中。 设备(20)包括工具头(24),其提供与实现线(35)的插入和抽出相关联的一个或多个线操纵工具(30,36,38,39,49,57)。 支撑框架(25,26)被安装在一个或多个连接器块(22,23)附近,以便限定用于工具头(24)的操作平面。 操作平面具有相互垂直的X和Y轴,并且与连接器块(22,23)平行并间隔设置。 提供定位控制装置(41)以将工具头(24)定位在由支撑框架(25,26)限定的操作平面中的任何选定的X1Y坐标处,所选择的X1Y坐标对应于所选择的连接器 74,25,56,65,72)连接在连接器块(22,23)上,同时设置布线控制装置(54,55,56,65,72)以致动工具上的布线(30,36,38,39,49,57)上的工具 头部(24),从而根据需要将线(35)插入或拔出到所选择的连接器(74)中。
    • 3. 发明申请
    • METHOD AND DEVICE FOR MONITORING INTEGRITY OF WOODEN POSTS
    • 监测木质品质的方法和装置
    • WO2013121170A1
    • 2013-08-22
    • PCT/GB2013/050076
    • 2013-01-15
    • UNITED TECHNOLOGISTS EUROPE LIMITEDKAUFHOLD, Frank Gerwin
    • KAUFHOLD, Frank Gerwin
    • G01N33/46G01N3/42G01N19/00
    • G01N33/46G01M5/0058G01N3/40G01N19/00
    • Method and Device for Monitoring Integrity of Wooden Posts A device (10) for monitoring the integrity of a wooden post (40) comprises an outer sleeve (11), a moveable pin (12), driving means (24) and indicating means (50). The outer sleeve (11) is adapted to be mounted in a pre-formed recess (41) of complementary size and shape extending from the outer surface (43) of a wooden post (40) substantially into the centre (45) thereof. The moveable pin (12) is mounted within the outer sleeve (11) and has a head (18) arranged normally to bear against wood at the centre (45) of the post (40). The driving means (24) is arranged to urge the pin head (18) against wood at the centre (45) of the post (40). The indicating means (50) denotes any movement of the pin (12) further into the post (40). When in use in a method of monitoring the integrity of a wooden post (40), the device (10) is located in a pre-formed recess (41) and the indicating means (50) is used periodically to monitor any movement of the pin (12) further into the post (40).
    • 用于监测木柱完整性的方法和装置用于监测木柱(40)的完整性的装置(10)包括外套筒(11),可动销(12),驱动装置(24)和指示装置 )。 外套筒(11)适于安装在从木质柱(40)的外表面(43)基本上延伸到其中心(45)的互补尺寸和形状的预先形成的凹部(41)中。 可移动销(12)安装在外套筒(11)内,并且具有正常布置以抵靠柱(40)的中心(45)处的木材的头部(18)。 驱动装置(24)布置成在销钉(40)的中心(45)处推动销头(18)抵靠木头。 指示装置(50)表示销(12)进一步进入柱(40)的任何运动。 当在用于监测木柱(40)的完整性的方法中使用时,装置(10)位于预先形成的凹部(41)中,并且周期性地使用指示装置(50)来监视 销(12)进一步进入柱(40)。